Loading...
HomeMy WebLinkAboutNOI Watermain_01-16-19NOTICE OF INTENT TO CONSTRUCT A WATER MAIN EXTENSION State Form 49008 (R314-15) Approved by State Board of Accounts, 2015 General Construction Perinnit For Water Main Extensions 1. Title of proposed project 2. County of Proposed project The Hamlet at Jackson's Grant, Section 2 Hamilton i 3. Location of proposed project Gncluoing nearest public intersec8on and nearest quarter Section. Township, Range) West side of Spring Mill Road approximately 1,000' North 116th Street. Part of the East Half of Section 34, Township 18 North, Range 3 East. 4. Name, title, email address and firm of responsible person (as definedin 3271AC 8-3.5-6) S. Telephone number of responsible person John McKenzie, Owner/President, john@mckenziecollection.com, Homes by John McKenzie ( 317 ) 574-7616 B. Address of responsible person (number and street, city, state, and ZIP code) 4631 Lisbom Drive, Carmel, Indiana 46033 7. Name of Public Water System (PdVS) 8. PWS identification number Carmel City Utilities 5229004 9. Address of PWS (number and street, city, state, and cede) 10, Telephone number of P✓JS 30 West Main Street, Suite 220, Carmel, Indiana 46032 ( 317 ) 571-2451 11. Name and firm of professional engineer 12. Telephone number of professional engineer 317 849-5935 David J. Stoeppelwerth - Stoeppelwerth & Associates, Inc. ( ) 13.Address (numberand street, dty state, and ZIP code) and email address of professional engineer 7965 East 106th Street, Fishers, Indiana 46038 - dstoeppelwerth@stoeppelwerth.com 14. Name an e-mail address of developer a icable)15. Telephone numberofdeveloper 574-7616 John McKenzie,john@mckenziecoilection.com (317) 16. Address of developer (numberandsmet, city, state, into ZIP wdel 4631 Lisbon Drive, Carmel, Indiana 46033 17. Timing of construction (check one of the following): * The proposed construction of the water main will begin on Apt 2019 and be completed on A"20N_. (Cannot begin construction less than thirty (30) days after IDEM receives a complete and suffident N01.) N from L((CannI at least commencement o� na radion before edays an not begin constructionfees,less thng e ofthis NOIte and well Includencopy of the nformafron on he first pagit than (30)s after IDEM comdem and sufident NOI. 18. Fee Schedule: The complete NOI farm may be submitted by emaA(derwi@idem.ngw) a by catifed m01110 e addre�bdow. ❑ No fee, exempted under n7IAC 8-3-7(3). X No fee for water main extensions under 2,5(0 linear fact. rolare Dep3dment of Environmental Management D$150 for water mein exromuns from 2,501 to 5.000 linear feet Drinking Water Permits Section JGCN for1201) 100 With Senate Avenue D $250 for water main extercions from Son to 10,000 linear feet. Indianapolis, IN 46204 D$500 for water main extensions greater than 10.000 linear feet It a tea is required, see instructions lorpayrrlelt Options. 19. Certifications: Responsible Person: "I cedlfy that I have reviewed and understand the applicability and eligibility requirements of this rule and that the water main proposed with the submission of this NOI meets the applicability and eligibility requirements of this rule. I also certify that the design and construction of the project will be performed under my direction or supervision to assure conformance with 327 IAC 6-3.5 and Will meet all local rules or laws, regulations and ordinances. The infommion submitted is to the beat of my knowledge and belief, met, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and IImprisonment. Signature of responsible rmnDate agn (mont , ay, yea Will January 16, 2019 Professional Engineer: "I cedily under the penalty of law that the design of this project will be performed under my direction orsupervibimn to assure conformance with 3271AC 8- the of said to be performed in conformance with this rule. The design of the 3.5 and that the plans and specifwation will require construction project proposed project will meet all local rules or law, regulations and ordinances. The information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false Information, including the possibility of fine and imprisonment." hire of fie sion neer Date signed (month, day, year) January 16, 2019 Page 1 of 2 Developer. "I certify under the penalty of law that the construction of this project Mil be performed under my direction or supervision to assure conformancewith 327 IAC 83.5. The construction of proposed project will meet all local rules or laws, regulations and ordinances. The information submitted is, to the beat of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment:" Signature of Developer a signetl (mo y year) January 18, 2019 PWS Representative: "I cedify under the penalty of law that I have agreed to furnish water to the area in whk♦r the velar main is proposed. I acknowledge the public water system's responsibility for examining the pans and specifications to determine that the proposed water main meet local rules at laws and ordinances. I also acknovAedge the public water system's respormbillties as outlined in 3271AC 88.512. 1 am aware that there are significant penalties for submitting false information, including the possib118y of fine and imprisonment" Signature of PWS representative Date signed (monf g year) Project Design Criteria: Alternative Technical Standards (327 IAC 88.2-20) 2D. Are any "Alternative Technical Standards' proposed to be used in this project? ❑ Yes, I have attached copies of the approval with the NOI. ❑ No Pudic Water System Capacity Status 21. The PWS's Daily Production Firm Capacity: A. MGD B. 23,611 GPM 22, The PWS's five (5) highest demand days in the previous two (2) years only: Demand (MGD) Date (month, day, year) 1. 21,996,000 8/20/17 2. 21,558,000 7/20/18 3. 20,851,000 7/18/18 4. 20,640,000 6/9/18 5. 20,208,000 8127/17 23. Average of five (5) Peak Daily Demand (PDD) listed above: C. MGD 24. Ratio of PDD to PWS Daily Production Capacity = (Item D = Item C I Item A x 100) D. % 25. Anticipated Customer Demand of Proposed Water Main Residential Customers: E. Number of homes 22 F.Avemge Daily Demand times Peaking Factor (at least 0.87 gpmmome) 0.87 G. Total Average Dally Demand times Peaking Factor (G = E x F) 19.14 gpm other (Commereral and Indusbuth Customers: Description(inducting size of domestic meterlj: Average Daily Derrell (ore "Sas Mabnum Ope'a6rg C8p8W f dorresfic meter) V meters @ 50 gpm 50 gpm gpm Sub Total: H. 50 gpm TotalCustomer Demand of Proposed Water Main(gpm)=(Rem G+item H) 1. 19.14 gpm Ratio of total Customer Demand of Proposed Water Main (gpm) to the PWS Daily Production Firm Capacky (gpm) (Item J = Rem V gem B x 100) J 0.2928 `A 26. Cross Connection Hazard Prevention A. Are any of the new customers included in Section 25 designated as cross com action hazards (sae inshucriars)? ❑ Yes ® No ❑ WA B. Will an air gap be constructed or a reduced pressure principal backflow Preventer be installed on the customers service line? 0 Yes ® No ❑ NIA Page 2 of 2