HomeMy WebLinkAboutT-200 Sealed Truss DrawingsDE
DANSCO ENGINEERING, LLC
P.O. Box 3400
Apollo Beach, FL 33572
Telephone (813) 645-0166
Facsimile (813) 645-9698
The truss drawing(s) listed below have been prepared by Stark Truss, Inc. under my
direct supervision based on the parameters provided by the truss designers.
Job: 1803049-12T
46 truss design(s)
62663-W1
11/21/18
Samuel A. Greenberg, P.E.
Indiana Reg. #19700485
Note: Gable end frames with stud lengths exceeding 4’ require permanent bracing. On structural
gables, where studs may be made from two or more boards as they cross diagonals, the 4’ length
is the distance from the top chord to bottom chord.
The seal on these drawings indicate acceptance of professional engineering
responsibility solely for the truss components shown. The suitability and use of this
component for any particular building is the responsibility of the building designer, per
ANSI/TPI 1-2007 Chapter 2.
Warning !—Verify design parameters and read notes before use.
These designs are based only upon parameters shown, and are for individual building components to be installed and loaded vertically. Applicability of
design parameters and proper incorporation of component is responsibility of building designer – not truss designer or truss engineer. Bracing shown
is for lateral support of individual web members only. Additional temporary bracing to ensure stability during construction is the responsibility of the
erector. Additional permanent bracing of the overall structure is the responsibility of the building designer. For general guidance regarding fabrication,
quality control, storage, delivery, erection and bracing, consult ANSI/TPI 1 National Design Standard for Metal Plate Connected Wood Truss
Construction and BCSI 1-03 Guide to Good Practice for Handling, Installing & Bracing of Metal Plate Connected Wood Trusses from Truss Plate
Institute, 583 D’Onofrio Drive, Madison, WI 53719
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
AT01
TrussType
PiggybackBase
Qty
4
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:062018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-BhhYZnKU5XrhiUaRssjANrvVn?oazyhJc0grL1yH0Qh
Scale=1:71.6
T1
T2
T1
B1
W3
B2
W5
W3
W1
W2
W1
W6 W6 W6 W2
W7 W4
W7
W4
W8 W8
W9
B3
F1 F1
1
2
3
4
5 6
7
8
9
10
23 22 2018
17 15 12 11
21 19 16 14 13
26
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
AT01
TrussType
PiggybackBase
Qty
4
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:062018 Page2
ID:490hraxo9ofAxAldCy0fEhyHstt-BhhYZnKU5XrhiUaRssjANrvVn?oazyhJc0grL1yH0Qh
NOTES-
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 28 lb uplift at joint 23 and 28 lb uplift at joint 11.
11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
12)Atticroomchecked for L/360 deflection.
LOADCASE(S) Standard
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
AT01GE
TrussType
GABLE
Qty
1
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:082018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-74pI_TLkd86PxokpzHleSG_rHoT2RsBc3K9xQvyH0Qf
Scale=1:68.3
T1
T2
T1
B1
W9
B2
W11
W9
W7
W8
W7
W12 W12 W12 W8
W13
W10
W13
W10
W14 W14
W15
B3
F1 F1
ST4
ST3
ST2
ST1
ST4
ST3
ST2
ST1
W1 W1
W3
W2
W2
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
AT01GE
TrussType
GABLE
Qty
1
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:082018 Page2
ID:490hraxo9ofAxAldCy0fEhyHstt-74pI_TLkd86PxokpzHleSG_rHoT2RsBc3K9xQvyH0Qf
NOTES-
10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
11) Ceiling dead load(5.0 psf) on member(s). 3-4, 7-8, 4-27, 24-27, 24-25, 7-25
12)Bottomchordliveload(40.0 psf) and additional bottomchord dead load(0.0 psf) applied only to room. 19-21, 16-19, 14-16, 13-14
13)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 28 lb uplift at joint 23 and 28 lb uplift at joint 11.
14)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
15)Atticroomchecked for L/360 deflection.
LOADCASE(S) Standard
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
AT02
TrussType
PiggybackBase
Qty
8
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:092018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-bGNhBpMMOSEGZxJ0X_Gt?TX09CphAJYmI_vVyLyH0Qe
Scale=1:71.6
T1
T2
T3
B1
W3
B2
W5
W3
W1
W2
W11
W6 W6 W6 W10
W4
W7
W7 W4
W8 W8
W9
B3
F1 F1
1
2
3
4
5 6
7
8
9
22 21 1917
16 12 11 10
20 18 15 14 13
23 24
29
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
AT02
TrussType
PiggybackBase
Qty
8
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:102018 Page2
ID:490hraxo9ofAxAldCy0fEhyHstt-3Tw3P9N?9mM7B5uC5in6Yh4Bvc9wvmovXee2UoyH0Qd
NOTES-
11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 29 lb uplift at joint 22.
12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
13)Atticroomchecked for L/360 deflection.
LOADCASE(S) Standard
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
J01
TrussType
Jack-Closed SupportedGable
Qty
2
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:102018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-3Tw3P9N?9mM7B5uC5in6Yh4IbcJHvqHvXee2UoyH0Qd
Scale=1:19.2
W1
T1
W2
B1
ST2
1 ST1
2
3
4
5
9 8 7 6
10
11
12
3x4
3x4
1.5x4
1.5x4 1.5x4
1.5x4
1.5x4
1.5x4
-0-10-8
0-10-8
4-7-14
4-7-14
0-11-2
3-3-1
6.0012
LOADING (psf)
TCLL
TCDL
BCLL
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
J02
TrussType
Jack-Closed
Qty
5
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:112018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-YfURcVOdv3U_oFTOfPIL4ucPx0bgeIb3lIOc1EyH0Qc
Scale=1:27.1
W1
T1 W2
B1
1
2
3
5
4
6
7
3x4
3x4
3x5
3x10MT18H
6-7-14
6-7-14
-0-10-8
0-10-8
6-7-14
6-7-14
0-11-2
4-3-1
3-11-9
0-3-8
4-3-1
6.0012
PlateOffsets(X,Y)-- [4:0-3-8,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
J03
TrussType
Jack-Closed
Qty
6
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:122018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-0r2pqrOFgNcrQP2bC6qad69gwQ0VNlrC_y79ZgyH0Qb
Scale=1:15.5
W1
T1 W2
B1
1
2
3
5
4
3x8
1.5x4
1.5x4
1-8-0
1-8-0
-0-6-8
0-6-8
1-8-0
1-8-0
0-9-10
2-5-10
2-2-2
0-3-8
2-5-10
12.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
PB01
TrussType
Piggyback
Qty
13
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:132018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-U2cB1BPtRhki2ZdnmqLp9JisQpLI6C5LDbti57yH0Qa
Scale=1:11.8
T1 T1
1 B1
2
3
5 4
3x4
2x4 2x4
3-10-4
3-10-4
1-11-2
1-11-2
3-10-4
1-11-2
0-5-3
1-11-2
0-1-10
0-5-3
0-1-10
12.0012
PlateOffsets(X,Y)-- [2:0-2-6,0-1-0], [3:0-2-0,Edge], [4:0-2-6,0-1-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
T01
TrussType
CommonGirder
Qty
1
Ply
2
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:152018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-QQkySsR7zI_PHsmAuFNHFkn8rdzpazsegvMpA?yH0QY
Scale=1:46.9
T1
T2
B1
W5
W4 W3
W3 W4
W1
W2
W1
1 W2
2
3
4
5
6
11 10 9 8 7
12 13
14 15 16 17 18 19
4x6
4x8
4x6 8x8 4x6
3x6
6x6
3x6
6x6
4x8
3-4-8
3-4-8
6-5-8
3-1-0
9-6-8
3-1-0
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
T01
TrussType
CommonGirder
Qty
1
Ply
2
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:152018 Page2
ID:490hraxo9ofAxAldCy0fEhyHstt-QQkySsR7zI_PHsmAuFNHFkn8rdzpazsegvMpA?yH0QY
NOTES-
11) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 1643 lb down and 257 lb up at 1-10-4, 1643 lb down and 257 lb up at
3-10-4, 1643 lb down and 257 lb up at 5-10-4, 1643 lb down and 257 lb up at 7-10-4, and 1643 lb down and 257 lb up at 9-10-4, and 1645 lb down and 255 lb up at
11-10-4 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others.
LOADCASE(S) Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-2=-51, 2-4=-51, 4-6=-51, 7-11=-20
Concentrated Loads(lb)
Vert: 14=-1452(B) 15=-1452(B) 16=-1452(B) 17=-1452(B) 18=-1452(B) 19=-1454(B)
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
T01GE
TrussType
Common SupportedGable
Qty
2
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:162018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-udIKfCRlkc6Gv0LMRyuWnyKLf1MlJUOovZ5NiRyH0QX
Scale=1:49.6
W1
T1 T1
W1
B1
ST4
ST3
ST1 ST2
ST3
ST2 ST1
1
2
3
4
5
6
7
8
9
10
11
18 17 16 15 14 13 12
19 20
3x5
4x4
3x5
12-11-0
12-11-0
-1-2-8
1-2-8
6-5-8
6-5-8
12-11-0
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
T02
TrussType
CommonGirder
Qty
1
Ply
2
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:182018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-q?P44uT0GDM_8KVkZNw_sNPe3q?QnKa5MtaTnKyH0QV
Scale=1:46.9
T1
T2
B1
W5
W4 W3
W3 W4
W1
W2
W1
W2
1
2
3
4
5
6
11 10 9 8 7
12
13
14 15 16 17 18 19
4x8
4x6
5x6 8x8 5x6
3x6
6x6
3x6
6x6
4x8
3-4-8
3-4-8
6-5-8
3-1-0
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
T02
TrussType
CommonGirder
Qty
1
Ply
2
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:182018 Page2
ID:490hraxo9ofAxAldCy0fEhyHstt-q?P44uT0GDM_8KVkZNw_sNPe3q?QnKa5MtaTnKyH0QV
NOTES-
11) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 1655 lb down and 254 lb up at 0-11-4, 1652 lb down and 257 lb up at
2-11-4, 1652 lb down and 257 lb up at 4-11-4, 1652 lb down and 257 lb up at 6-11-4, and 1652 lb down and 257 lb up at 8-11-4, and 1643 lb down and 257 lb up at
10-11-4 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others.
LOADCASE(S) Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-3=-51, 3-5=-51, 5-6=-51, 7-11=-20
Concentrated Loads(lb)
Vert: 14=-1463(B) 15=-1460(B) 16=-1460(B) 17=-1460(B) 18=-1460(B) 19=-1452(B)
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
T03
TrussType
Common
Qty
1
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:192018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-JBzTIEUe1XUrmU4x74SDPayhcEDuWnpEbXK1JmyH0QU
Scale=1:77.7
T2 T2
B1
W5 W4
W3
W2 W1
W4
W3
W1 W2
T1 T3
B2 B1
1
2
3
4
5
6
7
8
9
10
17 16 15
14 13
12 11
24
25
26 27
28
29
3x6
5x6
3x6
3x8
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
T03GE
TrussType
Common SupportedGable
Qty
1
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:212018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-Fa5DjwVuZ8kZ?nEJEVUhU?1CS235_p5X3rp7NfyH0QS
Scale=1:73.1
T2 T2
B1
ST10
ST9
ST8
ST7
ST6
ST5
ST4
ST3
ST1 ST2
ST9
ST8
ST7
ST6
ST5
ST4
ST3
ST2 ST1
B2 B1
1
2
3
4
5 6
7
8
9
10
11
12
13
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
T04
TrussType
ROOF SPECIAL
Qty
5
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:222018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-jmfbwGWWKSsQdxpWoD?w1DZI6SDXj5dgHVYhw5yH0QR
Scale=1:80.9
T2 T2
B1
B3
B4
B5
W1
W2
W3
W4 W5
W7
W6
W8 W9
W10
W11
W12 W13
T1 T3
B2
1
2
3
4
5
6
7
8
9
10
11
12
21 20
19 18 17
16
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
T04
TrussType
ROOF SPECIAL
Qty
5
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:222018 Page2
ID:490hraxo9ofAxAldCy0fEhyHstt-jmfbwGWWKSsQdxpWoD?w1DZI6SDXj5dgHVYhw5yH0QR
NOTES-
11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
T05
TrussType
Roof Special
Qty
2
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:242018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-f9nMLxYns378sFyuve1O6efebFv?B?6zlp1o__yH0QP
Scale=1:83.0
T2 T2
B1
B3
B4
B5
W1
W2
W3
W4 W5
W7
W6
W8 W9
W10
W11
W12 W13
T1 T3
12 B2
3
4
5
6
7
8
9
10
11
13 12
22 21
20 19 18
17
16 15 14
30
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
T05
TrussType
Roof Special
Qty
2
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:242018 Page2
ID:490hraxo9ofAxAldCy0fEhyHstt-f9nMLxYns378sFyuve1O6efebFv?B?6zlp1o__yH0QP
NOTES-
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
T06
TrussType
Common
Qty
1
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:252018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-7LKkYHYPcNF?UPX5TLYdfrBj6fGIwVK6zTnLWQyH0QO
Scale=1:78.4
T2 T2
B1
W5 W4
W3
W2 W1
W4
W3
W1 W2
T1 T1
12 B2 B1
3
4
5
6
7
8
9
11 10
18 17 16
15 14
13 12
25
26
27 28
29
30
3x6
5x6
3x6
3x8
3x6 3x8
3x4
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
T07
TrussType
Common
Qty
1
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:262018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-bYu6mdZ1NgNr6Z6H134sB3kur3cXfyYGC7Wu3syH0QN
Scale=1:77.7
T2 T2
B1
W5 W4
W3
W2 W1
W4
W3
W1 W2
T1 T3
12 B2 B1
3
4
5
6
7
8
9
10
17 16 15
14 13
12 11
24
25
26 27
28
29
3x6
5x6
3x6
3x8
3x6 3x8
3x4
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
T08
TrussType
Common
Qty
6
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:272018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-4kSUzzaf8_VijihTbmb5kGH3vTxvOOoPRnGSbJyH0QM
Scale=1:77.1
T2 T2
B1
W5 W4
W3
W2 W1
W4
W3
W1 W2
T1 T1
B2 B1
1
2
3
4
5
6
7
8
9
16 15 14
13 12
11 10
23
24
25 26
27
28
3x6
5x6
3x6
3x8
3x6 3x8
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
T08GE
TrussType
Common StructuralGable
Qty
1
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:282018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-Yw0sBJbHvHdZLsGf8T6KGUpFnsJD7mGZgR??7lyH0QL
Scale=1:77.1
T2 T2
B1
W5 W4
W3
W2 W1
W3 W4
W1 W2
ST10
ST11
ST8
ST9
ST6
ST7
ST4
ST3 ST5
ST2
ST1
ST10
ST8
ST6
T1 T1
HW1 B2 B1 HW1
1
2
3
4
5
6
7
8
9
22 21 20 19 18 17 15 14
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
T08GE
TrussType
Common StructuralGable
Qty
1
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:292018 Page2
ID:490hraxo9ofAxAldCy0fEhyHstt-07aFOfbvgblQz0rsiBdZphMQXGfSsDWiu5lZfByH0QK
NOTES-
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
T09
TrussType
Common
Qty
4
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:302018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-UJ8db?cYRvtHaAQ2Gu8oMvveVg3jbtPs7lU6CeyH0QJ
Scale=1:29.0
T1 T1
B1
W1
1
2
3
4
5
6
13
14
15 16
17
18
1.5x4 3x6
4x6
3x6
0-2-0
0-2-0
7-7-8
7-5-8
15-3-0
7-7-8
-0-10-8
0-10-8
7-7-8
7-7-8
15-3-0
7-7-8
16-1-8
0-10-8
0-4-4
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
T09GE
TrussType
Common SupportedGable
Qty
1
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:312018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-yVi?pLdACC?8CK?Eqcf1u6RwV4USKLk?MPEfk4yH0QI
Scale=1:27.4
T1 T1
B1
ST3
ST2
ST1
ST2
ST1
1
2
3
4
5
6
7
8
9
14 13 12 11 10
15
16 17
18
4x4
3x4 3x4
15-3-0
15-3-0
-0-10-8
0-10-8
7-7-8
7-7-8
15-3-0
7-7-8
16-1-8
0-10-8
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
T10
TrussType
COMMON
Qty
1
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:322018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-QiGN0geozW7?qUaRNJBGRK_yxUgI3my8a3zDGWyH0QH
Scale=1:50.2
T2 T2
B1
W2
W1
W2
W1
T1 T3
1 B2
2
3
4
5
6
7
8
11 10 9
18
19
20 21
22
23
3x4
4x6
3x4
3x4 3x4
1.5x4
3x4
1.5x4
3x8 3x8
0-2-0
0-2-0
9-7-2
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
T10GE
TrussType
COMMON STRUCTURALGA
Qty
1
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:332018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-uuplE0fQkqFsRd8dx1iVzXX8At38o5LIpjjmoyyH0QG
Scale=1:54.9
T2
T3
B1
W3
W2 W1
W1 W2
ST1 ST2
ST2
ST3
ST1
ST4 ST5
ST6
ST7
T1
1 B2
2
3
4
5
6
7
17 16
1413 12 11 10 9 8
35
36 37
38
39
40
15
3x4
4x4
3x6
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
T11
TrussType
COMMON
Qty
7
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:342018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-M4N8RMf2V7Nj3njpVkDkWl3IrHLnXgSR2NTJLPyH0QF
Scale=1:50.1
T1
T2
B1
W2
W1
W2
W1
T3
B2
1
2
3
4
5
6
9 8 7
16
17
18 19
20
21
3x6
3x4
3x4
4x6
3x4
1.5x4
3x4
1.5x4
3x6
0-2-0
0-2-0
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
T12
TrussType
Common
Qty
2
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:352018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-rGxWfiggGRVahxI03Skz2ycVfhm9G8ibH1CttryH0QE
Scale=1:28.4
T1 T1
B1
W1
1
2
3
4
5
6
13
14
15 16
17
18
3x6
3x6
1.5x4
4x4
7-5-8
7-5-8
14-11-0
7-5-8
-0-10-8
0-10-8
7-5-8
7-5-8
14-11-0
7-5-8
15-9-8
0-10-8
0-4-4
4-1-0
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
T12GE
TrussType
Common SupportedGable
Qty
1
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:362018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-JTVus2hI1ldRI5tCc9FCb99mR5Bl?c?kVgyQPHyH0QD
Scale=1:26.9
T1 T1
B1
ST3
ST2
ST1
ST2
ST1
1
2
3
4
5
6
7
8
9
14 13 12 11 10
15
16
17
18
4x4
3x4 3x4
14-11-0
14-11-0
-0-10-8
0-10-8
7-5-8
7-5-8
14-11-0
7-5-8
15-9-8
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
T13
TrussType
Common
Qty
1
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:372018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-nf3G3Oixo2lIwFSOAsmR8NhmIVMCk0eukKh_ykyH0QC
Scale=1:53.4
T2 T2
B1
W2
W1
W2
W1
T1 T1
1 B2
2
3
4
5
6
7
8 9
12 11 10
19
20
21 22
23
24
3x4
4x6
3x4
3x8
3x5 3x4
1.5x4
3x4
1.5x4
3x8
10-1-12
10-1-12
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
T13GE
TrussType
Common StructuralGable
Qty
1
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:382018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-FrdeHkiZZMt8YP1akaHggaEzQum4TMU1z_RXUAyH0QB
Scale=1:57.7
T2 T2
B1
W3
W2 W1
W1 W2
ST4
ST5
ST2
ST1 ST3
ST4
ST5
ST2
ST3 ST1
ST6
ST7
T1 T1
1 2 B2
3
4
5
6
7
8 9
16 15 14 1312 11
10
40
41
42 43
44
45
3x4
4x4
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
T14
TrussType
COMMONGIRDER
Qty
1
Ply
3
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:402018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-BEkPiQkp4z8sniBzr?K8l?JFyiOixCCKQIweY2yH0Q9
Scale=1:55.9
T2 T2
B1
W5
W4 W3
W2 W1
W3 W4
W1 W2
T1 T1
B2
1
2
3
4
5
6
7
8
9
15 14 13
12 11 10
20 21
22 23 24 25 26 27 28 29 30 31 32 33
3x8
6x8
3x8
5x12MT18H
8x8
12x12
4x6
8x8
5x6
3x8
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
T14
TrussType
COMMONGIRDER
Qty
1
Ply
3
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:402018 Page2
ID:490hraxo9ofAxAldCy0fEhyHstt-BEkPiQkp4z8sniBzr?K8l?JFyiOixCCKQIweY2yH0Q9
NOTES-
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 1707 lb uplift at joint 1 and 1983 lb uplift at joint 9.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
11) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 1110 lb down and 181 lb up at 0-11-4, 1110 lb down and 182 lb up at
2-11-4, 1110 lb down and 182 lb up at 4-11-4, 1110 lb down and 182 lb up at 6-11-4, 1110 lb down and 182 lb up at 8-11-4, 1110 lb down and 182 lb up at 10-11-4,
1110lb down and 182 lb up at 12-11-4, 1110 lb down and 182 lb up at 14-11-4, 1175 lb down and 228 lb up at 15-0-12, 1643 lb down and 257 lb up at 16-11-4, 1643 lb
down and 257 lb up at 18-11-4, 1643 lb down and 257 lb up at 20-11-4, 1643 lb down and 257 lb up at 22-11-4, 1643 lb down and 257 lb up at 24-11-4, and 1643 lb
down and 257 lb up at 26-11-4, and 1643 lb down and 257 lb up at 28-11-4 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of
others.
LOADCASE(S) Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-5=-51, 5-9=-51, 1-9=-20
Concentrated Loads(lb)
Vert: 12=-2034(F=-980) 17=-980 19=-1452(F) 22=-980(F) 23=-980(F) 24=-980(F) 25=-980(F) 26=-980(F) 27=-980(F) 28=-1452(F) 29=-1452(F) 30=-1452(F)
31=-1452(F) 32=-1452(F) 33=-1452(F)
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
V01
TrussType
Valley
Qty
1
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:412018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-fQInvllRrHGjPsm9PirNIDsYD6s?gqKTfyfB5VyH0Q8
Scale=1:52.4
T2
W1
B1
ST3
ST2
ST1
T1
B2
1
2
3
4
5
6
11 10 9 8 7
12
13
3x4
3x4
3x4
3x4
3x4 1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
17-4-0
17-4-0
17-4-0
17-4-0
0-0-4
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
V02
TrussType
Valley
Qty
1
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:422018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-7ds975m3cbOa00KMzQMcrQOj6WD0PJfducPldxyH0Q7
Scale=1:40.6
T1 W1
B1
ST2
ST1
1
2
3
4
7 6 5
8
9
3x4
3x4
1.5x4 2x4
1.5x4
1.5x4
1.5x4
13-4-0
13-4-0
0-0-4
6-8-0
6.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
V03
TrussType
Valley
Qty
1
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:432018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-cpQXKRmhNuWReAvYX7trNexw_vZy8mIm6G8I9NyH0Q6
Scale=1:29.6
T1
W1
B1
ST1
1
2
3
5 4
6
7
8
2x4
1.5x4
1.5x4 1.5x4
1.5x4
9-4-0
9-4-0
0-0-4
4-8-0
6.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
V04
TrussType
Valley
Qty
1
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:442018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-4?_vXnnK8CeIGKUk4rO4wrU4dJuItEmvLwurhqyH0Q5
Scale=1:17.1
T1
W1
B1
1
2
3
4
5
6
2x4
1.5x4
1.5x4
5-4-0
5-4-0
0-0-4
2-8-0
6.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
V05
TrussType
Valley
Qty
2
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:452018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-YCYIl7oyvWm9tT3xeYvJS30IQjGIcfN3aadPEGyH0Q4
Scale=1:41.6
T1 T1
B1
ST2
ST1 ST1
1
2
3
4
5
8 7 6
9
10 11
12
3x4
4x4
3x4
1.5x4 1.5x4
1.5x4
1.5x4
1.5x4
0-0-4
0-0-4
12-9-4
12-9-0
6-4-10
6-4-10
12-9-4
6-4-10
0-0-4
6-4-10
0-0-4
12.0012
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
V06
TrussType
Valley
Qty
2
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:462018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-0O6gyTpagpu0Vde7CFRY?GZSN7bZL6nCpENymiyH0Q3
Scale=1:35.9
T1 T1
B1
ST2
1 ST1 ST1
2
3
4
5
8 7 6
9
10
11 12
13
14
3x4
4x4
3x4
1.5x4 1.5x4
1.5x4
1.5x4
1.5x4
0-0-4
0-0-4
10-9-4
10-9-0
5-4-10
5-4-10
10-9-4
5-4-10
0-0-4
5-4-10
0-0-4
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
V07
TrussType
Valley
Qty
2
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:472018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-Uag2AppCR70t7nDJmzynYU6ckXwB4adM1u6WI8yH0Q2
Scale=1:30.2
T1 T1
B1
ST1
1
2
3
4
5
6
7
8
2x4
4x4
2x4
1.5x4
0-0-4
0-0-4
8-9-4
8-9-0
4-4-10
4-4-10
8-9-4
4-4-10
0-0-4
4-4-10
0-0-4
12.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
V08
TrussType
Valley
Qty
2
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:472018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-Uag2AppCR70t7nDJmzynYU6epXx94a1M1u6WI8yH0Q2
Scale:1/2"=1'
T1 T1
B1
ST1
1
2
3
4
2x4
4x4
1.5x4 2x4
0-0-4
0-0-4
6-9-4
6-9-0
3-4-10
3-4-10
6-9-4
3-4-10
0-0-4
3-4-10
0-0-4
12.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
V09
TrussType
Valley
Qty
2
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:482018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-ynDQN9qqCR8kkxoVJgT04heq0wI4p1UVGYs3qbyH0Q1
Scale=1:14.7
T1 T1
B1
ST1
1
2
3
4
2x4
4x4
1.5x4 2x4
4-9-0
4-9-0
4-9-4
0-0-4
2-4-10
2-4-10
4-9-4
2-4-10
0-0-4
2-4-10
0-0-4
12.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
V10
TrussType
Valley
Qty
2
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:492018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-QznobUrSzkGbM5NitO_FdvB?ZKeEYU?fVCbcN1yH0Q0
Scale=1:9.8
T1 T1
B1
1
2
3
2x4
3x4
2x4
2-9-0
2-9-0
2-9-4
0-0-4
1-4-10
1-4-10
2-9-4
1-4-10
0-0-4
1-4-10
0-0-4
12.0012
PlateOffsets(X,Y)-- [2:0-2-0,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
V11
TrussType
Valley
Qty
1
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:502018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-u9LBoqs4k2OS_FyuR5VU96kANk_dHxFojsLAvTyH0Q?
Scale=1:9.1
T1 T1
B1
1
2
3
2x4
3x4
2x4
0-0-4
0-0-4
2-6-1
2-5-13
1-3-0
1-3-0
2-6-1
1-3-0
0-0-4
1-3-0
0-0-4
12.0012
PlateOffsets(X,Y)-- [2:0-2-0,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
V12
TrussType
Valley
Qty
1
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:512018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-NLvZ0AtjVMWIcOX4?p0jiKGHT8H30LRxyW4jRwyH0Q_
Scale:1/4"=1'
T1 T1
B1
ST3
ST2
ST1
ST2
ST1
B2
1
2
3
4
5
6
7
13 12 11 10 9 8
14
15
16 17
18
19
3x4
4x4
3x4
3x4
0-0-8
0-0-8
28-4-0
28-3-8
14-2-0
14-2-0
28-4-0
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
V13
TrussType
Valley
Qty
1
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:522018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-rYTxDWtLGfe9DY5HYWXyFXpUTYezlpb5BAqGyMyH0Pz
Scale=1:41.9
T1 T1
B1
ST3
ST2
ST1
ST2
ST1
B2
1
2
3
4
5
6
7
12 11 10 9 8
13
14 15
16
3x4
4x4
3x4
5x6
0-0-8
0-0-8
24-4-0
24-3-8
12-2-0
12-2-0
24-4-0
12-2-0
0-0-4
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
V14
TrussType
Valley
Qty
1
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:532018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-Jk1JQsuz0zm0rigT6D3BnlMcpxyVUHcEQqZqVoyH0Py
Scale=1:35.0
T1 T1
B1
ST2
ST1 ST1
B2
1
2
3
4
5
8 7 6
9
10
11 12
13
14
3x4
4x4
3x4
5x6 1.5x4
1.5x4
1.5x4
1.5x4
0-0-8
0-0-8
20-4-0
20-3-8
10-2-0
10-2-0
20-4-0
10-2-0
0-0-4
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
V15
TrussType
Valley
Qty
1
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:542018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-nwbheCvbnHutTsFfgxaQKyuqkLKWDkCOeUJN1EyH0Px
Scale=1:28.2
T1 T1
B1
ST2
ST1 ST1
B2
1
2
3
4
5
8 7 6
9
10
11 12
13
14
3x4
4x4
3x4
5x6 1.5x4
1.5x4
1.5x4
1.5x4
16-3-8
16-3-8
16-4-0
0-0-8
8-2-0
8-2-0
16-4-0
8-2-0
0-0-4
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
V16
TrussType
Valley
Qty
1
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:552018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-F784rYwDYa1k40qsEe5fsARyyldEyBGXt82xZhyH0Pw
Scale=1:21.3
T1 T1
B1
ST1
1
2
3
4
5
6
7
8
9
10
3x4
4x6
1.5x4 3x4
0-0-8
0-0-8
12-4-0
12-3-8
6-2-0
6-2-0
12-4-0
6-2-0
0-0-4
3-1-0
0-0-4
6.0012
LOADING (psf)
TCLL
TCDL
BCLL
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
V17
TrussType
Valley
Qty
1
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:562018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-jJiS3uwrJu9biAP2nMcuPN_9w90phf3h6ooU67yH0Pv
Scale=1:15.7
T1 T1
B1
ST1
1
2
3
4
5
6
7
8
2x4
4x4
1.5x4 2x4
0-0-8
0-0-8
8-4-0
8-3-8
4-2-0
4-2-0
8-4-0
4-2-0
0-0-4
2-1-0
0-0-4
6.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
DE Job# 62663-W1
Dansco Engineering, LLC
Date: 11/21/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss
engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing
design shall be the
responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for
Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood
Trusses” for additional
information.
Job
1803049-12T
Truss
V18
TrussType
Valley
Qty
1
Ply
1
1803049-12T Estridge AutumnWoodsLot 9
Job Reference (optional)
Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.WedNov2109:21:572018 Page1
ID:490hraxo9ofAxAldCy0fEhyHstt-BVGqGExT4CHSKJ_EL377ybWNAZMBQ6_qKSX1eZyH0Pu
Scale=1:8.1
T1 T1
B1
1
2
3
2x4
3x4
2x4
0-0-8
0-0-8
4-4-0
4-3-8
2-2-0
2-2-0
4-4-0
2-2-0
0-0-4
1-1-0
0-0-4
6.0012
PlateOffsets(X,Y)-- [2:0-2-0,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.04
0.10
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 9 lb FT= 20%
GRIP
185/148
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-4-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. (lb/size)1=109/4-3-0(min. 0-1-8), 3=109/4-3-0(min. 0-1-8)
Max Horz1=-14(LC 21)
Max Uplift1=-17(LC 16), 3=-17(LC 17)
MaxGrav1=123(LC 2), 3=123(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)Gablerequirescontinuous bottomchord bearing.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.20
0.11
0.04
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 21 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. (lb/size)1=126/8-3-0(min. 0-1-8), 3=126/8-3-0(min. 0-1-8), 4=250/8-3-0(min. 0-1-8)
Max Horz1=-31(LC 17)
Max Uplift1=-37(LC 16), 3=-43(LC 17), 4=-6(LC 16)
MaxGrav1=143(LC 2), 3=143(LC 2), 4=279(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-7-9 to 3-7-9,Interior(1) 3-7-9 to 4-2-0,Exterior(2) 4-2-0 to 7-2-0zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)Gablerequirescontinuous bottomchord bearing.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3, 4.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.34
0.26
0.08
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 32 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. (lb/size)1=175/12-3-0(min. 0-1-8), 3=175/12-3-0(min. 0-1-8), 4=435/12-3-0(min. 0-1-8)
Max Horz1=49(LC 16)
Max Uplift1=-44(LC 16), 3=-53(LC 17), 4=-37(LC 16)
MaxGrav1=202(LC 33), 3=202(LC 34), 4=489(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
WEBS 2-4=-304/122
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-7-9 to 3-7-9,Interior(1) 3-7-9 to 6-2-0,Exterior(2) 6-2-0 to 9-2-0zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)Gablerequirescontinuous bottomchord bearing.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3, 4.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
4-1-0
0-0-4
6.0012
PlateOffsets(X,Y)-- [8:0-3-0,0-3-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.18
0.10
0.07
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
5
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 46 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. All bearings 16-3-0.
(lb)-Max Horz1=-67(LC 21)
Max UpliftAll uplift 100 lb orless at joint(s) 1, 5 except 8=-120(LC 16), 6=-126(LC 17)
MaxGravAllreactions 250 lb orless at joint(s) 1, 5 except 7=268(LC 2), 8=348(LC 33), 6=358(LC 34)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
WEBS 2-8=-257/161, 4-6=-265/167
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-7-9 to 3-7-9,Interior(1) 3-7-9 to 8-2-0,Exterior(2) 8-2-0 to 11-2-0zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)Gablerequirescontinuous bottomchord bearing.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 5 except(jt=lb)
8=120, 6=126.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
5-1-0
0-0-4
6.0012
PlateOffsets(X,Y)-- [8:0-3-0,0-3-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.32
0.21
0.09
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
5
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 59 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. All bearings 20-3-0.
(lb)-Max Horz1=84(LC 16)
Max UpliftAll uplift 100 lb orless at joint(s) 1, 5 except 8=-160(LC 16), 6=-164(LC 17)
MaxGravAllreactions 250 lb orless at joint(s) 1, 5, 7 except 8=474(LC 33), 6=481(LC 34)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
WEBS 2-8=-335/206, 4-6=-341/210
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-7-9 to 3-7-9,Interior(1) 3-7-9 to 10-2-0,Exterior(2) 10-2-0 to 13-2-0zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)Gablerequirescontinuous bottomchord bearing.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 5 except(jt=lb)
8=160, 6=164.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
6-1-0
0-0-4
6.0012
PlateOffsets(X,Y)-- [11:0-3-0,0-3-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.17
0.10
0.14
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
7
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 76 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. All bearings 24-3-0.
(lb)-Max Horz1=102(LC 16)
Max UpliftAll uplift 100 lb orless at joint(s) 1 except 11=-116(LC 16), 12=-110(LC 16), 9=-118(LC 17),
8=-111(LC 17)
MaxGravAllreactions 250 lb orless at joint(s) 1, 7 except 10=277(LC 2), 11=332(LC 33), 12=335(LC 2),
9=337(LC 34), 8=333(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
WEBS 3-11=-256/166, 5-9=-260/169
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-7-9 to 3-7-9,Interior(1) 3-7-9 to 12-2-0,Exterior(2) 12-2-0 to 15-2-0zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)All plates are 1.5x4MT20 unless otherwiseindicated.
6)Gablerequirescontinuous bottomchord bearing.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1 except(jt=lb)
11=116, 12=110, 9=118, 8=111.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
14-2-0
0-0-4
7-1-0
0-0-4
6.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.31
0.21
0.20
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.01
(loc)
-
-
7
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 92 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. All bearings 28-3-0.
(lb)-Max Horz1=119(LC 20)
Max UpliftAll uplift 100 lb orless at joint(s) 1, 7 except 12=-104(LC 16), 13=-153(LC 16), 9=-103(LC 17),
8=-153(LC 17)
MaxGravAllreactions 250 lb orless at joint(s) 1, 7 except 10=297(LC 2), 12=292(LC 22), 13=459(LC 2),
9=292(LC 23), 8=459(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
WEBS 2-13=-322/198, 6-8=-322/198
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-7-9 to 3-7-9,Interior(1) 3-7-9 to 14-2-0,Exterior(2) 14-2-0 to 17-2-0zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)All plates are 1.5x4MT20 unless otherwiseindicated.
6)Gablerequirescontinuous bottomchord bearing.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 7 except(jt=lb)
12=104, 13=153, 9=103, 8=153.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.01
0.03
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 6 lb FT= 20%
GRIP
185/148
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-6-1 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. (lb/size)1=64/2-5-9(min. 0-1-8), 3=64/2-5-9(min. 0-1-8)
Max Horz1=-24(LC 12)
Max Uplift1=-7(LC 16), 3=-7(LC 17)
MaxGrav1=72(LC 2), 3=72(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)Gablerequirescontinuous bottomchord bearing.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 7 lb uplift at joint 1 and 7 lb uplift at joint
3.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.02
0.04
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 7 lb FT= 20%
GRIP
185/148
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-9-4 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. (lb/size)1=73/2-8-12(min. 0-1-8), 3=73/2-8-12(min. 0-1-8)
Max Horz1=-27(LC 14)
Max Uplift1=-8(LC 16), 3=-8(LC 16)
MaxGrav1=83(LC 2), 3=83(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)Gablerequirescontinuous bottomchord bearing.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 8 lb uplift at joint 1 and 8 lb uplift at joint
3.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.07
0.04
0.02
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 14 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-9-4 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. (lb/size)1=86/4-8-12(min. 0-1-8), 3=86/4-8-12(min. 0-1-8), 4=117/4-8-12(min. 0-1-8)
Max Horz1=53(LC 13)
Max Uplift1=-27(LC 17), 3=-27(LC 17)
MaxGrav1=98(LC 2), 3=98(LC 2), 4=129(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)Gablerequirescontinuous bottomchord bearing.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 27 lb uplift at joint 1 and 27 lb uplift at
joint 3.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.16
0.08
0.03
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 21 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. (lb/size)1=128/6-8-12(min. 0-1-8), 3=128/6-8-12(min. 0-1-8), 4=174/6-8-12(min. 0-1-8)
Max Horz1=-79(LC 12)
Max Uplift1=-40(LC 17), 3=-40(LC 17)
MaxGrav1=147(LC 2), 3=147(LC 2), 4=192(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)Gablerequirescontinuous bottomchord bearing.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 40 lb uplift at joint 1 and 40 lb uplift at
joint 3.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.29
0.14
0.06
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 28 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. (lb/size)1=170/8-8-12(min. 0-1-8), 3=170/8-8-12(min. 0-1-8), 4=232/8-8-12(min. 0-1-8)
Max Horz1=-105(LC 12)
Max Uplift1=-53(LC 17), 3=-53(LC 17)
MaxGrav1=195(LC 2), 3=195(LC 2), 4=255(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-4 to 3-4-4,Interior(1) 3-4-4 to 4-4-10,Exterior(2) 4-4-10 to 7-4-10zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)Gablerequirescontinuous bottomchord bearing.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 53 lb uplift at joint 1 and 53 lb uplift at
joint 3.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
12.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.21
0.10
0.10
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
5
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 36 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. All bearings 10-8-12.
(lb)-Max Horz1=-131(LC 12)
Max UpliftAll uplift 100 lb orless at joint(s) except 1=-128(LC 14), 5=-106(LC 15), 8=-269(LC 16), 6=-269(LC
17)
MaxGravAllreactions 250 lb orless at joint(s) 1, 5, 7 except 8=389(LC 29), 6=389(LC 30)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
WEBS 2-8=-386/310, 4-6=-386/310
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-4 to 3-4-4,Interior(1) 3-4-4 to 5-4-10,Exterior(2) 5-4-10 to 8-4-10zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)Gablerequirescontinuous bottomchord bearing.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 128 lb uplift at joint 1, 106 lb uplift at
joint 5, 269 lb uplift at joint 8 and 269 lb uplift at joint 6.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.15
0.11
0.11
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
5
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 46 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. All bearings 12-8-12.
(lb)-Max Horz1=-158(LC 12)
Max UpliftAll uplift 100 lb orless at joint(s) 1, 5 except 8=-225(LC 16), 6=-225(LC 17)
MaxGravAllreactions 250 lb orless at joint(s) 1, 5, 7 except 8=344(LC 29), 6=344(LC 30)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
WEBS 2-8=-321/267, 4-6=-321/267
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-4 to 3-4-4,Interior(1) 3-4-4 to 6-4-10,Exterior(2) 6-4-10 to 9-4-10zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)Gablerequirescontinuous bottomchord bearing.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 5 except(jt=lb)
8=225, 6=225.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.35
0.22
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 15 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-4-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. (lb/size)1=161/5-3-8(min. 0-1-8), 3=161/5-3-8(min. 0-1-8)
Max Horz1=95(LC 13)
Max Uplift1=-26(LC 16), 3=-50(LC 16)
MaxGrav1=182(LC 2), 3=182(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-7-9 to 3-7-9,Interior(1) 3-7-9 to 5-2-4zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.28
0.16
0.08
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
-0.00
(loc)
-
-
4
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 29 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
WEBS 2x4SPFStud
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. (lb/size)1=131/9-3-8(min. 0-1-8), 4=93/9-3-8(min. 0-1-8), 5=381/9-3-8(min. 0-1-8)
Max Horz1=178(LC 13)
Max Uplift4=-27(LC 13), 5=-146(LC 16)
MaxGrav1=151(LC 30), 4=112(LC 22), 5=431(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
WEBS 2-5=-323/231
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-7-9 to 3-7-9,Interior(1) 3-7-9 to 9-2-4zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 4 except(jt=lb)
5=146.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.42
0.14
0.10
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
-0.00
(loc)
-
-
5
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 46 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
WEBS 2x4SPFStud
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. All bearings 13-3-8.
(lb)-Max Horz1=262(LC 13)
Max UpliftAll uplift 100 lb orless at joint(s) 5 except 6=-107(LC 16), 7=-135(LC 16)
MaxGravAllreactions 250 lb orless at joint(s) 1, 5 except 6=318(LC 2), 7=400(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-8=-304/187, 2-8=-287/210
WEBS 2-7=-284/179
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-7-9 to 3-7-9,Interior(1) 3-7-9 to 13-2-4zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 5 except(jt=lb)
6=107, 7=135.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
8-8-0
6.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.42
0.19
0.24
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
-0.00
(loc)
-
-
7
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 65 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
WEBS 2x4 HF/SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 6-7
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. All bearings 17-3-8.
(lb)-Max Horz1=345(LC 13)
Max UpliftAll uplift 100 lb orless at joint(s) 7, 9 except 8=-119(LC 16), 11=-138(LC 16)
MaxGravAllreactions 250 lb orless at joint(s) 7, 1 except 8=370(LC 22), 9=288(LC 2), 11=407(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-12=-385/237, 2-12=-369/261, 2-3=-302/177, 3-4=-290/210
WEBS 5-8=-282/171, 2-11=-289/178
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-7-9 to 3-7-9,Interior(1) 3-7-9 to 17-2-4zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 7, 9 except(jt=lb)
8=119, 11=138.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
4x6
8x8
5x6
3x8
5x12MT18H
5-6-11
5-6-11
10-3-2
4-8-6
14-11-8
4-8-6
19-7-14
4-8-6
24-4-5
4-8-6
29-11-0
5-6-11
5-6-11
5-6-11
10-3-2
4-8-6
14-11-8
4-8-6
19-7-14
4-8-6
24-4-5
4-8-6
29-11-0
5-6-11
0-4-4
7-10-0
0-4-4
6.0012
PlateOffsets(X,Y)-- [1:0-3-12,0-2-12], [4:0-1-12,0-1-12], [6:0-1-12,0-1-12], [9:0-3-12,0-2-12], [10:0-5-8,0-1-8], [11:0-3-8,0-5-4], [12:0-6-0,0-6-4], [14:0-3-8,0-5-4], [15:0-5-8
,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.91
0.71
0.93
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.26
-0.65
0.17
(loc)
11-12
11-12
9
l/defl
>999
>551
n/a
L/d
240
180
n/a
PLATES
MT20
MT18H
Weight: 540 lb FT= 20%
GRIP
197/144
197/144
LUMBER-
TOP CHORD2x4SPF 1650F 1.5E*Except*
T1: 2x4SPF 2100F 1.8E
BOT CHORD2x8SP 2400F 2.0E
WEBS 2x4SPFStud*Except*
W5: 2x4SPF 1650F 1.5E
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-1-14 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
REACTIONS. (lb/size)1=9718/0-5-8(min. 0-3-1), 9=11459/0-5-8(min. 0-3-9)
Max Horz1=-132(LC 38)
Max Uplift1=-1707(LC 12), 9=-1983(LC 13)
MaxGrav1=10992(LC 2), 9=12959(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-2=-21658/3367, 2-3=-17783/2763, 3-4=-17720/2776, 4-20=-14466/2278,
5-20=-14412/2297, 5-21=-14412/2300, 6-21=-14466/2280, 6-7=-19239/2986,
7-8=-19289/2973, 8-9=-24757/3796
BOT CHORD 1-22=-3070/19357, 22-23=-3070/19357, 15-23=-3070/19357, 15-24=-3070/19357,
24-25=-3070/19357, 14-25=-3070/19357, 14-26=-2443/15849, 26-27=-2443/15849,
13-27=-2443/15849, 12-13=-2443/15849, 12-28=-2520/17208, 28-29=-2520/17208,
11-29=-2520/17208, 11-30=-3323/22137, 30-31=-3323/22137, 10-31=-3323/22137,
10-32=-3323/22137, 32-33=-3323/22137, 9-33=-3323/22137
WEBS 5-12=-1945/12567, 6-12=-6323/1070, 6-11=-955/6508, 8-11=-5669/948, 8-10=-687/4901,
4-12=-4335/792, 4-14=-657/4377, 2-14=-4035/722, 2-15=-480/3404
NOTES-
1) 3-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows:
Topchordsconnected as follows: 2x4- 2 rowsstaggered at 0-7-0 oc.
Bottomchordsconnected as follows: 2x8- 2 rowsstaggered at 0-5-0 oc.
Websconnected as follows: 2x4- 1 row at 0-9-0 oc.
2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to
plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated.
3) Unbalancedroofliveloads have been considered for this design.
4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate
grip DOL=1.60
5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
6) Unbalancedsnowloads have been considered for this design.
7)All plates areMT20 plates unless otherwiseindicated.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
Continued on page 2
3x4
3x6 3x4
3x8
3x4 3x4
3x8
8-11-8
8-11-8
14-11-8
6-0-0
15-5-8
0-6-0
20-11-8
5-6-0
29-11-0
8-11-8
-0-10-8
0-10-8
8-11-8
8-11-8
14-11-8
6-0-0
20-11-8
6-0-0
29-11-0
8-11-8
30-9-8
0-10-8
0-4-4
7-10-0
0-4-4
6.0012
PlateOffsets(X,Y)-- [2:0-6-0,0-0-13], [8:0-8-0,0-0-9]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.65
0.53
0.69
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.10
-0.29
0.01
(loc)
10-39
10-39
8
l/defl
>999
>614
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 149 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
WEBS 2x4 HF/SPF No.2 *Except*
W1: 2x4SPFStud
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-6-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing,Except:
10-0-0 oc bracing: 10-11,8-10.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. All bearings 15-5-8 except(jt=length) 8=0-5-8.
(lb)-Max Horz2=-140(LC 17)
Max UpliftAll uplift 100 lb orless at joint(s) except 2=-100(LC 16), 11=-167(LC 17), 15=-156(LC 16),
8=-135(LC 17)
MaxGravAllreactions 250 lb orless at joint(s) 13, 14 except 2=416(LC 34), 11=1077(LC 2), 11=950(LC 1),
15=257(LC 34), 16=258(LC 7), 8=589(LC 35), 2=346(LC 1)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 5-42=0/264, 5-43=0/264, 7-45=-381/115, 8-45=-492/74
BOT CHORD 10-11=0/341, 8-10=0/341
WEBS 5-11=-455/49, 7-11=-653/226, 7-10=0/316, 3-11=-252/136, 3-15=-295/174
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-8 to 2-1-8,Interior(1) 2-1-8 to 14-11-8,Exterior(2) 14-11-8 to 17-11-8
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry
GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.
4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
5) Unbalancedsnowloads have been considered for this design.
6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
7)All plates are 1.5x4MT20 unless otherwiseindicated.
8)Gablestudsspaced at 2-0-0 oc.
9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint 2, 167 lb uplift at
joint 11, 156 lb uplift at joint 15, 135 lb uplift at joint 8 and 100 lb uplift at joint 2.
11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S) Standard
19-9-4
9-7-7
29-11-0
10-1-12
-0-10-8
0-10-8
7-8-15
7-8-15
14-11-8
7-2-9
22-2-1
7-2-9
29-11-0
7-8-15
30-9-8
0-10-8
0-4-4
7-10-0
0-4-4
6.0012
PlateOffsets(X,Y)-- [2:0-4-13,0-1-8], [8:0-4-13,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.80
0.82
0.22
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.16
-0.47
0.09
(loc)
12-15
10-12
8
l/defl
>999
>771
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 107 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
WEBS 2x4 HF/SPF No.2 *Except*
W1: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. (lb/size)2=1103/0-5-8(min. 0-2-1), 8=1103/0-5-8(min. 0-2-1)
Max Horz2=-140(LC 17)
Max Uplift2=-192(LC 16), 8=-192(LC 17)
MaxGrav2=1249(LC 2), 8=1249(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-19=-2011/270, 3-19=-1838/304, 3-4=-1775/287, 4-20=-1683/302, 20-21=-1668/304,
5-21=-1660/323, 5-22=-1659/323, 22-23=-1668/305, 6-23=-1683/302, 6-7=-1775/287,
7-24=-1838/304, 8-24=-2011/270
BOT CHORD 2-12=-295/1718, 11-12=-69/1143, 10-11=-69/1143, 8-10=-174/1718
WEBS 5-10=-141/663, 7-10=-430/278, 5-12=-141/663, 3-12=-430/277
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-8 to 2-1-8,Interior(1) 2-1-8 to 14-11-8,Exterior(2) 14-11-8 to 17-11-8
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
2=192, 8=192.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
0-10-8
0-4-4
4-1-0
0-4-4
6.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.11
0.07
0.05
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
0.01
0.00
(loc)
9
9
8
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 53 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. All bearings 14-11-0.
(lb)-Max Horz2=73(LC 20)
Max UpliftAll uplift 100 lb orless at joint(s) 2, 8, 13, 14, 11, 10
MaxGravAllreactions 250 lb orless at joint(s) 2, 8, 12, 13, 11 except 14=267(LC 2), 10=267(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-C Corner(3)-0-10-8 to 2-1-8,Exterior(2) 2-1-8 to 7-5-8, Corner(3) 7-5-8 to 10-5-8zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry
GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.
4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
5) Unbalancedsnowloads have been considered for this design.
6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
7)All plates are 1.5x4MT20 unless otherwiseindicated.
8)Gablerequirescontinuous bottomchord bearing.
9)Gablestudsspaced at 2-0-0 oc.
10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 8, 13, 14, 11,
10.
12)Beveled plate orshimrequired to provide full bearingsurfacewith trusschord at joint(s) 2.
13)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S) Standard
0-4-4
6.0012
PlateOffsets(X,Y)-- [2:0-6-0,0-0-5], [4:0-6-0,0-0-5]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.49
0.41
0.12
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.04
-0.13
0.01
(loc)
6-9
6-9
4
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 43 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-1-10 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. (lb/size)2=572/0-5-8(min. 0-1-8), 4=573/0-5-8(min. 0-1-8)
Max Horz2=73(LC 20)
Max Uplift2=-113(LC 16), 4=-113(LC 17)
MaxGrav2=649(LC 2), 4=649(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-13=-726/97, 13-14=-628/113, 14-15=-621/114, 3-15=-595/130, 3-16=-595/130,
16-17=-621/114, 17-18=-628/113, 4-18=-726/97
BOT CHORD 2-6=-10/561, 4-6=-10/561
WEBS 3-6=0/300
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-8 to 2-1-8,Interior(1) 2-1-8 to 7-5-8,Exterior(2) 7-5-8 to 10-5-8zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
2=113, 4=113.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
9-7-2
9-5-2
18-7-14
9-0-13
28-3-0
9-7-2
7-3-15
7-3-15
14-1-8
6-9-9
20-11-1
6-9-9
28-3-0
7-3-15
0-4-4
7-5-0
0-4-4
6.0012
PlateOffsets(X,Y)-- [1:0-0-8,0-0-3], [6:0-0-8,0-0-3]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.63
0.74
0.18
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.13
-0.39
0.08
(loc)
7-15
7-9
6
l/defl
>999
>878
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 98 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
WEBS 2x4 HF/SPF No.2 *Except*
W1: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-5-3 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. (lb/size)1=1000/0-3-8(min. 0-1-14), 6=1000/0-5-8(min. 0-1-14)
Max Horz1=-124(LC 17)
Max Uplift1=-162(LC 16), 6=-162(LC 17)
MaxGrav1=1130(LC 2), 6=1130(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-16=-1897/272, 2-16=-1735/295, 2-17=-1675/294, 17-18=-1574/296, 3-18=-1571/312,
3-19=-1571/312, 19-20=-1574/296, 4-20=-1585/294, 4-5=-1675/279, 5-21=-1735/295,
6-21=-1897/272
BOT CHORD 1-9=-285/1621, 8-9=-72/1079, 7-8=-72/1079, 6-7=-179/1621
WEBS 3-7=-134/626, 5-7=-406/262, 3-9=-133/626, 2-9=-406/261
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 14-1-8,Exterior(2) 14-1-8 to 17-1-8zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
1=162, 6=162.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
3x6
3x6
3x8
3x4 3x4
8-1-8
8-1-8
14-1-8
6-0-0
15-1-0
0-11-8
20-1-8
5-0-8
28-3-0
8-1-8
-0-10-8
0-10-8
8-1-8
8-1-8
14-1-8
6-0-0
20-1-8
6-0-0
28-3-0
8-1-8
0-4-4
7-5-0
0-4-4
6.0012
PlateOffsets(X,Y)-- [2:0-2-5,0-1-8], [7:0-2-5,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.56
0.45
0.69
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.07
-0.20
0.02
(loc)
17-34
17-34
15
l/defl
>999
>893
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 129 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
WEBS 2x4SPFStud
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-10-5 oc purlins.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing,Except:
10-0-0 oc bracing: 2-17,16-17.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. All bearings 13-5-8 except(jt=length) 2=0-5-8, 15=0-3-8.
(lb)-Max Horz2=140(LC 16)
Max UpliftAll uplift 100 lb orless at joint(s) 7, 9, 8 except 2=-133(LC 16), 11=-143(LC 17), 13=-218(LC 2),
15=-137(LC 16)
MaxGravAllreactions 250 lb orless at joint(s) 7, 13, 12, 10, 9, 8, 7 except 2=735(LC 2), 11=805(LC 2),
15=557(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-35=-886/99, 3-35=-787/135, 3-4=-299/111, 6-39=-299/111
BOT CHORD 2-17=-133/704, 16-17=-133/704
WEBS 6-16=-7/345, 6-11=-779/171, 3-16=-636/220, 3-17=0/304
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-8 to 2-1-8,Interior(1) 2-1-8 to 14-1-8,Exterior(2) 14-1-8 to 17-1-8
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry
GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.
4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
5) Unbalancedsnowloads have been considered for this design.
6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
7)All plates are 1.5x4MT20 unless otherwiseindicated.
8)Gablestudsspaced at 2-0-0 oc.
9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 7, 9, 8, 7 except
(jt=lb) 2=133, 11=143, 13=218, 15=137.
11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S) Standard
9-5-2
18-7-14
9-0-13
28-3-0
9-7-2
-0-10-8
0-10-8
7-3-15
7-3-15
14-1-8
6-9-9
20-11-1
6-9-9
28-3-0
7-3-15
0-4-4
7-5-0
0-4-4
6.0012
PlateOffsets(X,Y)-- [2:0-4-13,0-1-8], [8:0-4-13,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.65
0.74
0.18
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.13
-0.39
0.08
(loc)
9-14
9-11
8
l/defl
>999
>876
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 100 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
WEBS 2x4 HF/SPF No.2 *Except*
W1: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-5-8 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. (lb/size)8=1000/0-5-8(min. 0-1-14), 2=1045/0-3-8(min. 0-1-15)
Max Horz2=140(LC 20)
Max Uplift8=-162(LC 17), 2=-182(LC 16)
MaxGrav8=1130(LC 2), 2=1183(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-18=-1895/257, 3-18=-1733/289, 3-4=-1673/274, 4-19=-1583/288, 19-20=-1573/290,
5-20=-1569/307, 5-21=-1570/312, 21-22=-1574/295, 6-22=-1589/293, 6-7=-1674/279,
7-23=-1734/295, 8-23=-1896/272
BOT CHORD 2-11=-284/1619, 10-11=-72/1079, 9-10=-72/1079, 8-9=-177/1620
WEBS 5-9=-134/626, 7-9=-406/262, 5-11=-133/624, 3-11=-405/261
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-8 to 2-1-8,Interior(1) 2-1-8 to 14-1-8,Exterior(2) 14-1-8 to 17-1-8
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
8=162, 2=182.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
0-4-4
4-2-0
0-4-4
6.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.12
0.08
0.05
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
0.01
0.00
(loc)
9
9
8
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 54 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. All bearings 15-3-0.
(lb)-Max Horz2=75(LC 20)
Max UpliftAll uplift 100 lb orless at joint(s) 2, 8, 13, 14, 11, 10
MaxGravAllreactions 250 lb orless at joint(s) 2, 8, 12, 13, 11 except 14=281(LC 2), 10=281(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-C Corner(3)-0-10-8 to 2-1-8,Exterior(2) 2-1-8 to 7-7-8, Corner(3) 7-7-8 to 10-7-8zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry
GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.
4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
5) Unbalancedsnowloads have been considered for this design.
6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
7)All plates are 1.5x4MT20 unless otherwiseindicated.
8)Gablerequirescontinuous bottomchord bearing.
9)Gablestudsspaced at 2-0-0 oc.
10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 8, 13, 14, 11,
10.
12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S) Standard
4-2-0
0-4-4
6.0012
PlateOffsets(X,Y)-- [2:0-2-5,0-1-8], [4:0-2-5,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.52
0.43
0.12
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.05
-0.14
0.02
(loc)
6-9
6-9
4
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 44 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-0-1 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. (lb/size)4=584/0-5-8(min. 0-1-8), 2=584/0-3-8(min. 0-1-8)
Max Horz2=75(LC 20)
Max Uplift4=-115(LC 17), 2=-115(LC 16)
MaxGrav4=663(LC 2), 2=662(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-13=-743/96, 13-14=-642/113, 14-15=-633/115, 3-15=-608/131, 3-16=-608/131,
16-17=-633/115, 17-18=-642/113, 4-18=-743/96
BOT CHORD 2-6=-10/574, 4-6=-10/574
WEBS 3-6=0/307
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-8 to 2-1-8,Interior(1) 2-1-8 to 7-7-8,Exterior(2) 7-7-8 to 10-7-8zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
4=115, 2=115.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
13 12
11 10
48
49
50 51
52
53
16
3x6
5x6
3x6
3x8
3x6 3x8
3x4
3x4
3x4
3x4
3x5
3x5
3x6
3x6
8-9-8
8-9-8
13-6-0
4-8-8
14-9-8
1-3-8
20-9-8
6-0-0
26-9-8
6-0-0
32-9-8
6-0-0
41-7-0
8-9-8
8-9-8
8-9-8
14-9-8
6-0-0
20-9-8
6-0-0
26-9-8
6-0-0
32-9-8
6-0-0
41-7-0
8-9-8
0-4-4
10-9-0
0-4-4
6.0012
PlateOffsets(X,Y)-- [1:0-8-0,0-0-13], [9:0-2-5,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.73
0.69
0.93
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.11
-0.34
0.06
(loc)
10-47
10-47
9
l/defl
>999
>980
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 237 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
WEBS 2x4 HF/SPF No.2 *Except*
W1: 2x4SPFStud
OTHERS 2x4SPFStud
WEDGE
Left: 2x4SPFStud, Right: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
WEBS 1 Row at midpt 6-13
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. All bearings 13-9-8 except(jt=length) 9=0-5-8, 16=0-3-8.
(lb)-Max Horz1=-183(LC 17)
Max UpliftAll uplift 100 lb orless at joint(s) 1, 21, 22 except 19=-257(LC 16),
17=-506(LC 2), 9=-208(LC 17), 16=-148(LC 17)
MaxGravAllreactions 250 lb orless at joint(s) 1, 17, 18, 20, 21, 22, 1 except
19=1377(LC 2), 9=1195(LC 2), 16=897(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-48=-91/363, 2-48=-68/496, 2-3=-524/145, 3-4=-379/173, 4-49=-861/243,
49-50=-781/256, 5-50=-776/272, 5-51=-776/262, 51-52=-781/246, 6-52=-861/233,
6-7=-1239/295, 7-8=-1384/266, 8-53=-1831/318, 9-53=-1945/279
BOT CHORD 1-22=-351/186, 21-22=-351/186, 20-21=-351/186, 19-20=-351/186, 18-19=-351/186,
17-18=-351/186, 16-17=-351/186, 15-16=-351/186, 14-15=-26/399, 13-14=-26/399,
12-13=-19/1159, 11-12=-19/1159, 10-11=-168/1638, 9-10=-168/1638
WEBS 5-13=-107/403, 6-13=-750/262, 6-11=-51/481, 8-11=-596/203, 8-10=0/298,
4-13=-35/525, 4-15=-882/150, 2-15=-26/914, 2-19=-1355/285
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 20-9-8,Exterior(2) 20-9-8 to 23-9-8zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry
GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.
4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
5) Unbalancedsnowloads have been considered for this design.
6)All plates are 1.5x4MT20 unless otherwiseindicated.
7)Gablestudsspaced at 2-0-0 oc.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 21, 22, 1
except(jt=lb) 19=257, 17=506, 9=208, 16=148.
Continued on page 2
3x4
3x4
3x4
1.5x4
3x4
3x4
3x4
1.5x4
3x6 3x8
7-3-6
7-3-6
14-0-7
6-9-1
20-9-8
6-9-1
27-6-9
6-9-1
34-3-10
6-9-1
41-7-0
7-3-6
7-3-6
7-3-6
14-0-7
6-9-1
20-9-8
6-9-1
27-6-9
6-9-1
34-3-10
6-9-1
41-7-0
7-3-6
0-4-4
10-9-0
0-4-4
6.0012
PlateOffsets(X,Y)-- [1:0-8-0,0-0-5], [9:0-8-0,0-0-5]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.80
0.82
0.63
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.21
-0.56
0.22
(loc)
13
11-13
9
l/defl
>999
>893
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 177 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
WEBS 2x4 HF/SPF No.2 *Except*
W3,W1: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 8-4-10 oc bracing.
WEBS 1 Row at midpt 6-13, 4-13
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. (lb/size)1=1472/Mechanical, 9=1472/Mechanical
Max Horz1=-183(LC 17)
Max Uplift1=-237(LC 16), 9=-237(LC 17)
MaxGrav1=1663(LC 2), 9=1663(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-23=-3077/383, 2-23=-2982/406, 2-3=-2525/350, 3-4=-2362/382, 4-24=-1930/347,
24-25=-1831/363, 5-25=-1830/380, 5-26=-1830/380, 26-27=-1831/363, 6-27=-1930/347,
6-7=-2362/382, 7-8=-2525/350, 8-28=-2982/408, 9-28=-3077/385
BOT CHORD 1-16=-451/2668, 15-16=-451/2668, 14-15=-278/2181, 13-14=-278/2181, 12-13=-144/2181,
11-12=-144/2181, 10-11=-270/2668, 9-10=-270/2668
WEBS 5-13=-164/1270, 6-13=-795/279, 6-11=-13/474, 8-11=-562/199, 8-10=0/260,
4-13=-795/278, 4-15=-13/474, 2-15=-562/197, 2-16=0/260
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 20-9-8,Exterior(2) 20-9-8 to 23-9-8zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
1=237, 9=237.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
3x4
3x4
1.5x4
3x4
3x4
3x4
1.5x4
3x6 3x8
7-3-6
7-3-6
14-0-7
6-9-1
20-9-8
6-9-1
27-6-9
6-9-1
34-3-10
6-9-1
41-7-0
7-3-6
-0-10-8
0-10-8
7-3-6
7-3-6
14-0-7
6-9-1
20-9-8
6-9-1
27-6-9
6-9-1
34-3-10
6-9-1
41-7-0
7-3-6
0-4-4
10-9-0
0-4-4
6.0012
PlateOffsets(X,Y)-- [2:0-8-0,0-0-9], [10:0-8-0,0-0-9]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.82
0.83
0.63
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.21
-0.56
0.22
(loc)
14
12-14
10
l/defl
>999
>893
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 178 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
WEBS 2x4 HF/SPF No.2 *Except*
W3,W1: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 8-4-13 oc bracing.
WEBS 1 Row at midpt 7-14, 5-14
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. (lb/size)2=1517/0-5-8(min. 0-2-13), 10=1472/Mechanical
Max Horz2=199(LC 20)
Max Uplift2=-257(LC 16), 10=-237(LC 17)
MaxGrav2=1716(LC 2), 10=1663(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-24=-3074/373, 3-24=-2979/405, 3-4=-2524/346, 4-5=-2361/379, 5-25=-1930/346,
25-26=-1831/362, 6-26=-1829/378, 6-27=-1829/380, 27-28=-1831/363, 7-28=-1930/347,
7-8=-2361/382, 8-9=-2524/349, 9-29=-2982/408, 10-29=-3076/385
BOT CHORD 2-17=-450/2665, 16-17=-450/2665, 15-16=-278/2180, 14-15=-278/2180, 13-14=-142/2180,
12-13=-142/2180, 11-12=-270/2667, 10-11=-270/2667
WEBS 6-14=-164/1270, 7-14=-795/279, 7-12=-13/474, 9-12=-562/199, 9-11=0/260,
5-14=-795/278, 5-16=-13/474, 3-16=-560/196, 3-17=0/259
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-8 to 2-1-8,Interior(1) 2-1-8 to 20-9-8,Exterior(2) 20-9-8 to 23-9-8
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7) Refer to girder(s) for truss to trussconnections.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
2=257, 10=237.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
3x4
3x4
1.5x4
3x4
3x4
3x4
1.5x4 3x6
3x8
7-3-6
7-3-6
14-0-7
6-9-1
20-9-8
6-9-1
27-6-9
6-9-1
34-3-10
6-9-1
41-7-0
7-3-6
-0-10-8
0-10-8
7-3-6
7-3-6
14-0-7
6-9-1
20-9-8
6-9-1
27-6-9
6-9-1
34-3-10
6-9-1
41-7-0
7-3-6
42-5-8
0-10-8
0-4-4
10-9-0
0-4-4
6.0012
PlateOffsets(X,Y)-- [2:0-8-0,0-0-9], [10:0-8-0,0-0-9]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.82
0.83
0.62
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.21
-0.56
0.22
(loc)
15
15-17
10
l/defl
>999
>894
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 180 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
WEBS 2x4 HF/SPF No.2 *Except*
W3,W1: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 8-5-11 oc bracing.
WEBS 1 Row at midpt 7-15, 5-15
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. (lb/size)2=1517/0-5-8(min. 0-2-13), 10=1517/0-5-8(min. 0-2-13)
Max Horz2=191(LC 20)
Max Uplift2=-257(LC 16), 10=-257(LC 17)
MaxGrav2=1716(LC 2), 10=1716(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-25=-3073/373, 3-25=-2979/405, 3-4=-2523/346, 4-5=-2360/379, 5-26=-1929/346,
26-27=-1830/361, 6-27=-1828/378, 6-28=-1828/378, 28-29=-1830/361, 7-29=-1929/346,
7-8=-2360/379, 8-9=-2523/346, 9-30=-2979/407, 10-30=-3073/375
BOT CHORD 2-18=-443/2664, 17-18=-443/2664, 16-17=-270/2179, 15-16=-270/2179, 14-15=-131/2179,
13-14=-131/2179, 12-13=-254/2664, 10-12=-254/2664
WEBS 6-15=-163/1269, 7-15=-795/278, 7-13=-13/474, 9-13=-560/198, 9-12=0/259,
5-15=-795/278, 5-17=-13/474, 3-17=-560/196, 3-18=0/259
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-8 to 2-1-8,Interior(1) 2-1-8 to 20-9-8,Exterior(2) 20-9-8 to 23-9-8
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
2=257, 10=257.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
3132
33
34
35
3x6
5x6
3x8
4x6 2x4
2x4
6x8
5x12MT18H
3x4
1.5x4 3x4
3x4
5x8
6x8
4x4
3x4
4x4
4x8
3x10
2x4
13-4-0
7-3-6
7-3-6
14-0-7
6-9-1
20-9-8
6-9-1
25-5-8
4-8-0
29-10-14
4-5-6
34-4-5
4-5-6
38-9-11
4-5-6
41-7-0
2-9-5
-0-10-8
0-10-8
7-3-6
7-3-6
14-0-7
6-9-1
20-9-8
6-9-1
25-5-8
4-8-0
29-10-14
4-5-6
34-4-5
4-5-6
38-9-11
4-5-6
41-7-0
2-9-5
42-5-8
0-10-8
0-4-4
10-9-0
0-4-4
0-8-0
6.0012
3.4512
PlateOffsets(X,Y)-- [2:0-8-0,0-0-9], [8:0-2-0,0-3-4], [8:0-0-0,0-1-12], [12:0-0-11,Edge], [14:0-6-0,0-1-8], [17:0-2-12,0-3-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.42
0.83
0.81
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.21
-0.54
0.26
(loc)
16-17
16-17
12
l/defl
>999
>929
n/a
L/d
240
180
n/a
PLATES
MT20
MT18H
Weight: 226 lb FT= 20%
GRIP
185/144
197/144
LUMBER-
TOP CHORD2x4SPF 2100F 1.8E*Except*
T3: 2x4SP 2400F 2.0E
BOT CHORD2x4SPF 2100F 1.8E*Except*
B3: 2x4 HF/SPF No.2, B4: 2x6SP 2400F 2.0E
B5: 2x4SP 2400F 2.0E,F1: 2x6SPF No.2
WEBS 2x4SPFStud*Except*
W2,W4,W5,W6: 2x4 HF/SPF No.2, W13: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-2-2 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 5-19
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. (lb/size)2=1524/0-5-8(min. 0-2-3), 12=1509/0-5-8(min. 0-1-8)
Max Horz2=-191(LC 17)
Max Uplift2=-257(LC 16), 12=-254(LC 17)
MaxGrav2=1725(LC 2), 12=1707(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-30=-3093/387, 3-30=-2999/409, 3-4=-2544/371, 4-5=-2381/404, 5-31=-1955/370,
31-32=-1885/380, 6-32=-1854/403, 6-33=-2491/508, 7-33=-2503/483, 7-34=-2391/425,
8-34=-2506/424, 8-9=-2512/401, 9-10=-3101/445, 10-35=-3871/514, 11-35=-3885/493,
11-12=-5523/761
BOT CHORD 2-22=-446/2682, 21-22=-446/2682, 20-21=-446/2682, 19-20=-272/2199, 7-17=-333/187,
16-17=-206/2712, 15-16=-339/3462, 14-15=-652/5186, 12-14=-642/4955
WEBS 3-22=0/258, 3-20=-562/198, 5-20=-12/477, 5-19=-795/277, 6-19=-118/521,
17-19=-68/1427, 6-17=-307/1258, 9-17=-776/205, 9-16=-53/592, 10-16=-897/214,
10-15=-10/491, 11-15=-1734/315, 11-14=-79/1055
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-8 to 3-3-6,Interior(1) 3-3-6 to 20-9-8,Exterior(2) 20-9-8 to 24-11-6
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)All plates areMT20 plates unless otherwiseindicated.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Bearing at joint(s) 12 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
2=257, 12=254.
Continued on page 2
15 14 13
29
3031
32
33
3x6
5x6
3x8
4x6 2x4
2x4
6x8
5x12MT18H
3x4
1.5x4 3x4
3x4
5x8
6x8
4x4
3x4
4x4
4x8
3x10
2x4
13-4-0
7-3-6
7-3-6
14-0-7
6-9-1
20-9-8
6-9-1
25-5-8
4-8-0
29-10-14
4-5-6
34-4-5
4-5-6
38-9-11
4-5-6
41-7-0
2-9-5
7-3-6
7-3-6
14-0-7
6-9-1
20-9-8
6-9-1
25-5-8
4-8-0
29-10-14
4-5-6
34-4-5
4-5-6
38-9-11
4-5-6
41-7-0
2-9-5
42-5-8
0-10-8
0-4-4
10-9-0
0-4-4
0-8-0
6.0012
3.4512
PlateOffsets(X,Y)-- [1:0-4-13,0-1-8], [7:0-2-0,0-3-4], [7:0-0-0,0-1-12], [11:0-0-11,Edge], [13:0-6-0,0-1-8], [16:0-2-12,0-3-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.42
0.83
0.81
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.21
-0.54
0.26
(loc)
15-16
15-16
11
l/defl
>999
>929
n/a
L/d
240
180
n/a
PLATES
MT20
MT18H
Weight: 224 lb FT= 20%
GRIP
185/144
197/144
LUMBER-
TOP CHORD2x4SPF 2100F 1.8E*Except*
T3: 2x4SP 2400F 2.0E
BOT CHORD2x4SPF 2100F 1.8E*Except*
B3: 2x4 HF/SPF No.2, B4: 2x6SP 2400F 2.0E
B5: 2x4SP 2400F 2.0E,F1: 2x6SPF No.2
WEBS 2x4SPFStud*Except*
W2,W4,W5,W6: 2x4 HF/SPF No.2, W13: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-2-2 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 4-18
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. (lb/size)1=1480/Mechanical, 11=1509/0-5-8(min. 0-1-8)
Max Horz1=-199(LC 17)
Max Uplift1=-237(LC 16), 11=-254(LC 17)
MaxGrav1=1672(LC 2), 11=1707(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-29=-3097/398, 2-29=-3000/417, 2-3=-2546/377, 3-4=-2383/409, 4-30=-1955/373,
30-31=-1886/383, 5-31=-1854/405, 5-32=-2492/511, 6-32=-2504/486, 6-7=-2507/425,
7-8=-2513/401, 8-9=-3102/445, 9-33=-3872/514, 10-33=-3886/493, 10-11=-5525/761
BOT CHORD 1-21=-447/2686, 20-21=-447/2686, 19-20=-447/2686, 18-19=-272/2200, 6-16=-320/187,
15-16=-209/2713, 14-15=-339/3463, 13-14=-652/5188, 11-13=-642/4956
WEBS 2-21=0/259, 2-19=-565/199, 4-19=-13/478, 4-18=-796/278, 5-18=-118/521,
16-18=-68/1428, 5-16=-307/1258, 8-16=-776/205, 8-15=-53/592, 9-15=-897/214,
9-14=-10/491, 10-14=-1734/315, 10-13=-79/1056
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 4-1-14,Interior(1) 4-1-14 to 20-9-8,Exterior(2) 20-9-8 to 24-11-6
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)All plates areMT20 plates unless otherwiseindicated.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8) Refer to girder(s) for truss to trussconnections.
9)Bearing at joint(s) 11 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
1=237, 11=254.
Continued on page 2
14
15
16
17
18
19
20
21
22
23
24
45 44 43 42 41 40 39
38
37 36 35 34 33
32
31 30 29 28 27 26 25
46
47 48
49
50
3x6
5x6
3x6
3x5
3x6 3x6
3x5
41-7-0
41-7-0
20-9-8
20-9-8
41-7-0
20-9-8
42-5-8
0-10-8
0-4-4
10-9-0
0-4-4
6.0012
PlateOffsets(X,Y)-- [4:0-1-14,Edge], [20:0-1-14,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.09
0.08
0.13
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
0.00
0.01
(loc)
23
24
23
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 224 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
OTHERS 2x4SPFStud*Except*
ST10,ST9,ST8,ST7: 2x4 HF/SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 12-35, 11-36, 10-37, 13-34, 14-33
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. All bearings 41-7-0.
(lb)-Max Horz1=-198(LC 21)
Max UpliftAll uplift 100 lb orless at joint(s) 1, 36, 37, 39, 40, 41, 42, 43, 44, 45, 34, 33, 31, 30, 29, 28,
27, 26, 25
MaxGravAllreactions 250 lb orless at joint(s) 1, 35, 36, 37, 39, 40, 41, 42, 43, 44, 45, 34, 33, 31, 30,
29, 28, 27, 26, 25, 23
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 9-46=-92/255, 10-46=-76/265, 10-47=-111/313, 11-47=-101/318, 11-12=-127/362,
12-13=-127/364, 13-48=-101/320, 14-48=-111/315, 14-49=-76/267, 15-49=-92/257
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-C Corner(3) 0-0-0 to 2-9-8,Exterior(2) 2-9-8 to 20-9-8, Corner(3) 20-9-8 to 23-9-8zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry
GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.
4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
5) Unbalancedsnowloads have been considered for this design.
6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
7)All plates are 1.5x4MT20 unless otherwiseindicated.
8)Gablerequirescontinuous bottomchord bearing.
9)Gablestudsspaced at 2-0-0 oc.
10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 36, 37, 39, 40,
41, 42, 43, 44, 45, 34, 33, 31, 30, 29, 28, 27, 26, 25.
12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S) Standard
3x6 3x8
3x4
3x4
3x4
1.5x4
3x4
3x4
3x4
1.5x4 3x6
3x8
7-3-6
7-3-6
14-0-7
6-9-1
20-9-8
6-9-1
27-6-9
6-9-1
34-3-10
6-9-1
41-7-0
7-3-6
7-3-6
7-3-6
14-0-7
6-9-1
20-9-8
6-9-1
27-6-9
6-9-1
34-3-10
6-9-1
41-7-0
7-3-6
42-5-8
0-10-8
0-4-4
10-9-0
0-4-4
6.0012
PlateOffsets(X,Y)-- [1:0-8-0,0-0-9], [9:0-8-0,0-0-9]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.82
0.83
0.63
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.21
-0.56
0.22
(loc)
14
14-16
9
l/defl
>999
>893
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 178 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
WEBS 2x4 HF/SPF No.2 *Except*
W3,W1: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 8-5-7 oc bracing.
WEBS 1 Row at midpt 6-14, 4-14
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. (lb/size)1=1472/Mechanical, 9=1517/0-5-8(min. 0-2-13)
Max Horz1=-199(LC 17)
Max Uplift1=-237(LC 16), 9=-257(LC 17)
MaxGrav1=1663(LC 2), 9=1716(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-24=-3076/383, 2-24=-2982/406, 2-3=-2524/349, 3-4=-2361/382, 4-25=-1930/347,
25-26=-1831/363, 5-26=-1829/380, 5-27=-1829/378, 27-28=-1831/362, 6-28=-1930/346,
6-7=-2361/379, 7-8=-2524/346, 8-29=-2979/407, 9-29=-3074/375
BOT CHORD 1-17=-444/2667, 16-17=-444/2667, 15-16=-271/2180, 14-15=-271/2180, 13-14=-132/2180,
12-13=-132/2180, 11-12=-254/2665, 9-11=-254/2665
WEBS 5-14=-164/1270, 6-14=-795/278, 6-12=-13/474, 8-12=-560/198, 8-11=0/259,
4-14=-795/278, 4-16=-13/474, 2-16=-562/197, 2-17=0/260
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 20-9-8,Exterior(2) 20-9-8 to 23-9-8zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7) Refer to girder(s) for truss to trussconnections.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
1=237, 9=257.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
9-6-8
3-1-0
12-11-0
3-4-8
3-4-8
3-4-8
6-5-8
3-1-0
9-6-8
3-1-0
12-11-0
3-4-8
14-1-8
1-2-8
1-2-10
7-8-2
1-2-10
12.0012
PlateOffsets(X,Y)-- [8:0-3-0,0-4-4], [9:0-4-0,0-4-8], [10:0-3-0,0-4-4]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.29
0.27
0.62
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.04
-0.09
0.01
(loc)
9-10
9-10
7
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 183 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x6SP 2400F 2.0E
WEBS 2x4SPFStud*Except*
W5: 2x4 HF/SPF No.2, W1: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-5-11 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
REACTIONS. (lb/size)11=5183/0-5-8(min. 0-2-7), 7=4525/0-5-8(min. 0-2-2)
Max Horz11=-226(LC 10)
Max Uplift11=-865(LC 13), 7=-761(LC 13)
MaxGrav11=5865(LC 2), 7=5124(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-2=-4729/736, 2-12=-3603/631, 3-12=-3498/645, 3-13=-3495/645, 4-13=-3600/631,
4-5=-4684/734, 1-11=-4264/646, 5-7=-4348/665
BOT CHORD 11-14=-269/634, 14-15=-269/634, 10-15=-269/634, 10-16=-523/3285, 9-16=-523/3285,
9-17=-425/3243, 17-18=-425/3243, 8-18=-425/3243, 8-19=-76/508, 7-19=-76/508
WEBS 3-9=-815/4804, 4-9=-1220/317, 4-8=-255/1614, 2-9=-1291/328, 2-10=-260/1685,
1-10=-384/2808, 5-8=-386/2873
NOTES-
1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows:
Topchordsconnected as follows: 2x4- 1 row at 0-9-0 oc, 2x6- 2 rowsstaggered at 0-9-0 oc.
Bottomchordsconnected as follows: 2x6- 2 rowsstaggered at 0-6-0 oc.
Websconnected as follows: 2x4- 1 row at 0-9-0 oc.
2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to
plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated.
3) Unbalancedroofliveloads have been considered for this design.
4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate
grip DOL=1.60
5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
6) Unbalancedsnowloads have been considered for this design.
7)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
11=865, 7=761.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
Continued on page 2
6-5-8
14-1-8
1-2-8
1-2-10
7-8-2
1-2-10
12.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-R
0.16
0.09
0.35
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.01
-0.02
0.00
(loc)
11
11
12
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 72 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
WEBS 2x4SPFStud
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. All bearings 12-11-0.
(lb)-Max Horz18=-239(LC 14)
Max UpliftAll uplift 100 lb orless at joint(s) 12, 16, 14 except 18=-113(LC 12), 17=-188(LC 16), 13=-185(LC
17)
MaxGravAllreactions 250 lb orless at joint(s) 18, 12, 16, 17, 14, 13 except 15=291(LC 17)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 5-19=-243/269, 6-19=-229/280, 6-20=-229/279, 7-20=-243/268
WEBS 6-15=-322/217
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-C Corner(3)-1-2-8 to 1-9-8,Exterior(2) 1-9-8 to 6-5-8, Corner(3) 6-5-8 to 9-5-8zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry
GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.
4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
5) Unbalancedsnowloads have been considered for this design.
6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
7)All plates are 1.5x4MT20 unless otherwiseindicated.
8)Gablerequirescontinuous bottomchord bearing.
9)Truss to be fullysheathed from one face orsecurely braced againstlateralmovement(i.e. diagonalweb).
10)Gablestudsspaced at 2-0-0 oc.
11)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
12)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 12, 16, 14
except(jt=lb) 18=113, 17=188, 13=185.
13)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S) Standard
12-11-0
3-4-8
-1-2-8
1-2-8
3-4-8
3-4-8
6-5-8
3-1-0
9-6-8
3-1-0
12-11-0
3-4-8
1-2-10
7-8-2
1-2-10
12.0012
PlateOffsets(X,Y)-- [7:Edge,0-2-0], [8:0-3-0,0-4-4], [9:0-4-0,0-4-8], [10:0-3-0,0-4-4]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.29
0.26
0.62
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.04
-0.09
0.01
(loc)
8-9
8-9
7
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 183 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x6SP 2400F 2.0E
WEBS 2x4SPFStud*Except*
W5: 2x4 HF/SPF No.2, W1: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-5-11 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
REACTIONS. (lb/size)11=4598/0-5-8(min. 0-2-2), 7=5071/0-5-8(min. 0-2-6)
Max Horz11=226(LC 35)
Max Uplift11=-775(LC 12), 7=-849(LC 12)
MaxGrav11=5207(LC 2), 7=5738(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-3=-4691/737, 3-12=-3592/632, 4-12=-3487/646, 4-13=-3490/646, 5-13=-3595/632,
5-6=-4724/737, 2-11=-4349/668, 6-7=-4259/648
BOT CHORD 11-14=-274/550, 10-14=-274/550, 10-15=-535/3248, 15-16=-535/3248, 9-16=-535/3248,
9-17=-455/3281, 8-17=-455/3281, 8-18=-115/611, 18-19=-115/611, 7-19=-115/611
WEBS 4-9=-816/4793, 5-9=-1293/330, 5-8=-263/1688, 3-9=-1239/320, 3-10=-259/1640,
2-10=-381/2859, 6-8=-388/2805
NOTES-
1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows:
Topchordsconnected as follows: 2x4- 1 row at 0-9-0 oc, 2x6- 2 rowsstaggered at 0-9-0 oc.
Bottomchordsconnected as follows: 2x6- 2 rowsstaggered at 0-6-0 oc.
Websconnected as follows: 2x4- 1 row at 0-9-0 oc.
2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to
plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated.
3) Unbalancedroofliveloads have been considered for this design.
4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate
grip DOL=1.60
5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
6) Unbalancedsnowloads have been considered for this design.
7)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
11=775, 7=849.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
Continued on page 2
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.03
0.07
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
0.00
0.00
(loc)
4
4
4
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 9 lb FT= 20%
GRIP
185/148
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-10-4 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. (lb/size)2=114/2-8-10(min. 0-1-8), 4=114/2-8-10(min. 0-1-8)
Max Horz2=-45(LC 14)
Max Uplift2=-19(LC 16), 4=-19(LC 17)
MaxGrav2=130(LC 2), 4=130(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Gablerequirescontinuous bottomchord bearing.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 4.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
10)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building
designer.
LOADCASE(S) Standard
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MR
0.08
0.05
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
-0.00
-0.00
(loc)
5
5
4
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 8 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 1-8-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. (lb/size)5=92/0-5-8(min. 0-1-8), 4=40/0-1-8(min. 0-1-8)
Max Horz5=89(LC 13)
Max Uplift5=-15(LC 12), 4=-57(LC 13)
MaxGrav5=118(LC 31), 4=74(LC 30)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Bearing at joint(s) 4 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
7)Providemechanicalconnection(by others) of truss to bearing plate at joint(s) 4.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 5, 4.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S) Standard
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MR
0.48
0.34
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.16
-0.18
0.00
(loc)
4-5
4-5
4
l/defl
>466
>424
n/a
L/d
240
180
n/a
PLATES
MT20
MT18H
Weight: 22 lb FT= 20%
GRIP
185/144
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. (lb/size)5=281/1-0-12(min. 0-1-8), 4=221/0-1-8(min. 0-1-8)
Max Horz5=138(LC 16)
Max Uplift5=-32(LC 16), 4=-99(LC 16)
MaxGrav5=321(LC 2), 4=250(LC 2)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-5=-273/152
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-8 to 2-1-8,Interior(1) 2-1-8 to 6-6-2zone;cantileverleft exposed ;
endverticalleft exposed; porchleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)All plates areMT20 plates unless otherwiseindicated.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Bearing at joint(s) 4 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
8)Providemechanicalconnection(by others) of truss to bearing plate at joint(s) 4.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 5, 4.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S) Standard
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-R
0.20
0.10
0.07
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
-0.00
-0.00
(loc)
1
1
6
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 19 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x4 HF/SPF No.2
BOT CHORD2x4 HF/SPF No.2
WEBS 2x4SPFStud
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-7-14 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. All bearings 4-7-14.
(lb)-Max Horz9=97(LC 16)
Max UpliftAll uplift 100 lb orless at joint(s) 6, 7 except 8=-159(LC 16)
MaxGravAllreactions 250 lb orless at joint(s) 9, 6, 7, 8
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-C Corner(3)-0-10-8 to 2-1-8,Exterior(2) 2-1-8 to 4-6-2zone;cantileverleft exposed ;
endverticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry
GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Gablerequirescontinuous bottomchord bearing.
7)Truss to be fullysheathed from one face orsecurely braced againstlateralmovement(i.e. diagonalweb).
8)Gablestudsspaced at 2-0-0 oc.
9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 6, 7 except
(jt=lb) 8=159.
11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S) Standard
30
31
32
33 34
35
36
37
38
5x8 5x6
4x6
3x4 4x6
2x4
4x8 1.5x4
1.5x4
2x4
2x4
2x4
4x8
5x12
4x6
4x4
4x4
4x8
2x4 4x4
4x4
1.5x4 4x4
1.5x4
1.5x4 1.5x4
1.5x4
9-3-0
8-1-14
6-10-4
6-10-4
9-3-12
2-5-8
9-8-6
0-4-10
11-7-8
1-11-2
13-6-10
1-11-2
13-11-4
0-4-10
16-4-12
2-5-8
22-8-0
6-3-4
-1-2-8
1-2-8
6-10-4
6-10-4
8-2-0
1-3-12
8-9-12
0-7-12
9-8-6
0-10-10
13-6-10
3-10-4
14-5-4
0-10-10
15-1-0
0-7-12
16-4-12
1-3-12
22-8-0
6-3-4
1-3-10
11-0-0
1-10-10
1-2-0
11-0-0
12.0012
PlateOffsets(X,Y)-- [5:0-6-4,0-1-12], [6:0-4-4,0-1-12], [9:0-0-12,0-2-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.69
0.76
0.36
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
Attic
in
0.15
-0.25
0.03
-0.08
(loc)
21-22
15-18
10
13-20
l/defl
>999
>999
n/a
1417
L/d
240
180
n/a
360
PLATES
MT20
Weight: 177 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x6SPF No.2 *Except*
T2: 2x4 HF/SPF No.2
BOT CHORD2x6SPF No.2 *Except*
B2: 2x4 HF/SPF No.2
WEBS 2x4SPFStud*Except*
W3: 2x4 HF/SPF No.2, W1,W11: 2x8SP 2400F 2.0E
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-3-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.Except:
5-4-0 oc bracing: 13-20
WEBS 1 Row at midpt 4-7
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. (lb/size)22=1019/0-5-8(min. 0-2-5), 10=945/Mechanical
Max Horz22=324(LC 13)
Max Uplift22=-29(LC 16)
MaxGrav22=1466(LC 46), 10=1435(LC 46)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-29=-1551/38, 29-30=-1519/42, 30-31=-1285/64, 31-32=-1282/82, 3-32=-1221/88,
3-4=-861/184, 4-5=-250/253, 5-33=-112/548, 33-34=-112/548, 6-34=-112/548,
6-7=-237/277, 7-8=-881/187, 8-35=-1216/87, 35-36=-1251/75, 36-37=-1286/61,
37-38=-1487/61, 9-38=-1502/36, 2-22=-1391/163, 9-10=-1422/88
BOT CHORD 21-22=-435/891, 19-21=-42/2051, 17-19=0/2145, 16-17=0/2145, 12-16=0/2145,
11-12=0/1722, 15-18=-1083/28, 14-15=-980/120, 13-14=-87/259
WEBS 20-21=0/457, 3-20=0/568, 4-23=-1378/280, 23-24=-1371/280, 7-24=-1438/292,
11-13=0/448, 8-13=0/518, 2-21=-181/650, 9-11=-90/870, 18-21=-1088/0,
15-19=-497/166, 12-15=-637/145, 11-14=-1157/0
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-2-8 to 1-9-8,Interior(1) 1-9-8 to 9-8-6,Exterior(2) 9-8-6 to 13-6-10,
Interior(1) 17-9-9 to 22-4-6zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &
MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8) Ceiling dead load(5.0 psf) on member(s). 3-4, 7-8, 4-23, 23-24, 7-24
9)Bottomchordliveload(40.0 psf) and additional bottomchord dead load(0.0 psf) applied only to room. 18-20, 15-18, 14-15, 13-14
Continued 10) Refer on to girder(page 2 s) for truss to trussconnections.
W4
1
2
3
4
5 6
7
8
9
10
23 22 20
18 17 15 12
11
21 19 16 14 13
26
27
24 25
55
56
57 58
59
60
5x8 5x6
3x4 4x6
2x4
4x8
2x4
2x4
2x4
4x8
5x12
3x4
5x12
4x8
4x4 2x4
4x4
5x6
4x4
4x4
2x4
2x4
2x4
2x4
2x4
2x4
6-10-4
6-10-4
9-3-12
2-5-8
9-7-8
0-3-12
9-8-6
0-0-14
11-7-8
1-11-2
13-6-10
1-11-2
13-7-8
0-0-14
13-11-4
0-3-12
16-4-12
2-5-8
23-3-0
6-10-4
-1-2-8
1-2-8
6-10-4
6-10-4
8-2-0
1-3-12
8-9-12
0-7-12
9-8-6
0-10-10
13-6-10
3-10-4
14-5-4
0-10-10
15-1-0
0-7-12
16-4-12
1-3-12
23-3-0
6-10-4
24-5-8
1-2-8
1-3-10
11-0-0
1-3-10
1-2-0
11-0-0
12.0012
PlateOffsets(X,Y)-- [5:0-6-4,0-1-12], [6:0-4-4,0-1-12], [16:0-1-8,0-0-12]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.70
0.72
0.43
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
Attic
in
-0.13
-0.26
0.03
-0.06
(loc)
16
16
11
13-21
l/defl
>999
>999
n/a
1894
L/d
240
180
n/a
360
PLATES
MT20
Weight: 251 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x6SPF No.2 *Except*
T2: 2x4 HF/SPF No.2
BOT CHORD2x6SPF No.2 *Except*
B2: 2x4 HF/SPF No.2
WEBS 2x4SPFStud*Except*
W9,W1: 2x4 HF/SPF No.2, W7: 2x8SP 2400F 2.0E
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-3-3 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.Except:
5-6-0 oc bracing: 13-21
WEBS 1 Row at midpt 4-7
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. (lb/size)23=1041/0-5-8(min. 0-2-6), 11=1041/0-7-0(min. 0-2-6)
Max Horz23=330(LC 15)
Max Uplift23=-28(LC 16), 11=-28(LC 17)
MaxGrav23=1502(LC 46), 11=1502(LC 46)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-55=-1603/67, 55-56=-1344/94, 3-56=-1300/111, 3-4=-1083/262, 4-5=-251/328,
5-57=-73/508, 57-58=-73/508, 6-58=-73/508, 6-7=-229/306, 7-8=-905/212,
8-59=-1294/108, 59-60=-1333/91, 9-60=-1597/63, 2-23=-1446/191, 9-11=-1438/188
BOT CHORD 22-23=-387/852, 20-22=-35/2046, 18-20=0/2242, 17-18=0/2242, 15-17=0/2242,
12-15=0/1820, 11-12=-242/642, 16-19=-1026/66, 14-16=-1013/0
WEBS 21-22=0/479, 21-26=0/589, 3-26=-95/626, 4-27=-1485/359, 24-27=-1513/341,
24-25=-1510/343, 7-25=-1436/347, 12-13=0/471, 8-13=0/580, 2-22=-125/680,
9-12=-160/688, 15-16=-502/116, 12-14=-1071/0, 16-20=-522/117, 19-22=-1045/0,
26-27=-238/278
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-C Corner(3)-1-2-8 to 1-9-8,Exterior(2) 1-9-8 to 9-8-6, Corner(3) 9-8-6 to 16-4-15,
Exterior(2) 16-4-15 to 24-5-8zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces
&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry
GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.
4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
5) Unbalancedsnowloads have been considered for this design.
6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
7)Provide adequate drainage to preventwater ponding.
8)All plates are 1.5x4MT20 unless otherwiseindicated.
Continued 9)Vertical on gablestudsspaced page 2 at 2-0-0 oc and horizontal gablestudsspaced at 4-0-0 oc.
27
24 25
30
31
32
33
34 35
36
37
38
39
5x8 5x6
3x4 4x6
2x4
4x8 1.5x4
1.5x4
2x4
2x4
2x4
4x8
5x12
3x4
5x12
4x8
2x4
4x4
4x4
5x6
4x4
1.5x4 4x4
1.5x4
1.5x4 1.5x4
1.5x4
9-3-0
8-1-14
6-10-4
6-10-4
9-3-12
2-5-8
9-8-6
0-4-10
11-7-8
1-11-2
13-6-10
1-11-2
13-11-4
0-4-10
16-4-12
2-5-8
23-3-0
6-10-4
-1-2-8
1-2-8
6-10-4
6-10-4
8-2-0
1-3-12
8-9-12
0-7-12
9-8-6
0-10-10
13-6-10
3-10-4
14-5-4
0-10-10
15-1-0
0-7-12
16-4-12
1-3-12
23-3-0
6-10-4
24-5-8
1-2-8
1-3-10
11-0-0
1-3-10
1-2-0
11-0-0
12.0012
PlateOffsets(X,Y)-- [5:0-6-4,0-1-12], [6:0-4-4,0-1-12]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.70
0.72
0.43
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
Attic
in
-0.13
-0.26
0.03
-0.06
(loc)
16
16
11
13-21
l/defl
>999
>999
n/a
1894
L/d
240
180
n/a
360
PLATES
MT20
Weight: 182 lb FT= 20%
GRIP
185/144
LUMBER-
TOP CHORD2x6SPF No.2 *Except*
T2: 2x4 HF/SPF No.2
BOT CHORD2x6SPF No.2 *Except*
B2: 2x4 HF/SPF No.2
WEBS 2x4SPFStud*Except*
W3: 2x4 HF/SPF No.2, W1: 2x8SP 2400F 2.0E
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-3-3 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.Except:
5-6-0 oc bracing: 13-21
WEBS 1 Row at midpt 4-7
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS. (lb/size)23=1041/0-5-8(min. 0-2-6), 11=1041/0-7-0(min. 0-2-6)
Max Horz23=330(LC 15)
Max Uplift23=-28(LC 16), 11=-28(LC 17)
MaxGrav23=1502(LC 46), 11=1502(LC 46)
FORCES. (lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-30=-1603/38, 30-31=-1571/42, 31-32=-1344/64, 32-33=-1334/76, 3-33=-1300/88,
3-4=-1083/262, 4-5=-251/328, 5-34=-73/508, 34-35=-73/508, 6-35=-73/508,
6-7=-229/306, 7-8=-905/184, 8-36=-1294/86, 36-37=-1328/74, 37-38=-1333/62,
38-39=-1564/40, 9-39=-1597/36, 2-23=-1446/163, 9-11=-1438/161
BOT CHORD 22-23=-387/852, 20-22=-35/2046, 18-20=0/2242, 17-18=0/2242, 15-17=0/2242,
12-15=0/1820, 11-12=-242/642, 16-19=-1026/66, 14-16=-1013/0
WEBS 21-22=0/479, 21-26=0/589, 3-26=-95/626, 4-27=-1485/274, 24-27=-1513/334,
24-25=-1510/343, 7-25=-1436/266, 12-13=0/471, 8-13=0/580, 2-22=-125/680,
9-12=-160/688, 15-16=-502/116, 12-14=-1071/0, 16-20=-522/117, 19-22=-1045/0,
26-27=-238/278
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-1-2-8 to 1-9-8,Interior(1) 1-9-8 to 9-8-6,Exterior(2) 9-8-6 to 13-6-10,
Interior(1) 17-9-9 to 24-5-8zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &
MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8) Ceiling dead load(5.0 psf) on member(s). 3-4, 7-8, 4-27, 24-27, 24-25, 7-25
Continued 9)Bottomchordliveload(on page 2 40.0 psf) and additional bottomchord dead load(0.0 psf) applied only to room. 19-21, 16-19, 14-16, 13-14