HomeMy WebLinkAboutBuilding Permit Required InfoCARMEL/CLAY DFPARTMENT OF COMMUNITY DEVELOPMENT
BUILDING PERMIT
REQUIRED PLOT PLAN INFmORMATION
The below listed information must be included on all site or plot plans which are I.o be
submitted to the Cannel/Clay Department of Corminity Development as a part of the
Building, Pennit review process.
If limited, pertinent information is ch:?sired 1'1'cxn UIC Ikp:rrtrnent. of Ccarmunity Devc,lolxnent,
a five (5) day waiting period MAY be required .in order to search files ror the
desired information.
The below REQUIRED information can be secured from the landowner or land developer:
Lot drawn to scale
All dimensions
Scale and North arrow
All roads, alleys, etc., right-of-way
All other utility and drainage right-of-way and easements
Any applicable flood plain area
Building pad elevation and lot corner elevations
All accessory buildings -- existing or proposed
All sidewalks and driveways
Sewer and water lines, septic system and well location
Drainage flow arrows
All drainage swales and facilities (retention/detention areas etc.)
Dimensional cross sections of all drainage swales
All subsurface drainage facilities
I certify that all of the above listed information is shown completely and accurately
on the attadhed plot or site plan as submitted with a building permit application
to the Caamel/Clay Department of Comm mitt' Development
SIC�TATURE:
ADDRESS: %3S o e gni t Rs�E L
PROD: 9'V6 -�S