Loading...
HomeMy WebLinkAboutFindings of Fact/Ballot Sheets Findings of Fact CARMEL ADVISORY PLAN COMMISSION FINDINGS OF FACT SHEET -Plan Commission Combo Requested Variances: The applicant is seeking the following variances: 1. Docket No.18100016 V: UDO Section 2.40 — Front Yard Setback requirement from 50' to 24' along US Highway 31. 2. Docket No.18100017 V: UDO Section 5.39(E)(6)—To allow a sign above the cornice. 3. Docket No.18100018 V: UDO Section 5.07(C)(2) — Reduction in the Meridian Corridor Architectural Standards Ground Floor Facade 60% clear glazing requirement to permit the glazing as shown on the building elevations. 4. Docket No. 18100019 V: UDO Section 5.07(D)(3) — Meridian Corridor Architectural Standards Massing requirements shall apply as shown on the site plan. 5. Docket No.18110003 V: UDO Section 5.07(E)(1) — Meridian Corridor Architectural Standards Stepback requirement shall not apply. 6. Docket No. 18110004 V: UDO Section 5.39(I)(2)(b) — Wall Signage requirements for a Multi-Tenant Multi-Level Office Building shall apply to the proposed building. FINDINGS OF FACT 1. The approval of the requested variances will not be injurious to the public health, safety, morals and general welfare of the community because: The approval of the requested variances will not be injurious to the public health, safety, morals and general welfare of the community because the requested variances would allow the construction of a duel branded hotel on real estate bounded on the south and west by a major interstate interchange and commercial and medical uses to the east and south. The proposed duel branded hotel will be architecturally attractive,and its use will be harmonious and consistent with the uses in the adjacent areas. 2. The use and value of the area adjacent to the property included in the variance will not be affected in a substantially adverse manner because: The use and value of the area adjacent to the real estate that is the subject of the requested variance will not be affected in a substantially adverse manner because the proposed hotel use would be complimentary and consistent with the uses in the area around the site. 3. The strict application of the terms of the Zoning Ordinance to the property will result in practical difficulties in the use of the property because: Due to limitations associated with the real estate, the site cannot be meaningfully developed without the requested variances. DECISION IT IS THEREFORE the decision of the Plan Commission that the Development Standards Variance Docket Numbers as noted above are granted, subject to any conditions stated in the minutes of this meeting, which are incorporated herein by reference and made a part hereof. A d t "s t od of January,2019. President, armel Plan ommission "NI* SECRET Y,CaOrmel Plan Commission FINDINGS OF FACT FORM DEVELOPMENT PLAN CONSIDERATION Carmel Plan Commission, Carmel, Indiana DOCKET NO. 18100015 DP/ADLS DP NAME OF PROJECT:Aloft & Element Hotels PETITIONER: Ascent Hospitality management Company, LLC Based upon all the evidence presented by the Petitioner and upon the Department Report of the Department of Community Services, dated,we determine that the Development Plan complies with the Standards set forth in the Carmel Unified Development Ordinance. We hereby approve the Development Plan as submitted with the following specific conditions as agreed to by the petitioner. Condition 1. Condition 2. We hereby disapprove of the Development Plan as submitted for the following reasons: 1. 2. 3. DATED THIS 1 S DAY OF ....,G..n ry , 20 l Commission Member Page 9 Filename. DP-DP Amend Application 2018 Rev 1/24/2018 CARMEL/CLAY PLAN COMMISSION COMBO COMMITTEE BALLOT SHEET for FINDINGS OF FACT—VARIANCES 1. Docket No.18100016 V: UDO Section 2.40— Front Yard Setback requirement from 50' to 24' along US Highway 31. 2. Docket No.18100017 V: UDO Section 5.39(E)(6)—To allow a sign above the cornice. 3. Docket No.18100018 V: UDO Section 5.07(C)(2)—Reduction in the Meridian Corridor Architectural Standards Ground Floor Facade 60% clear glazing requirement to permit the glazing as shown on the building elevations. 4. Docket No. 18100019 V: UDO Section 5.07(D)(3) — Meridian Corridor Architectural Standards Massing requirements shall apply as shown on the site plan. 5. Docket No.18110003 V: UDO Section 5.07(E)(1) — Meridian Corridor Architectural Standards Stepback requirement shall not apply. 6. Docket No. 18110004 V: UDO Section 5.39(I)(2)(b)—Wall Signage requirements for a Multi-Tenant Multi-Level Office Building shall apply to the proposed building. Petitioner: Ascent Hospitality Management Company,LLC 1. 2. 3. DATED THIS 15th DAY OF JANUARY,2019. Board Member