Loading...
HomeMy WebLinkAboutS201.0Dropped beam in wall/over opening by others Flush beam (by others) F04 cantilevers from interior bearing; 2x6 top and bottom ribbon FE03 FE02 FG01 FE01 FE04 FE05 FE06 FG03 FE07 F02(10) F03(3) F01(3) F04(3) F05(6) F06(8) 20-07-00 51-11-00 21-05-00 11-10-00 1-04-00 7-02-00 6-03-00 7-02-00 83-11-00 12-00-00 12-06-08 20-08-08 3-08-00 3-08-00 21-05-00 16-00-00 1-04-00 1-04-00 1-04-00 1-04-00 1-04-00 1-04-00 1-04-00 33-03-00 28-00-00 10-07-00 45-04-00 19-08-00 93-11-00 21-05-00 23-07-08 20-05-00 11-11-08 IRC 2003 TPI 2002 40TLL- 10TDL - 10BDL Homes by McKenzie Grosmont 3 Hamlet 1/4"=1' December 27, 2018 PH B18803775 CUSTOMER: LOCATION: MODEL: JOB #: DATE: DESIGNER: DESIGN INFORMATION: SCALE: 9028 Old SR 67 South Mooresville, IN 46158 (317) 834-5380 Truss Placement Guide 1) This layout is intended for the purpose of truss location and placement only. Refer to the building plans for actual building construction. 2) All dimensions shown 00-00-00 are in feet-inches-sixteenths. 3) Trusses are spaced 16" on center unless otherwise noted. 4) Do not cut or modify trusses. 5) Refer to the individual truss design drawings for the location of member bracing, uplift and truss end reactions. 6) Installation of all temporary and permanent bracing is essential. See truss drawings, BCSI-B2 Summary Sheet and building designer requirements. 7) Non-bearing walls may not be shown on layout. Left end of truss, as shown on engineering drawing, is indicated by the triangle symbol 01/07/19 Mike Sheeks