HomeMy WebLinkAboutStormwater Management Permit_01-16-19City of Carmel
/ STORMWATER MANAGEMENT PERMIT APPLICATION
I\pei�rf/
Permit #:
Submission of this application constitutes notice that the project site owner is applying for coverage under the Camel City Code §6-180
through §6-209 for stormwater discharges associated with construction activity disturbing % acre or more of land. Permitted project site
owners are required to comply with all terms and conditions of the Carmel City Code.
Project Name: The Hamlet at Jackson's Grant, Section 2
Project Location: West side of Spring Mill Road approximately 1,000' North of 116th Street.
Quarter: East 1/2 Section: 34 Township: 18N Range: 3E
Project Site Owner Name: Tide/Position:
John McKenzie Owner /President
company: Homes by John McKenzie
Address: 4631 Usborn Drive
City: Carmel State: Indiana zip: 46033
Phone: (317) 574-7616 Fain (317) 674-8806 E -mad Address: john@mckenziecollection.com
SWPPP Contact person: John McKenzie Company Name: Homes by John McKenzie
Affiliation to Project Site Owner: Same
Address (If different from above):
City: State: Zip:
Phone: Fax E-mail Address:
Estimated Project Duration: April 2019 through April 2024
By signing this application, I certify the following:
A. The storm water quality measures included in the Storm Water Pollution Prevention Plan (SWPPP) comply with the requirements of
§6-180 through §6-209 of the Carmel City Code, the City of Carmel Stormwater Technical Standards Manual, and all applicable
federal, state, and local stormwater requirements;
B. The measures required by the Stormwater Pollution Prevention Plan (SWPPP) shall be implemented;
C. Stormwater quality measures beyond those specified in the Stormwater Pollution Prevention Plan (SWPPP) will be implemented
during the life of the permit if necessary to comply with the Carmel City Code; and
D. Implementation of stormwater quality measures will be inspected by trained individuals;
E. Pursuant m Carmel City Code § 6-205, the City reserves the right to inspect and/or implement the stormwater quality measures
outlined in the Stormstater Pollution Prevention Plan (SWPPP) or provide maintenance thereto, at my expense, if not performed.
John McKenzie January 16, 2019
Signature of Project Owner Printed Name Date
Pernmt Approved: Engineering Depanmew
Date
Approval of (his appficadon wnsfituW acceptance of the Storm Water Pollution Prevention Plan (SWPPP) by the City of Carmel.