HomeMy WebLinkAboutS001FOUNDATION WATER-PROOFING NOTES: 1. AN APPROVED WATERPROOFING MEMBRANE IS REQUIRED FOR ALL EXTERIOR FOUNDATION WALLS THAT ENCLOSE THE BASEMENT AREA & SHALL EXTEND FROM TOP OF THE FOOTING TO THE FINISHED GRADE. 2. JOINTS IN THE MEMBRANE SHALL BE LAPPED & SEALED WITH AN ADHESIVE COMPATIBLE WITH THE WATERPROOFING MEMBRANE. TION OF THE RADON EXHAUST PIPE IN THE HVAC CHASE AREA. 5. PLUMBER AND HVAC SUBCONTRACTOR TO COORDINATE THE INSTALLA- ABOVE THE SURFACE OF THE ROOF IN A LOCATION 10 FEET AWAY FROM VERTICALLY INTO THE SUB SLAB AGGREGATE AND THROUGH THE UP THROUGH THE BUILDING FLOORS & TERMINATE AT LEAST 12 INCHES ANY WINDOW OR OTHER OPENINGS INTO THE CONDITIONED SPACES OF OF VERTICAL DISTANCE WHERE THE VENT PASSES THROUGH THE ATTIC IN ADDITION, FISCHER HOMES WILL PROVIDE APPROXIMATELY 6 FEET SHEETING BEFORE THE SLAB IS POURED. THE PIPE SHALL BE EXTENDED THE BUILDING THAT IS LESS THAN 2 FEET BELOW THE EXHAUST POINT. 3. A 3 INCH DIAMETER SCH 40 PVC PLUMBING TEE SHALL BE EMBEDDED FOR THE POSSIBLE INSTALLATION OF A FUTURE EXHAUST FAN. NOTE: ALL FITTINGS ARE TO GLUED AND SECURED AS NEEDED. FISCHER HOMES RADON REDUCTION SYSTEM NOTES: THE FOLLOWING ITEMS ARE TO BE INSTALLED AS PART OF FISCHER HOMES RADON REDUCTION SYSTEM: 1. A UNIFORM LAYER OF CLEAN AGGREGATE AT A MINIMUM OF 4 INCHES UNDER THE CONCRETE SLAB. 2. A 6 MIL POLYETHYLENE OR EQUIVALENT FLEXIBLE SHEETING MATERIAL SHALL BE PLACED ON TOP OF THE GRAVEL. THE SHEETING SHALL FIT CLOSELY AROUND ANY PIPE, WIRE, OR OTHER PENETRATIONS OF THE MATERIAL. ALL PUNCTURES OR TEARS IN MATERIALS SHALL BE SEALED OR COVERED WITH ADDITIONAL SHEETING. 4. TO PROVIDE FOR FUTURE INSTALLATION OF AN ACTIVE SYSTEM, AN ELECTRICAL CIRCUIT TERMINATED IN AN APPROVED BOX SHALL BE INSTALLED DURING CONSTRUCTION IN THE ATTIC WITHIN 6'-0" OF THE RADON PIPE FOR THE POSSIBLE INSTALLATION OF A FUTURE EXHAUST FAN. FOUNDATION GENERAL NOTES: 1. PROVIDE CONTROL JOINTS IN SLAB @ ALL BEAM AND COLUMN ℄'s - AND AS NOTED 2. USE 6 MIL POLY VAPOR BARRIER UNDER BASEMENT SLAB 3. USE PRESSURE-TREATED LUMBER @ ALL PLACES OF CONTACT w/ CONCRETE FOUNDATION WALL NOTES: BASEMENT FOUNDATION WALLS BASEMENT FOUNDATION WALLS ARE TO BE 10"thk., 9'-0"h. OFF T/ FOOTING. FOOTINGS TO BE 20"w. GARAGE FOUNDATION WALLS GARAGE FOUNDATION WALLS TO BE 8"thk., 3'-0"h. OFF T/ FOOTING. FOOTINGS TO BE 18"w. UNEXCAVATED UNEXCAVATED BASEMENT POWER VENT GAS WH 3'-8"1'-4" 1'-4"8"VERTICAL CONTROL JOINT - DETAIL 01/A2.1 58'-2" 2'-0"8" B.C.VERTICAL CONTROL JOINT - DETAIL 01/A2.1 14'-7" 8" B.C. 8'-912"15'-912" 12'-0" 76'-7"72'-11"4'-312"8" BRICK CURB16'-0" 1'-812"8" B.C.22'-0"8" BRICK CURB41'-1" 2x4 NOTCH SLOPE 3" FROM REAR TO FRONT FOR SLAB SUPPORT - SEE DETAIL 10/A2.1 HOLD T/ GARAGE SLAB DOWN 1" FROM T/ FDN. & SLOPE TO O.H. DOOR 6"thk. CONC. GARAGE SLAB - PROVIDE #4 RE-BARS @ 12"o.c. EA. WAY w/ MIN. 3" COVERAGE - REFER TO DTLS. 09 & 10/A2.1 1'-412" 8" B.C. 9'-0" 1'-712" 8" B.C. 33" x 33" x 15"d C.I.P. CONC. FOOTING - HOLD DOWN 3 12" FOR SLAB POUR THROUGH 12" x 20" GRADE BEAM - SEE DETAIL 06/A2.1 24" x 24" PIER - DEPTH TO BEARING SOIL - SEE DTL. 09/A2.1 36" x 36" x 8"d. C.I.P. CONCRETE FOOTING - SHOWN BELOW PIER - SEE DTL. 09/A2.1 HOLD T/ WALL DOWN 12" AND POUR SLAB THRU -11'-7"TO ℄ OF STL BEAM13'-514"TO ℄ OF STL BEAM15'-10"TO ℄ OF STL BEAM15'-734"TO ℄ OF STL BEAMBEARING WALL NOTE!!! - STUDS @ 19.2" o.c. IN LINE w/ JOIST ABOVE - DOUBLE T/ PLATE WOOD HANDRAIL - ONE SIDE 29'-512" TO STAIR NOSING 10'-112" 2'-10" 3 12" 3'-11" 312" 27'-012"24'-0" 39'-0" 26'-1" 12'-11"12'-0" 44'-6" 10"10"18'-512" 10" 20'-312" 8" 10" 11'-11" 10"44'-8"10" 15'-11" HIGH EFF. FURNACE w/ HUMIDIFIER FLOOR DRAIN 15'-11" TO FLOOR DRAIN 24'-1034"TO FLOOR DRAIN10" 2'-11" 13'-134" 13'-234"22'-0" 4'-412" 12'-11"8" 11'-712"11'-712" 24'-412"FOUNDATION / FOOTING PLAN01 SCALE: 1/4" = 1'-0" W8x18 STEEL BEAM W8x18 STEEL BEAM BEAM POCKET - 8"x4"x 8 18" DEEP SUMP PUMP W/ BATT. BACKUP EJECTOR PUMP WATER SOFT R.I. 24" x 24" x 12"d C.I.P. CONC. FOOTING - HOLD DOWN 3 12" FOR SLAB POUR THROUGH 76'-7" 40" BRICK CURB 22'-112" ℄ OF DRAIN 14'-0"℄ OF DRAIN2'-6516"℄ OF DRAIN21'-712"7'-5"33'-1112" 1'-2"10" HOLD T/ GARAGE SLAB DOWN 1" FROM T/ FDN. & SLOPE TO O.H. DOOR 8"thk. X 16"w SLAB BEARING WALL SUPPORT - DETAIL 04/A2.1 2"11'-1" TO ℄ STL. COLUMN 11'-414" TO ℄ STL. COLUMN 15'-1178" TO ℄ STL. COLUMN 2" 24" x 24" x 12"d C.I.P. CONC. FOOTING - HOLD DOWN 3 12" FOR SLAB POUR THROUGH 13'-812" (2) SILL P.T. SILL PLATES SIDE BY SIDE - SEE DETAIL 09/A6.0 24'-478" ℄ OF STL COLUMN 12" x 20" GRADE BEAM - SEE DETAIL 06/A2.1 15'-734" 18'-834" 24" x 12" x 12" THICK C.I.P. CONCRETE COLUMN FOOTING - HOLD T/ FT'G. DOWN 3 12" FROM T/ SLAB  ‘ JD 67((/ &2/ 24" x 12" x 12" THICK C.I.P. CONCRETE COLUMN FOOTING - HOLD T/ FT'G. DOWN 3 12" FROM T/ SLAB  ‘ JD 67((/ &2/ 27" x 27" x 12"d C.I.P. CONC. FOOTING - HOLD DOWN 3 12" FOR SLAB POUR THROUGH  ‘ JD 67((/ &2/  ‘ JD 67((/ &2/  ‘ JD 67((/ &2/ 24" x 12" x 12" THICK C.I.P. CONCRETE COLUMN FOOTING - HOLD T/ FT'G. DOWN 3 12" FROM T/ SLAB  ‘ JD 67((/ &2/  ‘ JD 67((/ &2/ 1'-0" 08 A2.1 6"thk. CONC. GARAGE SLAB w/ #4 RE-BAR @ 18" o.c. - LONG DIRECTION - MIN. 2" COVER w/ #4 RE-BAR @ 9" o.c. - SHORT DIRECTION - PLACED @ BTM. OF STEEL MAT - MIN. 3" COVER - SEE DTL's. 09 & 11/A2.1 08 A2.1 18'-212" 9'-10"40" BRICK CURB9'-10"2"2" 16'-612" 13'-812" 9'-5"16'-034" 2'-934" ELECTRICAL PANEL RADON PIPE - DETAIL 03/A2.1 INTAKE/EXHAUST 9'-10"8" BRICK CURB58'-2"20'-112"20'-1112" 24'-7" 8" BRICK CURB 44'-8" 22'-314" TO ℄ OF STL COL. 18'-734" TO ℄ OF STL COL. 12'-434" 21'-714" TO ℄ OF STL COL.42" x 42" x 18"d C.I.P. CONC. FOOTING - HOLD DOWN 3 12" FOR SLAB POUR THROUGH  ‘ JD 67((/ &2/   ‘ JD 67((/ &2/ 36" x 36" x 15"d C.I.P. CONC. FOOTING - HOLD DOWN 3 12" FOR SLAB POUR THROUGH 30" x 30" x 12"d C.I.P. CONC. FOOTING - HOLD DOWN 3 12" FOR SLAB POUR THROUGH  ‘ JD 67((/ &2/CONTROL JOINTCONTROL JOINTCONTROL JOINTCONTROL JO I NTW8x28 STEEL BEAMW8x28 STEEL BEAMW8x21 STEEL BEAM W8x21 STEEL BEAM 5" UP CARPET 31'-2" 36'-514"8" B.C.W8x18 STEEL BEAM 11'-11" 13'-6" 10" 10"8" 10" #4 RE-BAR @ 11" o.c. - SIDE TO SIDE #4 RE-BAR @ 18" o.c. - FRONT TO BACK - PLACED ABOVE SIDE TO SIDE BARS IN SLAB - PLACED BELOW FRONT TO BACK BARS IN SLAB 11'-3" 2x4 LET IN FOR SLAB SUPPORT - TYP 4'-9" #4 RE-BAR STUBBED & LOOPED HOLD WALLS DOWN 3 1/2" 6'-412" 8'-9" 8" 4'-0" 8" 2'-7"8" B.C.4'-9"8" 9'-6"8" BRICK CURBLINE OF PORCH ABOVE 11'-8"10" 7'-1116"ROUGH-IN WET BAR VERTICAL CONTROL JOINT - DETAIL 01/A2.1 SLOPE 3" FROM REARTO FRONT w/ 1" FALL IN THE LAST 12" @THE GARAGE DOORSLOPE 3" FROM REAR TO FRONT w/ 1" FALL IN THE LAST 12" @ THE GARAGE DOOR NOTE: RUN CONDUIT FOR COACH LIGHT ABOVE 8"6'-512" 10"8" 11'-3" 32"w. x 23"h. HOPPER WINDOW HOLD T/ WDW TO T/ FDN. WALL 8'-4" 5'-412" 9'-114" 9'-114" 6x6 P.T. POST - w/ 1x TRIM WRAP & 1x8 COLUMN BASE TRIM WRAP 3'-112" MO: 37 1/2"w. x 12"d. GARAGE SERVICE DOOR ABV 8"1'-614" 5040 EGRESS -HOLD T/ WINDOW 1'-4" BELOW T/ FDN. WALL WINDOW WELL & SAFETY COVER - w/ DRAIN VERTICAL CONTROL JOINT - DETAIL 01/A2.1 1'-0" DECK NOTE: SEE D5.0 FOR DECK DETAILS LINE OF DECK ABOVE W/ STEPS TO GRADE 4'-11" 4'-11"8'-4" 8"4'-0" UP CONC. STEPS TO GRADE (FIELD VERIFY # OF STEPS) 9'-412" (FIELD VERIFY) HANDRAIL 36"H. MTL. GUARDRAIL 22ACTIVESUMP PUMP W/ BATT. BACKUP 6'-6" 5040 EGRESS -HOLD T/ WINDOW 1'-4" BELOW T/ FDN. WALL WINDOW WELL & SAFETY COVER - w/ DRAIN 5040 EGRESS -HOLD T/ WINDOW 1'-4" BELOW T/ FDN. WALL WINDOW WELL & SAFETY COVER - w/ DRAIN 07,08A2.0FD 6068 S.G.D.REFER TO GENERAL NOTESFOR MASONRY OPENINGVERTICAL CONTROL JOINT - DETAIL 02/A2.0 24" PERIMETER SLAB INSULATION NOTE: CONNECT F.D. IN AREA WELL TO SUMP PUMP -S.P. 10'-0" MAX. FROM DRAIN NOTE: FIELD VERIFY AREA WELL DIMENSIONS - STEPS TO HAVE 8" RISE AND 12" TREAD DS7'-0" 30'-1716" ℄ OF DRAIN 17'-958"3'-034" LINE OF PATIO ABOVE 2'-0"40" BRICK CURB8'-0"32" BRICK CURB10'-0"24" BRICK CURB6'-0"16" BRICK CURB15'-1"8" BRICK CURB2'-0"40" BRICK CURB8'-0"32" BRICK CURB10'-0"24" BRICK CURB6'-0"16" BRICK CURB32'-2"8" BRICK CURBWILLIAM L.KAUF H O L Z A RCHITECTREASON FOR PLOT: PLOT DATE: Job No. Sheet No.IN NEW RESIDENCE FOR:HOMESITE NO.OFFICE REVIEW:MASTER BY: DATE: C DATE: FISCHER HOMES INDIANAPOLIS II, LP6602 EAST 75TH STREET, SUITE 400INDIANAPOLIS, IN 46250(317) 348-2500FIELD SPEC HOTLINE: (859) 344-7100COPYRIGHT ALL RIGHTS RESERVED FISCHER HOMES, Inc.JOB INFO: DATE: PROJECT COORDINATOR:PHONE No:PERMIT: SIGN-OFF: CONSTRUCTION:REVISION:REVISION:REVISION:REVISION:HOME TYPE: PLAN NO.EXTERIOR: 12/20/2018 4:43 PM TLR-024 JULIE & JASON PATEL14410 TALLYN WAYROOKWOOD G111 CA TALLYNS RIDGECARMEL, IN 46071024 ---- -------- -------- 12/14/18---- ----------------GRAND ESTATES COLLECTION fieldspecchange@fischerhomes.com REVISED BY: TEAM MANAGER:PHONE No:859-426-4223SHEZYRA D. SISKOWICA2.0 1 01/04/19 William Hohlt