Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
I35670496.114_Woods_at_Shelborne
16023 Swingley Ridge Rd Chesterfield, MO 63017 314-434-1200 MiTek USA, Inc. Re: The truss drawing(s) referenced below have been prepared by MiTek USA, Inc. under my direct supervision based on the parameters provided by ProBuild (CarterLee Bldg Components). December 26,2018 Vance, Jeff Pages or sheets covered by this seal: I35670496 thru I35670544 My license renewal date for the state of Indiana is July 31, 2020. 114_Woods_at_Shelborne Truss Engineer's responsibility is solely for design of individual trusses based upon design parameters shown on referenced truss drawings. Parameters have not been verified as appropriate for any use. Any location identification specified is for file reference only and has not been used in preparing design. Suitability of truss designs for any particular building is the responsibility of the building designer, not the Truss Engineer, per ANSI/TPI-1, Chapter 2. IMPORTANT NOTE: 114 Woods at Shelborne 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss GE01 Truss Type GABLE Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670496 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:05 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-nlJFpSs06cXcKI0q5jnfGy4zuN0eWcckj4KLimy56ye Scale = 1:26.0 Sheet Front Full Sheathing 1 Ply 7/16OSB8 1 2 3 4 5 6 7 8 9 16 15 14 13 12 11 10 3x6 4x6 3x6 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 14-2-814-2-8 -1-0-0 1-0-0 7-1-4 7-1-4 14-2-8 7-1-4 15-2-8 1-0-0 0-9-03-1-70-9-04.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.09 0.06 0.03 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 0.00 (loc) 9 9 10 l/defl n/r n/r n/a L/d 180 120 n/a PLATES MT20 Weight: 98 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 14-2-8. (lb) - Max Horz 16=-32(LC 7) Max Uplift All uplift 100 lb or less at joint(s) 16, 10, 14, 15, 12, 11 Max Grav All reactions 250 lb or less at joint(s) 16, 10, 13, 14, 15, 12, 11 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(9-10) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Gable requires continuous bottom chord bearing. 5) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 6) Gable studs spaced at 2-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 16, 10, 14, 15, 12, 11. 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss GE02 Truss Type GABLE Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670497 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:06 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-Fxse1otetwfTxSb0fRIupAd8enMAF3yuyk3uFCy56yd Scale = 1:13.2 Sheet Front Full Sheathing 1 Ply 7/16OSB8 1 2 3 4 7 6 5 3x6 2x4 2x4 2x4 2x4 -1-0-0 1-0-0 4-0-0 4-0-0 0-9-02-1-04.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.09 0.04 0.02 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 -0.00 0.00 (loc) 1 1 5 l/defl n/r n/r n/a L/d 180 120 n/a PLATES MT20 Weight: 24 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud *Except* 4-5: 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)7=173/4-0-0, 5=23/4-0-0, 6=173/4-0-0 Max Horz 7=63(LC 5) Max Uplift 7=-42(LC 4), 5=-2(LC 5), 6=-23(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 3) Gable requires continuous bottom chord bearing. 4) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 5) Gable studs spaced at 1-4-0 oc. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 7, 5, 6. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss GE03 Truss Type GABLE Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670498 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:07 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-j8Q0E8uHdDnKZbACC8p7LN9ImBhg_W_1BOpRnfy56yc Scale = 1:14.8 Sheet Front Full Sheathing 1 Ply 7/16OSB8 1 2 3 4 7 6 5 3x6 2x4 2x4 2x4 2x4 -1-0-0 1-0-0 5-0-0 5-0-0 0-9-02-5-04.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.13 0.09 0.04 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.01 0.00 (loc) 1 1 5 l/defl n/r n/r n/a L/d 180 120 n/a PLATES MT20 Weight: 32 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud *Except* 4-5: 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)7=199/5-0-0, 5=-12/5-0-0, 6=262/5-0-0 Max Horz 7=74(LC 5) Max Uplift 7=-41(LC 4), 5=-14(LC 2), 6=-36(LC 6) Max Grav 7=199(LC 1), 5=7(LC 6), 6=262(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 3) Gable requires continuous bottom chord bearing. 4) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 5) Gable studs spaced at 1-4-0 oc. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 7, 5, 6. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss GE04 Truss Type GABLE Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670499 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:09 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-fWYmfqvX9r12pvKbKZrbRoFeO?N2SN0KeiIYrXy56ya Scale = 1:82.7 Sheet Front Full Sheathing 1 Ply 7/16OSB8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 2223 24 25 26 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 3x4 3x4 3x6 5x6 3x6 3x4 3x4 3x6 3x6 45-11-045-11-0 -1-0-0 1-0-0 22-11-8 22-11-8 45-11-0 22-11-8 0-11-012-4-120-11-06.00 12 Plate Offsets (X,Y)-- [6:0-1-9,Edge], [22:0-1-9,Edge], [27:Edge,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.19 0.10 0.19 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 0.01 (loc) 1 1 27 l/defl n/r n/r n/a L/d 180 120 n/a PLATES MT20 Weight: 848 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud *Except* 26-27: 2x3 SPF No.2 OTHERS 2x3 SPF No.2 *Except* 14-39,13-40,15-38: 2x4 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 14-39, 13-40, 12-41, 11-42, 15-38, 16-37, 17-36 REACTIONS.All bearings 45-11-0. (lb) - Max Horz 51=139(LC 5) Max Uplift All uplift 100 lb or less at joint(s) 51, 40, 41, 42, 44, 45, 46, 47, 48, 49, 50, 38, 37, 36, 34, 33, 32, 31, 30, 29, 28 Max Grav All reactions 250 lb or less at joint(s) 51, 27, 39, 40, 41, 42, 44, 45, 46, 47, 48, 49, 50, 38, 37, 36, 34, 33, 32, 31, 30, 29, 28 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 11-12=-54/263, 12-13=-54/303, 13-14=-54/332, 14-15=-54/332, 15-16=-54/303, 16-17=-54/263 NOTES-(10-11) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) All plates are 2x4 MT20 unless otherwise indicated. 5) Gable requires continuous bottom chord bearing. 6) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 7) Gable studs spaced at 2-0-0 oc. 8) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 51, 40, 41, 42, 44, 45, 46, 47, 48, 49, 50, 38, 37, 36, 34, 33, 32, 31, 30, 29, 28. 10) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 11) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss GE05 Truss Type GABLE Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670500 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:10 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-8j68sAw9w89vQ3vnuGNqz0nqZOkLBtcTtM16O_y56yZ Scale = 1:26.9 Sheet Front Full Sheathing 1 Ply 7/16OSB8 1 2 3 4 5 6 7 8 9 16 15 14 13 12 11 10 2x4 2x4 4x6 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 12-7-012-7-0 -1-0-0 1-0-0 6-3-8 6-3-8 12-7-0 6-3-8 13-7-0 1-0-0 0-11-04-0-120-11-06.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.10 0.03 0.04 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.01 0.00 (loc) 9 9 10 l/defl n/r n/r n/a L/d 180 120 n/a PLATES MT20 Weight: 106 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 12-7-0. (lb) - Max Horz 16=46(LC 5) Max Uplift All uplift 100 lb or less at joint(s) 16, 10, 14, 15, 12, 11 Max Grav All reactions 250 lb or less at joint(s) 16, 10, 13, 14, 15, 12, 11 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(9-10) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Gable requires continuous bottom chord bearing. 5) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 6) Gable studs spaced at 2-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 16, 10, 14, 15, 12, 11. 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss GE06 Truss Type GABLE Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670501 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:11 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-cvgX4WxnhSHl2DT_R_u3WDK?Mo3cwKrd60nfwQy56yY Scale = 1:29.8 Sheet Front Full Sheathing 1 Ply 7/16OSB8 1 2 3 4 5 6 7 8 9 10 11 21 20 19 18 17 16 15 14 13 12 2x4 2x4 4x6 2x4 2x4 3x6 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 16-7-016-7-0 -1-0-0 1-0-0 8-3-8 8-3-8 16-7-0 8-3-8 17-7-0 1-0-0 0-11-74-0-120-11-74.50 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.09 0.03 0.04 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.01 0.00 (loc) 11 11 12 l/defl n/r n/r n/a L/d 180 120 n/a PLATES MT20 Weight: 138 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.All bearings 16-7-0. (lb) - Max Horz 21=40(LC 6) Max Uplift All uplift 100 lb or less at joint(s) 21, 12, 17, 18, 20, 15, 14, 13 Max Grav All reactions 250 lb or less at joint(s) 21, 12, 16, 17, 18, 20, 15, 14, 13 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(9-10) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Gable requires continuous bottom chord bearing. 5) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 6) Gable studs spaced at 2-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 21, 12, 17, 18, 20, 15, 14, 13. 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss GE07 Truss Type GABLE Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670502 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:11 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-cvgX4WxnhSHl2DT_R_u3WDK?yo2rwK2d60nfwQy56yY Scale = 1:16.9 Sheet Front Full Sheathing 1 Ply 7/16OSB8 1 2 3 4 5 9 8 7 6 3x6 2x4 2x4 2x4 2x4 2x4 2x4 -1-0-0 1-0-0 6-0-8 6-0-8 0-9-02-9-34.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.12 0.07 0.03 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.00 (loc) 1 1 6 l/defl n/r n/r n/a L/d 180 120 n/a PLATES MT20 Weight: 41 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud *Except* 5-6: 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 6-0-8. (lb) - Max Horz 9=86(LC 5) Max Uplift All uplift 100 lb or less at joint(s) 9, 6, 7, 8 Max Grav All reactions 250 lb or less at joint(s) 9, 6, 7, 8 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 3) Gable requires continuous bottom chord bearing. 4) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 5) Gable studs spaced at 1-4-0 oc. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 9, 6, 7, 8. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss GE08 Truss Type GABLE Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670503 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:13 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-YIoHVCy1D3XTHXdMZPwXbePLocl2OD?wZKGm_Jy56yW Scale = 1:35.5 Sheet FrontFull Sheathing 1 Ply 7/16OSB8 1 2 3 4 5 6 7 8 9 10 11 12 13 24 23 22 21 20 19 18 17 16 15 14 3x8 4x6 3x8 2x4 2x4 2x4 5x6 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 19-11-019-11-0 -1-0-0 1-0-0 9-11-8 9-11-8 19-11-0 9-11-8 20-11-0 1-0-0 0-10-04-11-130-10-05.00 12 Plate Offsets (X,Y)-- [21:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.10 0.03 0.07 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.01 0.00 (loc) 13 13 14 l/defl n/r n/r n/a L/d 180 120 n/a PLATES MT20 Weight: 185 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.All bearings 19-11-0. (lb) - Max Horz 24=-51(LC 7) Max Uplift All uplift 100 lb or less at joint(s) 24, 14, 20, 21, 22, 23, 18, 17, 16, 15 Max Grav All reactions 250 lb or less at joint(s) 24, 14, 19, 20, 21, 22, 23, 18, 17, 16, 15 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(9-10) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Gable requires continuous bottom chord bearing. 5) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 6) Gable studs spaced at 2-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 24, 14, 20, 21, 22, 23, 18, 17, 16, 15. 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss GE09 Truss Type GABLE Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670504 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:16 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-ysTQ7D?wW_v28_MxEXTEDH1lJpgmbR3MFIUQbdy56yT Scale = 1:54.9 Sheet Front Full Sheathing 1 Ply 7/16OSB8 1 2 3 4 5 6 7 8 9 18 17 16 15 13 12 11 1014 3x6 5x6 3x6 8x8 3x6 3x8 3x6 3x4 3x6 3x4 8x8 7-8-87-8-8 15-2-87-6-0 19-11-04-8-8 22-8-82-9-8 30-5-07-8-8 -1-0-0 1-0-0 7-8-8 7-8-8 15-2-8 7-6-0 22-8-8 7-6-0 30-5-0 7-8-8 31-5-0 1-0-0 0-10-07-2-10-10-05.00 12 Plate Offsets (X,Y)-- [10:Edge,0-5-11], [10:0-1-12,0-0-0], [18:0-1-12,0-0-0], [18:Edge,0-5-11], [21:0-1-6,0-1-0], [24:0-1-6,0-1-0], [27:0-1-6,0-1-0], [44:0-1-6,0-1-0], [47:0-1-6 ,0-1-0], [49:0-1-6,0-1-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.53 0.47 0.62 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.07 -0.22 0.04 (loc) 16-17 16-17 10 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 407 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-18,8-10: 2x4 SPF 2100F 1.8E OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 4-5-1 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 4-16 REACTIONS.All bearings 10-9-8 except (jt=length) 18=0-3-8, 14=0-3-8. (lb) - Max Horz 18=-71(LC 7) Max Uplift All uplift 100 lb or less at joint(s) 18, 11, 10, 13 except 12=-253(LC 2) Max Grav All reactions 250 lb or less at joint(s) 13, 14 except 18=947(LC 1), 11=1331(LC 1), 10=353(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-4=-1440/217, 4-5=-788/196, 5-6=-790/196, 2-18=-868/210, 8-10=-283/138 BOT CHORD 17-18=-103/614, 16-17=-90/1248, 10-11=-36/428 WEBS 6-16=-23/730, 6-11=-1062/233, 4-16=-703/142, 4-17=0/274, 2-17=-26/636, 8-11=-434/94 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) All plates are 2x4 MT20 unless otherwise indicated. 5) Gable studs spaced at 1-4-0 oc. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 18, 11, 10, 13 except (jt=lb) 12=253. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss GE10 Truss Type GABLE Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670505 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:17 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-Q31oKZ?YHI1vm8x7oE?TlUa0?D5DK1TVUyEz74y56yS Scale = 1:20.5 Sheet Back Full Sheathing 1 Ply 7/16OSB8 1 2 3 4 5 6 11 10 9 8 7 3x8 4x6 3x8 2x4 2x4 2x4 2x4 2x4 10-8-010-8-0 5-4-0 5-4-0 10-8-0 5-4-0 11-8-0 1-0-0 0-10-03-0-110-10-05.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.15 0.08 0.04 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 0.00 (loc) 5 6 7 l/defl n/r n/r n/a L/d 180 120 n/a PLATES MT20 Weight: 74 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 10-8-0. (lb) - Max Horz 11=-41(LC 7) Max Uplift All uplift 100 lb or less at joint(s) 11, 7, 10, 8 Max Grav All reactions 250 lb or less at joint(s) 11, 7, 9, 10, 8 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(9-10) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Gable requires continuous bottom chord bearing. 5) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 6) Gable studs spaced at 2-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 11, 7, 10, 8. 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss GE11 Truss Type Roof Special Structural Gable Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670506 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:21 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-JqGJAx23KWYLFlEv143PwKkaRqGkGhK5PaCBGry56yO Scale = 1:94.0 1 2 3 4 5 6 7 8 9 10 11 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 5x12 3x6 6x10 3x12 3x6 4x10 3x6 3x4 3x8 3x6 3x12 3x6 3x6 3x4 4x10 6x10 8-3-88-3-8 16-3-88-0-0 16-7-00-3-8 26-3-89-8-8 36-0-09-8-8 45-11-09-11-0 -1-0-0 1-0-0 8-3-8 8-3-8 16-7-0 8-3-8 22-11-8 6-4-8 30-6-8 7-7-0 38-1-8 7-7-0 45-11-0 7-9-8 46-11-0 1-0-0 0-11-711-4-1212-4-120-11-01-0-04.50 12 6.00 12 Plate Offsets (X,Y)-- [2:0-0-11,0-1-12], [3:0-4-12,0-2-8], [6:0-6-0,0-1-1], [10:0-0-14,0-1-12], [12:0-0-0,0-1-12], [12:Edge,0-3-8], [26:0-0-0,0-1-12], [40:0-1-0,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.63 0.94 0.68 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.17 -0.43 0.02 (loc) 21-22 21-22 12 l/defl >674 >269 n/a L/d 240 180 n/a PLATES MT20 Weight: 280 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 *Except* 5-22: 2x3 SPF No.2 WEBS 2x3 SPF No.2 *Except* 6-23,6-21,2-26,10-12: 2x4 SPF No.2 OTHERS 2x3 SPF No.2 *Except* 6-27: 2x4 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied. Except: 1 Row at midpt 5-23 WEBS 1 Row at midpt 3-23, 21-23, 6-23, 6-21, 7-21, 7-16 REACTIONS.All bearings 29-7-8 except (jt=length) 26=0-3-8, 23=0-3-8. (lb) - Max Horz 26=-146(LC 7) Max Uplift All uplift 100 lb or less at joint(s) 26, 20 except 16=-123(LC 7), 10=-162(LC 7), 23=-167(LC 6) Max Grav All reactions 250 lb or less at joint(s) 22, 18, 17, 15, 14, 13, 12 except 26=578(LC 10), 21=726(LC 1), 16=486(LC 11), 10=425(LC 11), 23=1281(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-631/141, 3-5=0/416, 5-6=0/399, 6-7=-66/250, 9-10=-405/174, 2-26=-499/175 BOT CHORD 24-26=-75/513, 23-24=-78/508, 5-23=-458/222, 15-16=-27/275, 14-15=-27/275, 13-14=-27/275, 12-13=-27/275 WEBS 3-24=0/347, 3-23=-857/193, 6-23=-487/10, 7-21=-404/216, 9-16=-417/214 NOTES-(10-11) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) This truss is not designed to support a ceiling and is not intended for use where aesthetics are a consideration. 5) All plates are 2x4 MT20 unless otherwise indicated. 6) Gable studs spaced at 2-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) Bearing at joint(s) 10 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 26, 20 except (jt=lb) 16=123, 10=162, 23=167. 10) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 11) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.).December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss GE12 Truss Type Roof Special Structural Gable Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670507 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:23 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-FDO3bc4Js8o2U3OH8V6t?lqr5e2okW8OsthILjy56yM Scale = 1:90.3 1 2 3 4 5 6 7 8 9 10 11 20 19 18 17 16 15 14 13 12 5x12 3x6 5x10 MT18HS 3x6 3x6 3x6 3x8 3x6 3x6 4x10 4x6 4x6 3x6 3x6 6x8 10x10 3x6 8-3-88-3-8 15-7-87-4-0 22-11-87-4-0 31-3-128-4-4 38-6-27-2-6 45-11-07-4-14 -1-0-0 1-0-0 8-3-8 8-3-8 15-7-8 7-4-0 22-11-8 7-4-0 31-3-12 8-4-4 38-6-2 7-2-6 45-11-0 7-4-14 46-11-0 1-0-0 1-11-712-4-120-11-04.50 12 6.00 12 Plate Offsets (X,Y)-- [2:0-3-0,0-1-12], [12:0-1-12,0-0-0], [12:Edge,0-7-13], [13:0-2-8,0-1-8], [14:0-2-8,0-2-0], [17:0-2-8,0-1-8], [19:0-2-8,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.94 0.51 0.98 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.09 -0.24 0.04 (loc) 14-16 17-19 12 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 MT18HS Weight: 199 lb FT = 20% GRIP 169/123 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 5-16,6-16,7-16,2-20: 2x4 SPF No.2, 10-12: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 3-10-9 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 3-17, 5-16, 6-16, 7-14, 9-14 REACTIONS.(lb/size)20=1209/0-3-8, 14=2160/0-3-8, 12=418/0-3-8 Max Horz 20=-131(LC 7) Max Uplift 20=-108(LC 6), 14=-58(LC 7), 12=-85(LC 7) Max Grav 20=1209(LC 1), 14=2160(LC 1), 12=501(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-1647/253, 3-5=-1211/259, 5-6=-610/250, 6-7=-628/245, 7-9=0/512, 9-10=-438/107, 2-20=-1121/239, 10-12=-429/140 BOT CHORD 19-20=-112/252, 17-19=-120/1464, 16-17=-19/993, 14-16=-368/194, 13-14=-65/305, 12-13=-42/407 WEBS 3-17=-561/149, 5-17=0/515, 5-16=-833/197, 7-16=-39/1143, 7-14=-1676/282, 9-14=-625/151, 9-13=0/304, 2-19=-97/1238 NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) All plates are MT20 plates unless otherwise indicated. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 14, 12 except (jt=lb) 20=108. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss J01 Truss Type Jack-Open Structural Gable Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670508 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:24 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-jPyRoy5xdRwv6DzUiCd6XzM8P2UbTClX5XQrtAy56yL Scale = 1:11.4 1 2 5 3 4 2x4 3x4 2-0-152-0-3 -2-2-13 2-2-13 2-0-15 2-0-15 1-1-01-8-71-4-51-8-73.58 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.39 0.09 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 -0.01 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 8 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 2-0-15 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)3=-13/Mechanical, 5=309/0-6-5, 4=-3/Mechanical Max Horz 5=35(LC 6) Max Uplift 3=-13(LC 1), 5=-113(LC 4), 4=-3(LC 1) Max Grav 3=12(LC 8), 5=309(LC 1), 4=28(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-5=-268/173 NOTES-(7-8) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 3) Gable studs spaced at 2-0-0 oc. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3, 4 except (jt=lb) 5=113. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss J02 Truss Type Jack-Open Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670509 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:26 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-go4BDe6B93AdLW7sqdfadOSV7rBXx6EqZrvyy2y56yJ Scale = 1:12.2 1 2 5 3 4 2x4 3x4 2-7-112-7-11 -2-2-13 2-2-13 2-7-11 2-7-11 1-1-01-10-73.58 12 Plate Offsets (X,Y)-- [2:0-2-0,0-1-4] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.38 0.06 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.01 -0.02 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 9 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 2-7-11 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=306/0-6-5, 3=8/Mechanical, 4=25/Mechanical Max Horz 5=66(LC 6) Max Uplift 5=-101(LC 4), 3=-18(LC 7) Max Grav 5=306(LC 1), 3=8(LC 1), 4=49(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-5=-281/161 NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3 except (jt=lb) 5=101. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss M01 Truss Type Monopitch Qty 8 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670510 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:28 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-cACyeK8ShgQLaqHFx2h2ipXtdfsuP0k709O20xy56yH Scale = 1:13.2 1 2 3 5 4 3x4 3x6 3x6 4-0-04-0-0 -1-0-0 1-0-0 4-0-0 4-0-0 0-9-02-1-01-9-80-3-82-1-04.00 12 Plate Offsets (X,Y)-- [4:Edge,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.25 0.07 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.01 0.00 (loc) 4-5 4-5 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 12 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=228/0-3-8, 4=138/0-1-8 Max Horz 5=62(LC 5) Max Uplift 5=-48(LC 4), 4=-14(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Bearing at joint(s) 4 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 4) Provide mechanical connection (by others) of truss to bearing plate at joint(s) 4. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 4. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss M02 Truss Type Monopitch Qty 9 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670511 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:28 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-cACyeK8ShgQLaqHFx2h2ipXpufriP0k709O20xy56yH Scale = 1:14.8 1 2 3 5 4 3x4 3x6 3x8 5-0-05-0-0 -1-0-0 1-0-0 5-0-0 5-0-0 0-9-02-5-02-1-80-3-82-5-04.00 12 Plate Offsets (X,Y)-- [4:0-3-8,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.49 0.15 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.03 0.00 (loc) 4-5 4-5 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 15 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 5-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=265/0-3-8, 4=180/0-1-8 Max Horz 5=74(LC 5) Max Uplift 5=-50(LC 4), 4=-19(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Bearing at joint(s) 4 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 4) Provide mechanical connection (by others) of truss to bearing plate at joint(s) 4. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 4. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss M03 Truss Type Monopitch Qty 4 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670512 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:31 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-0lt4GLAK_bowRI?qcBFlKR9Flsr5cNUZi7djdGy56yE Scale = 1:17.7 1 2 3 5 4 3x6 3x6 3x8 6-0-86-0-8 -1-0-0 1-0-0 6-0-8 6-0-8 0-9-02-9-32-5-110-3-82-9-34.00 12 Plate Offsets (X,Y)-- [4:0-3-8,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.77 0.23 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.03 -0.07 0.00 (loc) 4-5 4-5 4 l/defl >999 >998 n/a L/d 240 180 n/a PLATES MT20 Weight: 18 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=306/0-3-8, 4=223/0-1-8 Max Horz 5=85(LC 5) Max Uplift 5=-52(LC 4), 4=-25(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-5=-267/153 NOTES-(6-7) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Bearing at joint(s) 4 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 4) Provide mechanical connection (by others) of truss to bearing plate at joint(s) 4. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 4. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss M04 Truss Type Monopitch Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670513 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:32 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-UxRTUhBylvwn3Ra0Aum_sfiQiGB0LqkjxnMG9iy56yD Scale = 1:17.5 1 2 4 3 3x6 3x6 3x8 6-0-86-0-8 6-0-8 6-0-8 0-9-02-9-32-5-110-3-82-9-34.00 12 Plate Offsets (X,Y)-- [3:0-3-8,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.82 0.25 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.03 -0.07 0.00 (loc) 3-4 3-4 3 l/defl >999 >974 n/a L/d 240 180 n/a PLATES MT20 Weight: 16 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)4=230/0-3-8, 3=230/0-1-8 Max Horz 4=79(LC 5) Max Uplift 4=-13(LC 4), 3=-27(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Bearing at joint(s) 3 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 4) Provide mechanical connection (by others) of truss to bearing plate at joint(s) 3. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 4, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss M05 Truss Type Monopitch Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670514 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:33 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-y8?rh1CaWC2ehb9CkbHDPsEmMgae4HzsAR6pi8y56yC Scale = 1:15.1 1 2 3 5 4 2x4 2x4 2x4 2x4 2-0-02-0-0 -1-0-0 1-0-0 2-0-0 2-0-0 1-1-02-5-02-1-80-3-82-5-08.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.12 0.03 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 0.00 (loc) 5 5 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 9 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 2-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=160/0-3-8, 4=45/0-1-8 Max Horz 5=69(LC 5) Max Uplift 5=-30(LC 6), 4=-32(LC 5) Max Grav 5=160(LC 1), 4=48(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Bearing at joint(s) 4 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 4) Provide mechanical connection (by others) of truss to bearing plate at joint(s) 4. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 4. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss M06 Truss Type Monopitch Qty 10 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670515 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:34 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-RKZDvNDDHWAVIlkPIJoSx4nx64wtpkD?O5rNEby56yB Scale = 1:15.1 1 2 3 5 4 2x4 2x4 2x4 2x4 2-0-02-0-0 -1-0-0 1-0-0 2-0-0 2-0-0 1-1-02-5-02-1-80-3-82-5-08.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.12 0.03 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 0.00 (loc) 5 5 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 9 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 2-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=160/0-3-8, 4=45/0-1-8 Max Horz 5=69(LC 5) Max Uplift 5=-30(LC 6), 4=-32(LC 5) Max Grav 5=160(LC 1), 4=48(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Bearing at joint(s) 4 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 4) Provide mechanical connection (by others) of truss to bearing plate at joint(s) 4. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 4. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss MG01 Truss Type Monopitch Girder Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670516 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:36 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-NjgzK3ETo7RCY3unPkqw1Vs6ktRpHdjIsPKUITy56y9 Scale = 1:13.2 1 2 4 35 4x6 3x6 5x10 MT18HS 4-0-04-0-0 4-0-0 4-0-0 0-9-02-1-01-9-80-3-82-1-04.00 12 Plate Offsets (X,Y)-- [1:0-0-9,0-1-12], [3:Edge,0-2-0], [4:0-0-0,0-1-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.75 0.64 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.03 -0.08 0.00 (loc) 3-4 3-4 3 l/defl >999 >593 n/a L/d 240 180 n/a PLATES MT20 MT18HS Weight: 11 lb FT = 20% GRIP 169/123 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF No.2 *Except* 1-4: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)4=403/0-3-8, 3=420/0-1-8 Max Horz 4=56(LC 4) Max Uplift 4=-28(LC 3), 3=-39(LC 5) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-255/26 NOTES-(9-10) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2) All plates are MT20 plates unless otherwise indicated. 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Bearing at joint(s) 3 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate at joint(s) 3. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 4, 3. 7) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 527 lb down and 40 lb up at 2-0-12 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 8) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-2=-60, 3-4=-20 Concentrated Loads (lb) Vert: 5=-527(F) December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss MG02 Truss Type Monopitch Girder Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670517 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:39 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-nIM6y5GL52pnPWcM4sOde7Ugh5Z0U_SlYNZ8voy56y6 Scale = 1:14.8 1 2 3 5 46 3x4 3x6 3x8 5-0-05-0-0 -1-0-0 1-0-0 5-0-0 5-0-0 0-9-02-5-02-1-80-3-82-5-04.00 12 Plate Offsets (X,Y)-- [4:0-3-8,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.52 0.29 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.02 -0.04 0.00 (loc) 4-5 4-5 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 14 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF-S Stud WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 5-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=273/0-3-8, 4=192/0-1-8 Max Horz 5=74(LC 4) Max Uplift 5=-65(LC 3), 4=-45(LC 5) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Bearing at joint(s) 4 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 4) Provide mechanical connection (by others) of truss to bearing plate at joint(s) 4. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 4. 6) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 19 lb down and 40 lb up at 3-0-12 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 7) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-2=-60, 2-3=-60, 4-5=-20 Concentrated Loads (lb) Vert: 6=-19(B) December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss T01 Truss Type Common Qty 2 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670518 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:42 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-Ct2Fa6JEOzBMG_Lxm_xKGm6AAIXHhKyBELnoW7y56y3 Scale = 1:26.0 1 2 3 4 5 6 7 10 9 8 4x6 4x8 4x8 3x8 2x4 2x4 7-1-47-1-4 14-2-87-1-4 -1-0-0 1-0-0 3-7-14 3-7-14 7-1-4 3-5-6 10-6-10 3-5-6 14-2-8 3-7-14 15-2-8 1-0-0 0-9-03-1-70-9-04.00 12 Plate Offsets (X,Y)-- [8:0-4-1,0-2-0], [10:0-4-1,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.63 0.58 0.08 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.05 -0.11 0.02 (loc) 9 9 8 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 45 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-10,6-8: 2x6 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-1-1 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)10=624/0-3-8, 8=624/0-3-8 Max Horz 10=-32(LC 7) Max Uplift 10=-68(LC 6), 8=-68(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-879/161, 3-4=-750/123, 4-5=-750/123, 5-6=-879/161, 2-10=-530/169, 6-8=-530/169 BOT CHORD 9-10=-82/774, 8-9=-82/774 WEBS 4-9=0/256 NOTES-(5-6) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 10, 8. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss T02 Truss Type Common Qty 2 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670519 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:43 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-g3cdoSJs9HJDu8w7JiSZpzfLnirUQnBKT?XL2Zy56y2 Scale = 1:24.7 1 2 3 4 5 6 9 8 7 4x6 4x8 4x8 3x8 2x4 2x4 7-1-47-1-4 14-2-87-1-4 -1-0-0 1-0-0 3-7-14 3-7-14 7-1-4 3-5-6 10-6-10 3-5-6 14-2-8 3-7-14 0-9-03-1-70-9-04.00 12 Plate Offsets (X,Y)-- [6:0-4-1,0-2-0], [9:0-4-1,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.64 0.58 0.08 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.05 -0.11 0.02 (loc) 8 7-8 7 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 44 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-9,6-7: 2x6 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-0-8 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)9=627/0-3-8, 7=547/0-3-8 Max Horz 9=39(LC 6) Max Uplift 9=-68(LC 6), 7=-28(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-886/165, 3-4=-759/128, 4-5=-760/128, 5-6=-901/173, 2-9=-533/171, 6-7=-454/116 BOT CHORD 8-9=-108/781, 7-8=-118/799 WEBS 4-8=0/259 NOTES-(5-6) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 9, 7. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss T03 Truss Type Common Qty 4 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670520 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:46 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-4eHlQUMkSCholbfi?q0GRcHrfvsNd8kn9yl?fuy56y? Scale = 1:29.8 1 2 3 4 5 9 8 7 6 5x6 3x6 3x6 2x4 5x6 3x6 5x6 8-3-88-3-8 16-7-08-3-8 -1-0-0 1-0-0 8-3-8 8-3-8 16-7-0 8-3-8 17-7-0 1-0-0 0-11-74-0-120-11-74.50 12 Plate Offsets (X,Y)-- [6:Edge,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.66 0.69 0.09 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.08 -0.18 0.03 (loc) 7-9 7-9 6 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 46 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x6 SPF No.2 *Except* 3-7: 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-3-11 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)9=719/0-3-8, 6=719/0-3-8 Max Horz 9=-40(LC 7) Max Uplift 9=-72(LC 6), 6=-72(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-903/148, 3-4=-903/148, 2-9=-618/187, 4-6=-618/187 BOT CHORD 7-9=-26/761, 6-7=-26/761 WEBS 3-7=0/297 NOTES-(5-6) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 9, 6. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss T04 Truss Type Common Qty 7 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670521 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:48 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-00PWr9N?_pxV_vp56F2kW1MCAjby5xv3cGE5jny56xz Scale = 1:84.7 1 2 3 4 5 6 7 8 9 10 19 18 17 16 15 14 13 12 11 3x6 5x6 3x6 10x10 3x6 3x6 3x6 3x6 3x6 4x8 4x6 3x6 3x6 3x6 10x10 3x6 7-9-87-9-8 15-4-87-7-0 22-11-87-7-0 31-3-128-4-4 38-1-86-9-12 45-11-07-9-8 -1-0-0 1-0-0 7-9-8 7-9-8 15-4-8 7-7-0 22-11-8 7-7-0 30-6-8 7-7-0 38-1-8 7-7-0 45-11-0 7-9-8 0-11-012-4-120-11-06.00 12 Plate Offsets (X,Y)-- [11:Edge,0-2-4], [11:0-2-7,0-1-4], [12:0-2-8,0-1-8], [16:0-2-8,0-1-8], [18:0-2-8,0-1-8], [19:0-5-0,0-2-4], [19:0-2-7,0-1-4] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.60 0.49 0.56 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.09 -0.25 0.05 (loc) 13-15 16-18 11 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 200 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 5-15,6-15,7-15,7-13: 2x4 SPF No.2, 2-19,10-11: 2x6 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-11-11 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 3-16, 5-15, 6-15, 7-13, 9-13 REACTIONS.(lb/size)19=1201/0-3-8, 13=2191/0-3-8, 11=318/Mechanical Max Horz 19=140(LC 5) Max Uplift 19=-108(LC 6), 13=-66(LC 7), 11=-43(LC 7) Max Grav 19=1201(LC 1), 13=2191(LC 1), 11=408(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-1725/243, 3-5=-1210/248, 5-6=-592/239, 6-7=-592/239, 7-9=0/589, 9-10=-389/153, 2-19=-1118/238, 10-11=-332/90 BOT CHORD 18-19=-165/541, 16-18=-133/1450, 15-16=-29/992, 13-15=-274/165, 12-13=-104/259, 11-12=-82/473 WEBS 3-16=-533/146, 5-16=0/506, 5-15=-839/203, 7-15=-30/1058, 7-13=-1681/279, 9-13=-655/171, 9-12=0/306, 2-18=-31/913, 10-12=-343/132 NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 13, 11 except (jt=lb) 19=108. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss T05 Truss Type COMMON Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670522 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:49 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-VDzu2VOdk73Mc3NHgyZz2EvI27u1qKADrw_fFDy56xy Scale = 1:86.1 1 2 3 4 5 6 7 8 9 18 17 16 15 14 13 12 11 1019 3x6 5x6 3x6 5x12 3x6 3x6 2x4 3x6 3x6 4x10 4x6 3x8 3x6 3x6 10x10 3x6 3x6 1-0-01-0-0 8-3-17-3-1 16-1-47-10-4 23-11-87-10-4 32-3-128-4-4 39-1-86-9-12 46-11-07-9-8 8-3-1 8-3-1 16-1-4 7-10-4 23-11-8 7-10-4 32-3-12 8-4-4 39-1-8 6-9-12 46-11-0 7-9-8 0-5-012-4-120-11-06.00 12 Plate Offsets (X,Y)-- [1:0-3-8,0-2-0], [10:Edge,0-7-13], [10:0-1-12,0-0-0], [11:0-2-8,0-1-8], [12:0-3-8,0-1-8], [16:0-2-8,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-AS 0.91 0.63 0.82 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.10 -0.32 0.07 (loc) 16-18 16-18 10 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 195 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 *Except* 10-13: 2x4 SPF 2100F 1.8E WEBS 2x3 SPF No.2 *Except* 4-14,5-14,6-14: 2x4 SPF No.2, 6-12,9-10: 2x4 SPF-S Stud WEDGE Left: 2x6 SP No.2 BRACING- TOP CHORD Structural wood sheathing directly applied, except end verticals. BOT CHORD Structural wood sheathing directly applied. WEBS 1 Row at midpt 2-16, 4-14, 5-14, 6-12, 8-12 REACTIONS.All bearings 0-3-8 except (jt=length) 1=1-3-8, 10=Mechanical. (lb) - Max Horz 1=130(LC 5) Max Uplift All uplift 100 lb or less at joint(s) 1, 12, 10, 19 Max Grav All reactions 250 lb or less at joint(s) except 1=736(LC 1), 12=2263(LC 1), 10=404(LC 11), 19=450(LC 10) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-1916/258, 2-4=-1278/253, 4-5=-591/239, 5-6=-597/235, 6-8=0/609, 8-9=-370/218, 9-10=-329/93 BOT CHORD 1-19=-142/1615, 18-19=-142/1615, 16-18=-142/1615, 14-16=-33/1052, 12-14=-460/182, 10-11=-70/379 WEBS 2-18=0/293, 2-16=-640/157, 4-16=0/542, 4-14=-911/214, 6-14=-50/1226, 6-12=-1757/291, 8-12=-628/152, 8-11=0/313, 9-11=-318/125 NOTES-(7-8) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 12, 10, 19. 6) This truss design requires that a minimum of 7/16" structural wood sheathing be applied directly to the top chord and 1/2" gypsum sheetrock be applied directly to the bottom chord. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss T06 Truss Type COMMON Qty 7 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670523 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:50 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-zPXGGrPFVRBDDCyTEg5CbSRUtWFgZqhM4ajCnfy56xx Scale = 1:85.4 1 2 3 4 5 6 7 8 9 18 17 16 15 14 13 12 11 10 3x6 5x6 3x6 4x8 3x6 3x6 2x4 3x6 3x6 4x10 4x6 3x6 3x6 3x6 10x10 3x6 3x6 8-3-18-3-1 16-1-47-10-4 23-11-87-10-4 32-3-128-4-4 39-1-86-9-12 46-11-07-9-8 8-3-1 8-3-1 16-1-4 7-10-4 23-11-8 7-10-4 31-6-8 7-7-0 39-1-8 7-7-0 46-11-0 7-9-8 0-5-012-4-120-11-06.00 12 Plate Offsets (X,Y)-- [1:0-1-10,0-2-0], [10:Edge,0-7-13], [10:0-1-12,0-0-0], [11:0-2-8,0-1-8], [16:0-2-8,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-AS 0.84 0.54 0.61 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.09 -0.28 0.07 (loc) 16-18 16-18 10 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 194 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 *Except* 10-13: 2x4 SPF 2100F 1.8E WEBS 2x3 SPF No.2 *Except* 4-14,5-14,6-14,6-12: 2x4 SPF No.2, 9-10: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied, except end verticals. BOT CHORD Structural wood sheathing directly applied. WEBS 1 Row at midpt 2-16, 4-14, 5-14, 6-12, 8-12 REACTIONS.(lb/size)1=1152/0-3-8, 12=2339/0-3-8, 10=250/Mechanical Max Horz 1=130(LC 5) Max Uplift 1=-73(LC 6), 12=-71(LC 6), 10=-45(LC 7) Max Grav 1=1152(LC 1), 12=2339(LC 1), 10=369(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-1954/264, 2-4=-1258/249, 4-5=-555/231, 5-6=-550/232, 6-8=-17/734, 8-9=-313/276, 9-10=-295/89 BOT CHORD 1-18=-149/1659, 16-18=-149/1659, 14-16=-32/1032, 12-14=-391/181, 10-11=-60/356 WEBS 2-18=0/325, 2-16=-712/170, 4-16=0/563, 4-14=-928/220, 6-14=-41/1170, 6-12=-1818/296, 8-12=-674/174, 8-11=0/316, 9-11=-357/125 NOTES-(7-8) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 12, 10. 6) This truss design requires that a minimum of 7/16" structural wood sheathing be applied directly to the top chord and 1/2" gypsum sheetrock be applied directly to the bottom chord. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss T07 Truss Type Common Qty 2 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670524 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:52 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-voe1gXQV12SxTW6sL57ggtXt7Kyu1lsfXuCJsYy56xv Scale = 1:85.4 1 2 3 4 5 6 7 8 9 10 11 20 19 18 17 16 15 14 13 12 3x6 5x6 3x6 10x10 3x6 3x6 3x6 3x6 3x6 4x8 4x6 3x6 3x6 3x6 10x10 3x6 7-9-87-9-8 15-4-87-7-0 22-11-87-7-0 31-3-128-4-4 38-1-86-9-12 45-11-07-9-8 -1-0-0 1-0-0 7-9-8 7-9-8 15-4-8 7-7-0 22-11-8 7-7-0 30-6-8 7-7-0 38-1-8 7-7-0 45-11-0 7-9-8 46-11-0 1-0-0 0-11-012-4-120-11-06.00 12 Plate Offsets (X,Y)-- [12:0-5-0,0-2-4], [12:0-2-7,0-1-4], [13:0-2-8,0-1-8], [17:0-2-8,0-1-8], [19:0-2-8,0-1-8], [20:0-5-0,0-2-4], [20:0-2-7,0-1-4] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.60 0.49 0.56 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.09 -0.25 0.05 (loc) 14-16 17-19 12 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 202 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 5-16,6-16,7-16,7-14: 2x4 SPF No.2, 2-20,10-12: 2x6 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-11-12 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 3-17, 5-16, 6-16, 7-14, 9-14 REACTIONS.(lb/size)20=1199/0-3-8, 14=2193/0-3-8, 12=392/0-3-8 Max Horz 20=-127(LC 4) Max Uplift 20=-109(LC 6), 14=-60(LC 7), 12=-86(LC 7) Max Grav 20=1199(LC 1), 14=2193(LC 1), 12=482(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-1723/247, 3-5=-1207/252, 5-6=-589/244, 6-7=-589/244, 7-9=0/595, 9-10=-377/157, 2-20=-1116/240, 10-12=-405/143 BOT CHORD 19-20=-155/541, 17-19=-124/1448, 16-17=-21/990, 14-16=-280/190, 12-13=-32/420 WEBS 3-17=-533/145, 5-17=0/506, 5-16=-839/203, 7-16=-25/1062, 7-14=-1686/272, 9-14=-649/167, 9-13=0/305, 2-19=-31/911, 10-13=-302/109 NOTES-(5-6) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 14, 12 except (jt=lb) 20=109. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss T08 Truss Type Common Qty 5 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670525 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:53 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-N_CPutR7oMao4gh2voevD430nkM4mIkomYysO_y56xu Scale = 1:27.2 1 2 3 4 5 8 7 6 4x6 10x10 10x10 3x8 6-3-86-3-8 12-7-06-3-8 -1-0-0 1-0-0 6-3-8 6-3-8 12-7-0 6-3-8 13-7-0 1-0-0 0-11-04-0-120-11-06.00 12 Plate Offsets (X,Y)-- [6:Edge,0-7-13], [6:0-1-12,0-0-0], [8:0-1-12,0-0-0], [8:Edge,0-7-13] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.73 0.24 0.08 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.02 -0.06 0.01 (loc) 6-7 6-7 6 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 47 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-8,4-6: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)8=560/0-3-8, 6=560/0-3-8 Max Horz 8=46(LC 5) Max Uplift 8=-59(LC 6), 6=-59(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-594/122, 3-4=-594/122, 2-8=-498/166, 4-6=-498/166 BOT CHORD 7-8=-61/313, 6-7=-31/313 NOTES-(5-6) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 8, 6. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss T09 Truss Type Common Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670526 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:55 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-JNK9JZTOKzqWK_rR0DgNIV9NOXwUECz5DsRzSty56xs Scale = 1:29.8 1 2 3 4 5 9 8 7 6 5x6 3x6 3x6 2x4 5x6 3x6 5x6 8-3-88-3-8 16-7-08-3-8 -1-0-0 1-0-0 8-3-8 8-3-8 16-7-0 8-3-8 17-7-0 1-0-0 0-11-74-0-120-11-74.50 12 Plate Offsets (X,Y)-- [6:Edge,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.66 0.69 0.09 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.08 -0.18 0.03 (loc) 7-9 7-9 6 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 46 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x6 SPF No.2 *Except* 3-7: 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-3-11 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)9=719/0-3-8, 6=719/0-3-8 Max Horz 9=-40(LC 7) Max Uplift 9=-72(LC 6), 6=-72(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-903/148, 3-4=-903/148, 2-9=-618/187, 4-6=-618/187 BOT CHORD 7-9=-26/761, 6-7=-26/761 WEBS 3-7=0/297 NOTES-(5-6) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 9, 6. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss T10 Truss Type Roof Special Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670527 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:44:59 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-C8Zg9wWuOCKyob8CF3lJSLJ3L9JmAsAh8UPAbey56xo Scale = 1:86.9 1 2 3 4 5 6 7 8 9 10 11 21 20 19 18 17 16 15 14 13 12 5x12 3x6 3x6 10x10 3x6 3x4 3x4 3x6 3x6 8x10 6x8 4x10 4x6 3x6 3x6 3x6 10x10 8-3-88-3-8 16-7-08-3-8 22-11-86-4-8 31-3-128-4-4 38-1-86-9-12 45-11-07-9-8 -1-0-0 1-0-0 8-3-8 8-3-8 16-7-0 8-3-8 22-11-8 6-4-8 30-6-8 7-7-0 38-1-8 7-7-0 45-11-0 7-9-8 46-11-0 1-0-0 0-11-711-4-1212-4-120-11-01-0-04.50 12 6.00 12 Plate Offsets (X,Y)-- [12:Edge,0-7-13], [12:0-1-12,0-0-0], [13:0-2-8,0-1-8], [19:0-2-8,0-1-8], [21:0-1-12,0-0-0], [21:Edge,0-7-9] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.66 0.61 0.72 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.14 -0.43 0.06 (loc) 18-19 18-19 12 l/defl >999 >864 n/a L/d 240 180 n/a PLATES MT20 Weight: 208 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 *Except* 5-17: 2x3 SPF No.2, 12-15: 2x4 SPF 2100F 1.8E WEBS 2x3 SPF No.2 *Except* 6-18,6-16,7-16,7-14: 2x4 SPF No.2, 2-21,10-12: 2x4 SPF 2100F 1.8E BRACING- TOP CHORD Structural wood sheathing directly applied or 3-7-6 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. Except: 1 Row at midpt 5-18 WEBS 1 Row at midpt 3-18, 6-16, 7-14, 9-14 REACTIONS.(lb/size)21=1154/0-3-8, 14=2335/0-3-8, 12=298/0-3-8 Max Horz 21=-146(LC 7) Max Uplift 21=-107(LC 6), 14=-60(LC 6), 12=-88(LC 7) Max Grav 21=1154(LC 1), 14=2335(LC 1), 12=432(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-1956/273, 3-5=-1150/235, 5-6=-1107/367, 6-7=-498/237, 7-9=-6/784, 9-10=-291/329, 2-21=-1068/231, 10-12=-355/136 BOT CHORD 19-21=-118/629, 18-19=-131/1749, 5-18=-457/223, 14-16=-435/202, 13-14=-262/170, 12-13=-43/443 WEBS 3-19=0/266, 3-18=-903/197, 16-18=0/369, 6-18=-221/1159, 6-16=-766/86, 7-16=-33/1167, 7-14=-1816/287, 9-14=-666/170, 9-13=0/316, 2-19=-86/1127, 10-13=-466/132 NOTES-(5-6) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 14, 12 except (jt=lb) 21=107. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss T11 Truss Type GABLE Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670528 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:45:01 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-8XhQZcX8wpaf2vIbNUnoXmOPry?Eemg_couHgWy56xm Scale = 1:86.9 1 2 3 4 5 6 7 8 9 10 11 21 20 19 18 17 16 15 14 13 12 5x12 3x6 3x6 10x10 3x6 3x4 3x4 3x6 3x6 8x10 6x8 4x10 4x6 3x6 3x6 3x6 10x10 8-3-88-3-8 16-7-08-3-8 22-11-86-4-8 31-3-128-4-4 38-1-86-9-12 45-11-07-9-8 -1-0-0 1-0-0 8-3-8 8-3-8 16-7-0 8-3-8 22-11-8 6-4-8 30-6-8 7-7-0 38-1-8 7-7-0 45-11-0 7-9-8 46-11-0 1-0-0 0-11-711-4-1212-4-120-11-01-0-04.50 12 6.00 12 Plate Offsets (X,Y)-- [12:Edge,0-7-13], [12:0-1-12,0-0-0], [13:0-2-8,0-1-8], [19:0-2-8,0-1-8], [21:0-1-12,0-0-0], [21:Edge,0-7-9] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.66 0.61 0.72 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.14 -0.43 0.06 (loc) 18-19 18-19 12 l/defl >999 >864 n/a L/d 240 180 n/a PLATES MT20 Weight: 208 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 *Except* 5-17: 2x3 SPF No.2, 12-15: 2x4 SPF 2100F 1.8E WEBS 2x3 SPF No.2 *Except* 6-18,6-16,7-16,7-14: 2x4 SPF No.2, 2-21,10-12: 2x4 SPF 2100F 1.8E BRACING- TOP CHORD Structural wood sheathing directly applied or 3-7-6 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. Except: 1 Row at midpt 5-18 WEBS 1 Row at midpt 3-18, 6-16, 7-14, 9-14 REACTIONS.(lb/size)21=1154/0-3-8, 14=2335/0-3-8, 12=298/0-3-8 Max Horz 21=-146(LC 7) Max Uplift 21=-107(LC 6), 14=-60(LC 6), 12=-88(LC 7) Max Grav 21=1154(LC 1), 14=2335(LC 1), 12=432(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-1956/273, 3-5=-1150/235, 5-6=-1107/367, 6-7=-498/237, 7-9=-6/784, 9-10=-291/329, 2-21=-1068/231, 10-12=-355/136 BOT CHORD 19-21=-118/629, 18-19=-131/1749, 5-18=-457/223, 14-16=-435/202, 13-14=-262/170, 12-13=-43/443 WEBS 3-19=0/266, 3-18=-903/197, 16-18=0/369, 6-18=-221/1159, 6-16=-766/86, 7-16=-33/1167, 7-14=-1816/287, 9-14=-666/170, 9-13=0/316, 2-19=-86/1127, 10-13=-466/132 NOTES-(5-6) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 14, 12 except (jt=lb) 21=107. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss T12 Truss Type Common Qty 2 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670529 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:45:02 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-cjFpnyYnh7iWf2tnxBI14_xb2MJsNGW7qSdrCzy56xl Scale = 1:35.1 1 2 3 4 5 6 7 11 10 9 8 4x6 3x6 3x8 3x6 3x6 8x8 8x8 9-11-89-11-8 19-11-09-11-8 -1-0-0 1-0-0 5-1-0 5-1-0 9-11-8 4-10-8 14-10-0 4-10-8 19-11-0 5-1-0 20-11-0 1-0-0 0-10-04-11-130-10-05.00 12 Plate Offsets (X,Y)-- [2:0-1-12,0-0-12], [2:Edge,0-3-0], [6:0-1-12,0-0-12], [8:Edge,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.63 0.65 0.55 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.13 -0.35 0.04 (loc) 9-11 9-11 8 l/defl >999 >677 n/a L/d 240 180 n/a PLATES MT20 Weight: 72 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-11,6-8: 2x4 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-8-7 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)11=854/0-3-8, 8=854/0-3-8 Max Horz 11=-51(LC 7) Max Uplift 11=-76(LC 6), 8=-76(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-614/0, 3-4=-1005/156, 4-5=-1005/156, 5-6=-614/0, 2-11=-411/95, 6-8=-411/95 BOT CHORD 9-11=-105/1088, 8-9=-105/1088 WEBS 4-9=0/470, 5-9=-281/129, 3-9=-281/129, 3-11=-721/229, 5-8=-721/229 NOTES-(5-6) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 11, 8. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss T13 Truss Type Common Qty 2 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670530 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:45:04 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-Y5NZCea1CkyEvM1A2cLV9P0xSA09rCFQIm6xHry56xj Scale = 1:54.4 1 2 3 4 5 6 7 8 9 16 15 14 13 12 11 10 3x6 5x10 MT18HS 3x6 8x16 3x6 3x8 3x6 3x6 3x6 3x6 8x16 3x6 7-8-87-8-8 15-2-87-6-0 22-8-87-6-0 30-5-07-8-8 -1-0-0 1-0-0 7-8-8 7-8-8 15-2-8 7-6-0 22-8-8 7-6-0 30-5-0 7-8-8 31-5-0 1-0-0 0-10-07-2-10-10-05.00 12 Plate Offsets (X,Y)-- [10:Edge,0-6-8], [10:0-2-12,0-0-0], [11:0-2-8,0-1-8], [15:0-2-8,0-1-8], [16:0-2-12,0-0-0], [16:Edge,0-6-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.58 0.59 0.41 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.10 -0.32 0.08 (loc) 13-15 11-13 10 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 MT18HS Weight: 112 lb FT = 20% GRIP 197/144 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-16,8-10: 2x6 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-5-10 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 6-13, 4-13 REACTIONS.(lb/size)16=1272/0-3-8, 10=1272/0-3-8 Max Horz 16=72(LC 6) Max Uplift 16=-99(LC 6), 10=-99(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-4=-2112/287, 4-5=-1557/273, 5-6=-1557/273, 6-8=-2112/287, 2-16=-1185/246, 8-10=-1185/246 BOT CHORD 15-16=-94/675, 13-15=-152/1866, 11-13=-152/1866, 10-11=-61/675 WEBS 5-13=-30/691, 6-13=-625/133, 4-13=-625/133, 2-15=-92/1195, 8-11=-92/1195 NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) All plates are MT20 plates unless otherwise indicated. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 16, 10. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss T14 Truss Type Common Qty 2 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670531 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:45:06 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-VUUJdJbHkLCy8gBYA1NzEq6HCzp8JBwjl4b2Lky56xh Scale = 1:20.9 1 2 3 4 7 6 5 8x8 4x6 8x8 3x8 5-4-05-4-0 10-8-05-4-0 5-4-0 5-4-0 10-8-0 5-4-0 11-8-0 1-0-0 0-10-03-0-110-10-05.00 12 Plate Offsets (X,Y)-- [1:Edge,0-2-8], [5:0-2-12,0-2-8], [5:0-1-10,0-0-11], [7:0-1-10,0-0-11] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.62 0.18 0.08 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.03 0.01 (loc) 5-6 6-7 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 38 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-7,3-5: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)7=411/Mechanical, 5=488/0-3-8 Max Horz 7=-41(LC 7) Max Uplift 7=-20(LC 6), 5=-57(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-542/119, 2-3=-542/120, 1-7=-357/106, 3-5=-433/158 BOT CHORD 6-7=-46/296 NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 7, 5. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss T15 Truss Type Common Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670532 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:45:08 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-Rtc41?dXGzTgOzKxHSPRKFBcjnUcn5V0DN49Qdy56xf Scale = 1:19.5 1 2 3 6 5 4 8x8 4x6 8x8 3x8 5-4-05-4-0 10-8-05-4-0 5-4-0 5-4-0 10-8-0 5-4-0 0-10-03-0-110-10-05.00 12 Plate Offsets (X,Y)-- [1:Edge,0-2-8], [3:Edge,0-2-8], [4:0-1-10,0-0-11], [6:0-1-10,0-0-11] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.62 0.18 0.07 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.03 0.01 (loc) 4-5 4-5 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 36 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-6,3-4: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)6=415/Mechanical, 4=415/0-3-8 Max Horz 6=-20(LC 7) Max Uplift 6=-20(LC 6), 4=-20(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-551/124, 2-3=-551/124, 1-6=-360/108, 3-4=-360/108 BOT CHORD 5-6=-59/296, 4-5=-59/296 NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 6, 4. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss TG01 Truss Type Common Girder Qty 1 Ply 3 114 Woods at Shelborne Job Reference (optional) I35670533 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:45:11 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-rSICg1fQZurFFR3Wyaz8xtpAC_OV_J7SvLJp1xy56xc Scale = 1:50.8 1 2 3 4 5 6 7 14 13 12 11 10 9 81516171819202122232425262728 3x6 4x6 3x6 6x8 4x6 4x8 3x6 4x6 3x6 4x6 6x8 4x6 7-9-07-9-0 15-2-87-5-8 22-8-07-5-8 30-5-07-9-0 7-9-0 7-9-0 15-2-8 7-5-8 22-8-0 7-5-8 30-5-0 7-9-0 0-10-07-2-10-10-05.00 12 Plate Offsets (X,Y)-- [8:0-3-0,0-5-0], [8:0-2-12,0-0-0], [14:0-2-12,0-0-0], [14:0-3-0,0-5-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.42 0.68 0.59 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.15 -0.28 0.06 (loc) 11-13 11-13 8 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 407 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x6 SPF No.2 WEBS 2x4 SPF-S Stud *Except* 1-14,7-8: 2x6 SP 2400F 2.0E BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)14=3809/0-3-8, 8=4139/0-3-8 Max Horz 14=-59(LC 6) Max Uplift 14=-460(LC 5), 8=-500(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-3=-6836/852, 3-4=-4942/651, 4-5=-4942/651, 5-7=-6795/845, 1-14=-3053/415, 7-8=-3039/412 BOT CHORD 13-14=-467/3340, 11-13=-772/6220, 9-11=-707/6182, 8-9=-408/3285 WEBS 4-11=-374/3254, 5-11=-1947/320, 5-9=-92/1173, 3-11=-1990/327, 3-13=-97/1207, 1-13=-306/2887, 7-9=-316/2904 NOTES-(8-9) 1) 3-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc, 2x6 - 2 rows staggered at 0-9-0 oc. Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-9-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 14=460, 8=500. 7) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 388 lb down and 55 lb up at 2-0-12, 388 lb down and 55 lb up at 4-0-12, 388 lb down and 55 lb up at 6-0-12, 384 lb down and 61 lb up at 8-0-12, 349 lb down and 57 lb up at 10-0-12, 349 lb down and 57 lb up at 12-0-12, 349 lb down and 57 lb up at 14-0-12, 349 lb down and 57 lb up at 16-0-12, 349 lb down and 57 lb up at 18-0-12, 349 lb down and 57 lb up at 20-0-12, 349 lb down and 57 lb up at 22-0-12, 388 lb down and 55 lb up at 24-0-12, 388 lb down and 55 lb up at 26-0-12, and 388 lb down and 55 lb up at 28-0-12, and 396 lb down and 50 lb up at 30-3-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard Continued on page 2 December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss TG01 Truss Type Common Girder Qty 1 Ply 3 114 Woods at Shelborne Job Reference (optional) I35670533 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:45:11 2018 Page 2 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-rSICg1fQZurFFR3Wyaz8xtpAC_OV_J7SvLJp1xy56xc LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-4=-60, 4-7=-60, 8-14=-20 Concentrated Loads (lb) Vert: 8=-396(B) 15=-388(B) 16=-388(B) 17=-388(B) 18=-384(B) 19=-349(B) 20=-349(B) 21=-349(B) 22=-349(B) 23=-349(B) 24=-349(B) 25=-349(B) 26=-388(B) 27=-388(B) 28=-388(B) 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss TG02 Truss Type Half Hip Girder Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670534 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:45:12 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-JesatNg2KBz6sbeiWIUNU5MQiOuejvPb8?2NZOy56xb Scale = 1:12.5 1 2 3 4 7 6 5 4x6 2x4 2x4 3x4 3x6 2x4 1-3-01-3-0 2-0-00-9-0 -1-0-0 1-0-0 1-3-0 1-3-0 2-0-0 0-9-0 1-1-01-11-01-7-80-3-81-11-08.00 12 Plate Offsets (X,Y)-- [3:0-3-12,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.11 0.04 0.01 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 -0.00 (loc) 7 7 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 10 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF-S Stud WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 2-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins: 3-4. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.(lb/size)7=162/0-3-8, 5=51/0-1-8 Max Horz 7=58(LC 4) Max Uplift 7=-35(LC 5), 5=-26(LC 4) Max Grav 7=162(LC 1), 5=55(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(10-11) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2) Provide adequate drainage to prevent water ponding. 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Bearing at joint(s) 5 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate at joint(s) 5. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 7, 5. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 23 lb down and 10 lb up at 1-3-0 on top chord, and 15 lb down at 1-3-0 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 9) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). 10) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 11) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-2=-60, 2-3=-60, 3-4=-60, 5-7=-20 Concentrated Loads (lb) Vert: 6=-8(B) December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss TG03 Truss Type Half Hip Girder Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670535 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:45:13 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-oqQz5jhg5V5yUlDu4??c1IubNoEaSMflMfow5qy56xa Scale = 1:11.7 1 2 3 4 7 6 5 4x6 2x4 2x4 2x4 2x4 2x4 1-0-01-0-0 2-0-01-0-0 -1-0-0 1-0-0 1-0-0 1-0-0 2-0-0 1-0-0 1-1-01-9-08.00 12 Plate Offsets (X,Y)-- [3:0-3-12,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.12 0.06 0.01 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 -0.00 0.00 (loc) 7 7 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 9 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF-S Stud WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 2-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins: 3-4. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.(lb/size)5=34/Mechanical, 7=149/0-3-8 Max Horz 7=53(LC 4) Max Uplift 5=-31(LC 4), 7=-44(LC 5) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(9-10) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2) Provide adequate drainage to prevent water ponding. 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 7. 6) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 7) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 28 lb down and 72 lb up at 1-0-0 on top chord, and 8 lb down and 14 lb up at 1-0-0 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 8) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-2=-60, 2-3=-60, 3-4=-60, 5-7=-20 Concentrated Loads (lb) Vert: 3=23(F) December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss V01 Truss Type GABLE Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670536 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:45:15 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-kDXjVOiwd6Lgj2NHBQ146j_uzbsuwGl2qzH1Ajy56xY Scale = 1:26.6 Sheet Front Full Sheathing 1 Ply 7/16OSB8 1 2 3 4 5 6 7 12 11 10 9 83x4 3x4 3x4 4x6 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 16-7-616-7-6 8-3-11 8-3-11 16-7-6 8-3-11 0-0-43-5-90-0-45.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.30 0.20 0.04 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 7 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 93 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 16-7-6. (lb) - Max Horz 1=-30(LC 7) Max Uplift All uplift 100 lb or less at joint(s) 1, 7, 11, 12, 9, 8 Max Grav All reactions 250 lb or less at joint(s) 1, 7, 10, 11, 9 except 12=308(LC 1), 8=308(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 7, 11, 12, 9, 8. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss V02 Truss Type GABLE Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670537 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:45:18 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-8oDs8Qlpv1jFaW5stYbnkMcLYpu77c5UWxVhm1y56xV Scale = 1:18.9 1 2 3 43x8 4x10 3x8 2x4 11-9-1311-9-13 5-10-14 5-10-14 11-9-13 5-10-14 0-0-42-5-90-0-45.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.54 0.23 0.07 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 26 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF-S Stud BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=169/11-9-13, 3=169/11-9-13, 4=488/11-9-13 Max Horz 1=-20(LC 7) Max Uplift 1=-17(LC 6), 3=-19(LC 7), 4=-9(LC 6) Max Grav 1=177(LC 10), 3=177(LC 11), 4=488(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. WEBS 2-4=-322/123 NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3, 4. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss V03 Truss Type Valley Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670538 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:45:18 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:fuyVRsNjKtsQQgb19mr93ay57Qr-8oDs8Qlpv1jFaW5stYbnkMcPLpmH7d6UWxVhm1y56xV Scale = 1:12.9 1 2 3 2x4 2x4 2x4 0-0-100-0-10 7-0-36-11-10 3-6-2 3-6-2 7-0-3 3-6-2 0-0-41-5-90-0-45.00 12 Plate Offsets (X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.29 0.73 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 11 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=236/6-11-0, 3=236/6-11-0 Max Horz 1=12(LC 6) Max Uplift 1=-12(LC 6), 3=-12(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-256/127, 2-3=-256/127 NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss V04 Truss Type GABLE Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670539 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:45:22 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-1ZSMzooJzGDh37Pd6OfjuBm7WQH02Px4RZTuvpy56xR Scale = 1:42.3 1 2 3 4 5 6 7 13 12 11 10 9 83x4 4x6 3x4 3x6 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 25-7-725-7-7 12-9-12 12-9-12 25-7-7 12-9-12 0-0-45-4-10-0-45.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.15 0.10 0.14 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 7 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 70 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 25-7-7. (lb) - Max Horz 1=-47(LC 7) Max Uplift All uplift 100 lb or less at joint(s) 12, 13, 9, 8 Max Grav All reactions 250 lb or less at joint(s) 1, 7 except 10=306(LC 1), 12=318(LC 10), 13=366(LC 1), 9=318(LC 11), 8=366(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. WEBS 2-13=-262/117, 6-8=-262/117 NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 12, 13, 9, 8. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss V05 Truss Type GABLE Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670540 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:45:24 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-zya7OTpaVtUPIRZ0DpiBzcrOLEtmWKRMuty?_hy56xP Scale = 1:33.4 1 2 3 4 5 9 8 7 63x6 4x6 3x6 3x6 2x4 2x4 2x4 2x4 2x4 20-9-1420-9-14 10-4-15 10-4-15 20-9-14 10-4-15 0-0-44-4-10-0-45.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.39 0.47 0.07 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 5 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 53 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 *Except* 1-8: 2x4 SPF-S Stud OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 20-9-14. (lb) - Max Horz 1=38(LC 6) Max Uplift All uplift 100 lb or less at joint(s) 1, 5, 9, 6 Max Grav All reactions 250 lb or less at joint(s) 1, 5, 7 except 9=486(LC 10), 6=485(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. WEBS 2-9=-349/148, 4-6=-344/147 NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 5, 9, 6. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss V06 Truss Type GABLE Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670541 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:45:25 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-R88VcpqCGBcFwb8CnWDQWqOb0dJXFosW7XiZW7y56xO Scale = 1:25.7 1 2 3 4 5 8 7 63x4 3x8 3x4 2x4 2x4 2x4 2x4 2x4 16-0-416-0-4 8-0-2 8-0-2 16-0-4 8-0-2 0-0-43-4-10-0-45.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.27 0.11 0.06 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 5 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 35 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 16-0-4. (lb) - Max Horz 1=-29(LC 7) Max Uplift All uplift 100 lb or less at joint(s) 1, 5, 8, 6 Max Grav All reactions 250 lb or less at joint(s) 1, 5 except 7=302(LC 1), 8=333(LC 10), 6=333(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 5, 8, 6. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss V07 Truss Type GABLE Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670542 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:45:27 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-NXGF1VsSoosz9uHbuxFubFTuERycjiPparBfb0y56xM Scale = 1:18.3 1 2 3 43x8 4x8 3x8 2x4 11-2-1011-2-10 5-7-5 5-7-5 11-2-10 5-7-5 0-0-42-4-10-0-45.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.48 0.20 0.06 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 24 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF-S Stud BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=159/11-2-10, 3=159/11-2-10, 4=459/11-2-10 Max Horz 1=-19(LC 7) Max Uplift 1=-16(LC 6), 3=-18(LC 7), 4=-9(LC 6) Max Grav 1=167(LC 10), 3=167(LC 11), 4=459(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. WEBS 2-4=-303/119 NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3, 4. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss V08 Truss Type Valley Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670543 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:45:29 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:ng2GX1wgaftzvOTJqAshQDz3lFW-KvN0RBtjKQ6hPCRz0MHMggZISFY?Bbr629gmfvy56xK Scale = 1:11.8 1 2 3 2x4 2x4 2x4 0-0-100-0-10 6-5-16-4-7 3-2-8 3-2-8 6-5-1 3-2-8 0-0-41-4-10-0-45.00 12 Plate Offsets (X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.24 0.59 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 10 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=213/6-3-14, 3=213/6-3-14 Max Horz 1=-11(LC 7) Max Uplift 1=-11(LC 6), 3=-11(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 114_Woods_at_Shelborne Truss V09 Truss Type GABLE Qty 1 Ply 1 114 Woods at Shelborne Job Reference (optional) I35670544 8.220 s Nov 16 2018 MiTek Industries, Inc. Wed Dec 26 10:45:31 2018 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:MgnV?_o_I1dMGB5Eaq?t5WzW5Ho-GIVmssvzr1MPeWbM7nKql5ee52LYfVKOVT9tkny56xI Scale = 1:8.4 1 2 3 2x4 2x4 2x4 3-4-15 3-4-15 0-0-41-1-104.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.23 0.14 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 6 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 WEBS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-4-15 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=105/3-4-15, 3=105/3-4-15 Max Horz 1=30(LC 5) Max Uplift 1=-7(LC 4), 3=-11(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Gable requires continuous bottom chord bearing. 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). December 26,2018 PRODUCT CODE APPROVALSLATERAL BRACING LOCATIONIndicates location where bearings(supports) occur. Icons vary butreaction section indicates jointnumber where bearings occur.Min size shown is for crushing only.Indicated by symbol shown and/orby text in the bracing section of theoutput. Use T or I bracingif indicated.The first dimension is the plate width measured perpendicular to slots. Second dimension isthe length parallel to slots.Center plate on joint unless x, yoffsets are indicated.Dimensions are in ft-in-sixteenths.Apply plates to both sides of trussand fully embed teeth.1. Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI.2. Truss bracing must be designed by an engineer. For wide truss spacing, individual lateral braces themselves may require bracing, or alternative Tor I bracing should be considered.3. Never exceed the design loading shown and never stack materials on inadequately braced trusses.4. Provide copies of this truss design to the building designer, erection supervisor, property owner and all other interested parties.5. Cut members to bear tightly against each other.6. Place plates on each face of truss at each joint and embed fully. Knots and wane at joint locations are regulated by ANSI/TPI 1.7. Design assumes trusses will be suitably protected from the environment in accord with ANSI/TPI 1.8. Unless otherwise noted, moisture content of lumber shall not exceed 19% at time of fabrication.9. Unless expressly noted, this design is not applicable for use with fire retardant, preservative treated, or green lumber.10. Camber is a non-structural consideration and is the responsibility of truss fabricator. General practice is to camber for dead load deflection.11. Plate type, size, orientation and location dimensions indicated are minimum plating requirements.12. Lumber used shall be of the species and size, and in all respects, equal to or better than that specified.13. Top chords must be sheathed or purlins provided at spacing indicated on design.14. Bottom chords require lateral bracing at 10 ft. spacing, or less, if no ceiling is installed, unless otherwise noted.15. Connections not shown are the responsibility of others.16. Do not cut or alter truss member or plate without prior approval of an engineer.17. Install and load vertically unless indicated otherwise.18. Use of green or treated lumber may pose unacceptable environmental, health or performance risks. Consult with project engineer before use.19. Review all portions of this design (front, back, words and pictures) before use. Reviewing pictures alone is not sufficient.20. Design assumes manufacture in accordance with ANSI/TPI 1 Quality Criteria.Failure to Follow Could Cause PropertyDamage or Personal Injury (Drawings not to scale)© 2012 MiTek® All Rights ReservedMiTek Engineering Reference Sheet: MII-7473 rev. 10/03/2015edge of truss.from outside"16/1-0ICC-ES Reports:ESR-1311, ESR-1352, ESR1988ER-3907, ESR-2362, ESR-1397, ESR-3282JOINTS ARE GENERALLY NUMBERED/LETTERED CLOCKWISEAROUND THE TRUSS STARTING AT THE JOINT FARTHEST TOTHE LEFT.CHORDS AND WEBS ARE IDENTIFIED BY END JOINTNUMBERS/LETTERS.W 4 - 6 W3-6W3- 7 W2-7W1-7C1-8 C5-6C6-7C7-8C4-5 C3-4C2-3C1-2TOP CHORD TOP CHORD 87654321BOTTOM CHORDSTOP CHORDSBEARING4 x 4PLATE SIZEThis symbol indicates the required direction of slots inconnector plates."16/1For 4 x 2 orientation, locateplates 0- 1"4/3PLATE LOCATION AND ORIENTATIONSymbolsNumbering SystemGeneral Safety Notes *Plate location details available in MiTek 20/20software or upon request.Industry Standards:ANSI/TPI1: National Design Specification for Metal Plate Connected Wood Truss Construction.DSB-89: Design Standard for Bracing.BCSI: Building Component Safety Information, Guide to Good Practice for Handling, Installing & Bracing of Metal Plate Connected Wood Trusses.6-4-8WEBSTrusses are designed for wind loads in the plane of the truss unless otherwise shown.Lumber design values are in accordance with ANSI/TPI 1 section 6.3 These truss designs rely on lumber values established by others.dimensions shown in ft-in-sixteenths