HomeMy WebLinkAboutS201.0Dropped beam in
wall/over opening
by others
Flush beam (by others)
F04 cantilevers from
interior bearing; 2x6
top and bottom ribbon
FE03
FE02
FG01
FE01
FE04
FE05
FE06 FG03
FE07
F02(10)
F03(3)
F01(3) F04(3)
F05(6)
F06(8)
20-07-00 51-11-00
21-05-00 11-10-00
1-04-00
7-02-00 6-03-00 7-02-00
83-11-00 12-00-00
12-06-08 20-08-08
3-08-00
3-08-00
21-05-00 16-00-00
1-04-00
1-04-00
1-04-00
1-04-00
1-04-00
1-04-00
1-04-00
33-03-00
28-00-00 10-07-00 45-04-00
19-08-00
93-11-00
21-05-00
23-07-08
20-05-00
11-11-08
IRC 2003
TPI 2002 40TLL- 10TDL - 10BDL
Homes by McKenzie
Grosmont
3 Hamlet
1/4"=1'
December 27, 2018
PH
B18803775
CUSTOMER:
LOCATION:
MODEL:
JOB #:
DATE:
DESIGNER: DESIGN INFORMATION: SCALE:
9028 Old SR 67 South
Mooresville, IN 46158
(317) 834-5380
Truss Placement Guide
1) This layout is intended for the purpose of truss location
and placement only. Refer to the building plans for actual
building construction.
2) All dimensions shown 00-00-00 are in feet-inches-sixteenths.
3) Trusses are spaced 16" on center unless otherwise noted.
4) Do not cut or modify trusses.
5) Refer to the individual truss design drawings for the location
of member bracing, uplift and truss end reactions.
6) Installation of all temporary and permanent bracing is
essential. See truss drawings, BCSI-B2 Summary Sheet
and building designer requirements.
7) Non-bearing walls may not be shown on layout.
Left end of truss, as shown on engineering
drawing, is indicated by the triangle symbol
01/07/19
Mike Sheeks