HomeMy WebLinkAboutCJ181033.0190ARev1Report Number:
Service Date:
Report Date:
Task:
Client
Carmel, IN 46032
3030 West 116th St.
West Park: The GrovesGibraltar Construction Corp
Attn: Douglas Perry
2932 N Webster Ave
Indianapolis, IN 46219
317-273-1690
Indianapolis, IN 46214-2988
7770 W New York St
CJ181033.0190A
12/13/18
01/14/19 Revision 1 - 28-day results
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Project
Project Number: CJ181033
Specified Strength:28 days
Mix ID:
Supplier:
Batch Time:
Truck No.:
4001CC/17002
IMI
Material Information
0810
1906
Plant:
Ticket No.:10949752
Field Test Data
Test
Air Content (%):
Result Specification
6 3 - 6
5.8 4.5 - 7.5
63 50 - 90
36
4,000
Slump (in):
psi @
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Sample Information
Sample Date:
Sampled By:
Weather Conditions:
Sample Time:12/13/18 0900
Jamie Conwell
CLOUDY
19.19
0
0
Thick slab South East cornerSample Location:
Placement Method:Chute
Water Added Before (gal):
Water Added After (gal):
Accumulative Yards:Batch Size (cy):
S/APlacement Location:
Laboratory Test Data
Set Avg Diam.Area DateDate Test
Age at
Load
Maximum
Strength
Compressive
Fracture
No.ID
Specimen
Received Tested (days)Type(in)(sq in)(lbs)(psi)
Tested
By
1 A 4.00 12.57 12/17/18 12/20/18 7 45,000 2 3,580 JLT
1 B 4.00 12.57 12/17/18 01/10/19 28 62,690 1 4,990 JLT
1 C 4.00 12.57 12/17/18 01/10/19 28 63,220 3 5,030 JLT
1 D 4.00 12.57 12/17/18 01/10/19 28 58,060 4 4,620 JLT
Average (28 days) 4,880
Initial Cure:Final Cure:Outside Water Storage Tank
Comments:Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Earth Exploration, Inc.
Sample fresh concrete at the placement locations, perform required field tests and cast compressive strength samples.Services:
Reported To:
Contractor:
Report Distribution:
(1) Gibraltar Construction Corp, Douglas Perry (1) City of Carmel IN, Mike Sheeks
(1) Johnson Wilbur Adams, Inc., Michael Wilbur (1) Smith Group JJR, Jessie Fink Jeremy Clem
Project Manager
Ron Hueston with Gibraltar Construction
Reviewed By:
ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231Test Methods:
Earth Exploration, Inc. Rep.: Jamie Conwell
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Page 1 of 1CR0001, 11-16-12, Rev.6