HomeMy WebLinkAboutBuilding Permit InfoBUILDING PERMIT INFOFiMAT SON
C a rma 1- C 1 ay Towns U i p
Dapa r tenant o F Community Davg 1 oprnant
CARMEL ZONING ORDINANCE Z-160, SECTION 29.4.2(3): THE BUILDING COMMIS-
SIONER (DIRECTOR, DEPT. OF COMMUNITY DEVELOPMENT OR STAFF) SHALL APPROVE
OR DENY THE IMPROVEMENT LOCATION PERMIT (BUILDING PERMIT) WITHIN FIVE
�) WORKING DAYS OF THE RECEIPT OF THE WRITTEN APPLICATION FORM AND
ACCOMPANYING MATERIALS. THE IMPROVEMENT LOCATION PERMIT (BUILDING
PERMIT) SHALL BE ISSUED WHEN THE PROPOSED STRUCTURE, IMPROVEMENT OR USE
AND ITS LOCATION CONFORM IN ALL RESPECTS TO THIS ORDINANCE.
The following must be received by the Department of Community Develop
ment before any building or remodeling permit can be reviewed or issued
by staff:
1. A completed Improvement Location Permit (Building Permit)
application.
2. Two (2) complete sets of construction plans. In compliance
with the State Energy Code, must list R -values on walls,
ceilings, etc. If a commercial construction, plans must be
stamped approved by the Indiana State Department of Fire
Prevention b Building safety Indicate total height of build-
ing on plans.
3. A copy of sewer permit (from City of Carmel Engineering
Dept. or Hamilton Western Utilities, whichever applies), or
septic permit (Hamilton County Health Department).
4. One (1) copy of plot plan from subdivision development plan
5. Three (3) copies of a site plan or plot plan showing the
following REQUIRED information (can be obtained from the
landowner or developer):
--Lot drawn to scale -- all dimensions
--Scale and north arrow
--All roads, alleys, rights-of-way, etc.
--All other utilities and drainage rights-of-way and easements
--Any applicable flood plain area
--Building pad elevation and lot corner elevations
--All accessory buildings -- existing or proposed
--All sidewalks and driveways
--Sewer and water lines, septic system and well location
--Drainage flow arrows
--All drainage swales and subsurface facilities (retention/
detention areas, etc.)
--Dimensional cross sections of all drainage swales
--S—P PUMP (sump Pump pits) showing discharge locations
f` --Geothermal heat pump discharge locations
a ,
Drainage Swales: All required drainage swales must be shown on
the plot plan and constructed in all subdivisions prior to the
' .4 ( Department of Community Development performing a final inspec-
�'
tion of any structure per plans on file or
per the following:
ff.
a Constructed swales shall be a minimum of 116" deep with side
i• L? slopes of not less than 4 to 1.
' If this information is not submitted, it will extend the time it takes
}` rt to get an approved building permit.
� c3 I CERTIFY THAT ALL OF THE ABOVE LISTED INFORMATION IS SHOWN COMPLETELY
•i, AND ACCURATELY ON THE ATTACHED PLOT OR SITE PLAN AS SUBMITTED WITH A
'_"< BUILDING PERMIT PPLICATION TO THE CARMEL-CLAY DEPARTMENT OF COMMUNITY
DEVELOPMENT.
a SIGNATURE. - PHONE: V S 2 (O 0 9�
ADDRESS: �� Z
c. h. NAME OF PLUMBING CONSTRACTOR (If applicable):-a-�'�7�.
VALID STATE PLUMBING LICENSE NUMBER: T O
L