MEMO 7:k
RIE: SWIMMING POOL S
Two inspections will need to be performed by the Carmel
Department of Community Development prior to the use of
the pool.
Indicate on the pool permit who will call in inspections.
(Minimum 24-hour notice is required)
First inspection (rough -in) needs to be called in after the
hole is excavated, plumbing and electrical installed, but
before any concrete is poured or pool bottom or sides are
installed. Corners of the pool deck must be marked,
preferably staked. After plumbing and electrical is
installed (before it is covered up), have corners of pool
staked for inspection.
Second inspection (Final) needs to be called in to the Carmel
Department of Community Development once project is complete,
fence installed, all grading and seeding done. If the
homeowner is responsible for this, it must be noted on the
permit application.
Per approved ordinance, fines are to be assessed if request
for inspections are not called in and completed by our
inspectors at the proper time.
Wesley G. Bucher
Director
Dept. Community Development