Loading...
HomeMy WebLinkAboutCDR - Front Porch RealtyELECTRONICALLY FiLE YOUR PROJEcT wiTH STATE OF INOiANA at_http. This on-line filing is through a secure site, you can use it to submit your project information, pay the fees, and upload your project plans. Use Internet Browser to View this report, other browsers are Prot cornpiatible to view this reparf Project number CONSTRUCTION DESIGN RELEASE 405409 State Form 411191 (R9/5-98) Construction type Report Printed on: January 29, 2019 Indiana Department of Homeland Security DIVISION OF FIRE & BUILDING SAFETY PLAN REVIEW DIVISION 402 W. Washington St., Room E245 Indianapolis, IN 46204 To: Owner / Architect I Engineer Design Point Architects INDIANA 02 Available At Your Local Licenca Branch SUPPORT HOOSIER SAFETY GEORGE FREDRICK SMALL AR19600042 4676 St. John Circle Zionsville IN 46077 11-S, SPK Scope of release ARCH ELEC MECH PLUM Type of release Standard Project name Front Porch Real Estate Street address 3105 E 98th St WA Release date 01/29/19 Occupancy classification B, REM 2=1 Fax & e-mail: 3172898007, gsmall@designpointarchitects.com iND,IANAPOLIS MARION The plans, specifications and application submitted for the above referenced project have been reviewed for compliance with the applicable rules of the Fire Prevention and Building Safety Commission. The project is released for construction subject to, but not necessarily limited to, the conditions listed below, THIS IS NOT A BUILDiNG PERMIT. All required local permits and licenses must be obtained prior to beginning construction work. All construction work must be, in full compliance with all applicable State rules. Any changes in the released plans and/or specifications must be filed with and released by this Office before any work is altered. This release may be suspended or revoked if it is determined to be issued in error, in violation of any rules of the Commission or if it is based on incorrect or insufficient information. This release shall expire by (imitation, and become null and void, if the work authorized is not commenced within one (1) year from the above date. CONDITIONS: Note :(A`IA & At 13): In accordance with the affidavit sworn under penalties of perjury in the application for construction design release the plans and specifications filed in conjunction with this project shall comply with all of the applicable rules and laws of Fire Prevention and Building Safety Commission. Providing false information constitutes an act of perjury, which is a Class D felony punishable by a prison term and a fine up to $10,000. In accordance with Section 19 of the General Administrative Rules (675 IAC 12-6-19) a complete set of plans and specifications that conform exactly to the design that was released by the office of the state building commissioner shall be maintained on the construction jobsite as well as a copy of the design release. This project has been reviewed under the 2014 Indiana Building Code, 2014 Indiana Fire Code, 2009 Indiana Electrical Code, 2012 Indiana Plumbing Code, 2014 Indiana Mechanical Code, 2014 Indiana Fuel Gas Code, 2010 Indiana Accessibility Chapter 11 (ICC Al 17.1 2009), and the 2010 Indiana Energy Conservation Code (ASHRAE 90.1 2007) 4GO412AE The proposed building, addition, or remodel shall not put the existing building in noncompliance or into further noncompliance in accordance with 675 IAC 12-4-12. 4GO603AF Detailed plans and specifications for the revised fire suppression system shall be filed with the required, application and appropriate fees in accordance with 675 IAC 12-6- 3(a), 675 IAC 12-6- 7(g)(17), and 675 IAC 13-1-8. (N.F.P.A. 13) 14B29021DF The minimum number of required drinking fountains shall comply with Section 2902, Table 2902.1 and Chapter 11, IBC (675 IAC 13-2.6). AREL Pursuant to 675 IAC 12-6-21, the issuance of a design release does not relieve the owner from required compliance with all applicable rules of the commission, even if noncompliant conditions appear in the plans and specifications that have been filed with the division. The owner is responsible for correcting any and all areas of noncompliance even if they are discovered subsequent to the issuing of this design release. Please be advised that if an administrative review of this action is desired, a written petition for review must be flied at the above address with the Fire Prevention and Building Safety Commission identifying the matter for which a review is sought no later than eighteen (118) days from the above - stated date, unless the eighteenth day falls on a Saturday, a Sunday, a legal holiday under State statute, or a day in which the Department of Fire and Building Services is closed during normal business hours. In the latter case, the filing deadline will be the first working day thereafter. If you choose to petition, and the before -mentioned procedures are followed, your petition for review will be granted, and an administrative proceeding will be conducted by an administrative law judge of the Fire Prevention and Building Safety Commission. If a petition for review is not flied, this Order will be final, and you must comply with its requirements. Page 1/2 ELECTRONICALLY FILE YOUR PROJECTWITH STATE OF INDIANA at litt v/dhs/2650.htrn, I'm �1_//y_LVK___[ rL220— __ This on-line filing Is through a secure site you can use it to subrnit your project information, pay the fees and upload your project plans, Use Internot Browser to View this report, other browsers are not cornpagible to view fMs report Code review official REX MAYS rmays@dhs.in.gov Director, Division of Fire and Building Safety Address (name,title of local official, street,city,state and ZIP code Manager of Bldg Code Analysis Michael Bennett Division of Compliance 1200 Madison Ave Suite 100 Indianapolis, IN 46204 Fax& e-mail: 3173278475, planreview.cIassl @indy.gov Elm