HomeMy WebLinkAboutE001.0\A1;48'-0" - OVERALL CONCRETE SLABELECTRICAL PANEL (VERIFY LOCATION IN FIELD)
GFI
DEDICATED GFI FOR SUMP PUMP (VERIFY IN FIELD)OPT. DEDICATED GFI FOR EJECTOR PUMP (VERIFY IN FIELD)
GAS VALVEGFIOPT. GAS VALVEGFI
DEDICATED GFI w/ GAS WATER HEATER OPT.
220V
S3S
TO LIGHT \PABOVE
S/C
SBASEMENT - UNFINISHED\A1;7"
U0.01 BASEMENT UTILITY PLANMidwest Zone Office1900 Golf Road - Suite 300Schaumburg, Illinois 60173(c) Copyright 2015 PulteGroup, Inc.
PRODUCT MANAGERRick StarkeyVERSION RELEASEDATE:12/01/2017
PROJECT TYPEGARAGE LEFT
SHEET
PLAN NAME
SPECIFICATION LEVEL
NPC CHILD NUMBER
----
Maplevalley
1039.300.00.CPMHome for * Market Home *, 5581-086004465 Evergreen Trail, Carmel, IN 46074BASEMENT FOUNDATION PLANSCALE: 1/4" = 1'-0" (HALF SCALE ON 11x17 PAPER)
01/18/19
Mike Sheeks