Loading...
HomeMy WebLinkAboutE001.0\A1;48'-0" - OVERALL CONCRETE SLABELECTRICAL PANEL (VERIFY LOCATION IN FIELD) GFI DEDICATED GFI FOR SUMP PUMP (VERIFY IN FIELD)OPT. DEDICATED GFI FOR EJECTOR PUMP (VERIFY IN FIELD) GAS VALVEGFIOPT. GAS VALVEGFI DEDICATED GFI w/ GAS WATER HEATER OPT. 220V S3S TO LIGHT \PABOVE S/C SBASEMENT - UNFINISHED\A1;7" U0.01 BASEMENT UTILITY PLANMidwest Zone Office1900 Golf Road - Suite 300Schaumburg, Illinois 60173(c) Copyright 2015 PulteGroup, Inc. PRODUCT MANAGERRick StarkeyVERSION RELEASEDATE:12/01/2017 PROJECT TYPEGARAGE LEFT SHEET PLAN NAME SPECIFICATION LEVEL NPC CHILD NUMBER ---- Maplevalley 1039.300.00.CPMHome for * Market Home *, 5581-086004465 Evergreen Trail, Carmel, IN 46074BASEMENT FOUNDATION PLANSCALE: 1/4" = 1'-0" (HALF SCALE ON 11x17 PAPER) 01/18/19 Mike Sheeks