Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
I35814824.103_Woods_at_Shelborne
16023 Swingley Ridge Rd Chesterfield, MO 63017 314-434-1200 MiTek USA, Inc. Re: The truss drawing(s) referenced below have been prepared by MiTek USA, Inc. under my direct supervision based on the parameters provided by ProBuild (CarterLee Bldg Components). January 14,2019 Liu, Xuegang Pages or sheets covered by this seal: I35814824 thru I35814882 My license renewal date for the state of Indiana is July 31, 2020. 103_Woods_at_Shelborne Truss Engineer's responsibility is solely for design of individual trusses based upon design parameters shown on referenced truss drawings. Parameters have not been verified as appropriate for any use. Any location identification specified is for file reference only and has not been used in preparing design. Suitability of truss designs for any particular building is the responsibility of the building designer, not the Truss Engineer, per ANSI/TPI-1, Chapter 2. IMPORTANT NOTE: 103 Woods at Shelborne 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss GE01 Truss Type GABLE Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814824 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:02:32 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-0j9FOV_xrhrseQHOJKEG4z5KQdPgpaem9A4vOKzwNg5 Scale = 1:78.6 Sheet Front Full Sheathing 1 Ply 7/16OSB8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 60 59 58 57 56 55 54 53 52 51 50 494847 46 454443 42 41 40 39 38 37 36 35 34 33 32 3x4 3x4 5x6 5x6 5x6 3x4 3x4 3x6 3x6 35-11-035-11-0 -1-0-0 1-0-0 17-11-8 17-11-8 35-11-0 17-11-8 36-11-0 1-0-0 1-1-013-0-81-1-08.00 12 Plate Offsets (X,Y)-- [5:0-1-8,0-0-0], [6:0-2-12,0-3-4], [6:0-0-0,0-1-12], [26:0-2-12,0-3-4], [26:0-0-0,0-1-12], [27:0-1-8,0-0-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.33 0.16 0.18 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.01 0.01 (loc) 31 31 32 l/defl n/r n/r n/a L/d 180 120 n/a PLATES MT20 Weight: 762 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud OTHERS 2x3 SPF No.2 *Except* 16-46,15-47,14-49,17-45,18-43: 2x4 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 16-46, 15-47, 14-49, 13-50, 12-51, 11-52, 17-45, 18-43, 19-42, 20-41, 21-40 REACTIONS.All bearings 35-11-0. (lb) - Max Horz 60=308(LC 5) Max Uplift All uplift 100 lb or less at joint(s) 32, 49, 50, 51, 52, 53, 54, 55, 56, 57, 58, 43, 42, 41, 40, 39, 38, 37, 36, 35, 34 except 60=-164(LC 4), 59=-177(LC 5), 33=-131(LC 4) Max Grav All reactions 250 lb or less at joint(s) 60, 32, 46, 47, 49, 50, 51, 52, 53, 54, 55, 56, 57, 58, 59, 45, 43, 42, 41, 40, 39, 38, 37, 36, 35, 34, 33 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 13-14=-22/267, 14-15=-24/306, 15-16=-24/304, 16-17=-24/304, 17-18=-24/306, 18-19=-22/267 NOTES-(10-11) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) All plates are 2x4 MT20 unless otherwise indicated. 5) Gable requires continuous bottom chord bearing. 6) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 7) Gable studs spaced at 1-4-0 oc. 8) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 32, 49, 50, 51, 52, 53, 54, 55, 56, 57, 58, 43, 42, 41, 40, 39, 38, 37, 36, 35, 34 except (jt=lb) 60=164, 59=177, 33=131. 10) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 11) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss GE02 Truss Type GABLE Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814825 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:02:34 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-y5H?pB?CNI5atkQnRlGk9OAhQQ4MHT93dUZ?SDzwNg3 Scale = 1:77.5 Sheet Front Full Sheathing 1 Ply 7/16OSB8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 58 57 56 55 54 53 52 51 50 49 48 474645 44 4342 41 40 39 38 37 36 35 34 33 32 31 30 3x4 3x4 5x6 5x6 5x6 3x4 3x4 3x6 3x6 35-11-035-11-0 17-11-8 17-11-8 35-11-0 17-11-8 1-1-013-0-81-1-08.00 12 Plate Offsets (X,Y)-- [4:0-1-8,0-0-0], [5:0-2-12,0-3-4], [5:0-0-0,0-1-12], [25:0-2-12,0-3-4], [25:0-0-0,0-1-12], [26:0-1-8,0-0-0], [30:Edge,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.29 0.14 0.18 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.01 (loc) - - 30 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 759 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 OTHERS 2x3 SPF No.2 *Except* 15-44,14-45,13-47,16-43,17-41: 2x4 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 15-44, 14-45, 13-47, 12-48, 11-49, 10-50, 16-43, 17-41, 18-40, 19-39, 20-38 REACTIONS.All bearings 35-11-0. (lb) - Max Horz 58=-306(LC 4) Max Uplift All uplift 100 lb or less at joint(s) 30, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56, 41, 40, 39, 38, 37, 36, 35, 34, 33, 32 except 58=-156(LC 4), 57=-167(LC 5), 31=-129(LC 7) Max Grav All reactions 250 lb or less at joint(s) 58, 30, 44, 45, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56, 57, 43, 41, 40, 39, 38, 37, 36, 35, 34, 33, 32, 31 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 12-13=-39/266, 13-14=-41/305, 14-15=-39/303, 15-16=-39/303, 16-17=-41/305, 17-18=-39/266 NOTES-(10-11) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) All plates are 2x4 MT20 unless otherwise indicated. 5) Gable requires continuous bottom chord bearing. 6) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 7) Gable studs spaced at 1-4-0 oc. 8) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 30, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56, 41, 40, 39, 38, 37, 36, 35, 34, 33, 32 except (jt=lb) 58=156, 57=167, 31=129. 10) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 11) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss GE03 Truss Type GABLE Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814826 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:02:35 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-QHrN1X0q8cDQVu?z_SnzicjufqRp0yDCr8JZ_fzwNg2 Scale = 1:32.4 Sheet Front Full Sheathing 1 Ply 7/16OSB8 1 2 3 4 5 6 7 8 9 10 11 20 19 18 17 16 15 14 13 12 2x4 2x4 4x6 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 10-11-010-11-0 -1-0-0 1-0-0 5-5-8 5-5-8 10-11-0 5-5-8 11-11-0 1-0-0 1-2-05-3-21-2-09.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.13 0.06 0.06 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.01 0.00 (loc) 11 11 12 l/defl n/r n/r n/a L/d 180 120 n/a PLATES MT20 Weight: 120 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.All bearings 10-11-0. (lb) - Max Horz 20=-128(LC 4) Max Uplift All uplift 100 lb or less at joint(s) 20, 12, 17, 18, 19, 15, 14, 13 Max Grav All reactions 250 lb or less at joint(s) 20, 12, 16, 17, 18, 19, 15, 14, 13 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(9-10) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Gable requires continuous bottom chord bearing. 5) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 6) Gable studs spaced at 1-4-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 20, 12, 17, 18, 19, 15, 14, 13. 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss GE04 Truss Type GABLE Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814827 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:02:36 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-uUOmEt1SvwLH61a9Y9ICEpF30EnqlObM4o26X5zwNg1 Scale = 1:39.4 Sheet FrontFull Sheathing 1 Ply 7/16OSB8 1 2 3 4 5 6 7 8 9 10 11 12 13 24 23 22 21 20 19 18 17 16 15 14 2x4 3x4 4x6 2x4 3x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 13-11-013-11-0 -1-0-0 1-0-0 6-11-8 6-11-8 13-11-0 6-11-8 14-11-0 1-0-0 1-2-06-4-101-2-09.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.16 0.08 0.12 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.01 0.00 (loc) 13 13 14 l/defl n/r n/r n/a L/d 180 120 n/a PLATES MT20 Weight: 172 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.All bearings 13-11-0. (lb) - Max Horz 24=-154(LC 4) Max Uplift All uplift 100 lb or less at joint(s) 24, 14, 20, 21, 22, 23, 18, 17, 16, 15 Max Grav All reactions 250 lb or less at joint(s) 24, 14, 19, 20, 21, 22, 23, 18, 17, 16, 15 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(9-10) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Gable requires continuous bottom chord bearing. 5) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 6) Gable studs spaced at 1-4-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 24, 14, 20, 21, 22, 23, 18, 17, 16, 15. 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss GE05 Truss Type GABLE Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814828 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:02:39 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-J34usu3KCrjszVJkDIsvsStZoRlqyZYommHm7QzwNg_ Scale = 1:70.4 Sheet Front Right Option 9-1-8 1 Ply 7/16OSB8 1 2 3 4 5 6 7 8 9 10 11 12 26 25 24 23 22 21 20 18 17 16 15 14 13 30 19 3x6 4x6 3x6 2x4 2x4 3x6 2x4 2x4 3x6 3x8 4x8 3x8 3x6 4x8 3x6 3x8 3x6 3x4 3x6 3x6 2x4 2x4 3x6 2x4 3x6 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 1-3-0 1-3-0 2-3-8 1-0-8 7-5-8 5-2-0 12-7-8 5-2-0 14-11-0 2-3-8 16-1-8 1-2-8 16-9-3 0-7-11 20-10-13 4-1-11 25-3-0 4-4-3 -1-0-01-0-0 1-3-01-3-0 2-3-81-0-8 7-3-74-11-15 7-5-80-2-1 12-7-85-2-0 16-9-34-1-11 20-10-134-1-11 25-3-04-4-3 26-3-01-0-0 1-2-010-7-101-2-00-8-09.00 12 Plate Offsets (X,Y)-- [21:0-4-8,0-2-4], [23:0-4-8,0-2-8], [27:0-1-15,0-0-8], [28:0-1-3,0-0-14], [30:0-1-9,0-1-0], [44:0-1-8,0-1-0], [46:0-1-8,0-1-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.25 0.38 0.87 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.03 -0.08 0.03 (loc) 22-23 22-23 13 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 355 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 7-22: 2x4 SPF No.2, 2-26,11-13: 2x4 SPF-S Stud OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 7-20 JOINTS 1 Brace at Jt(s): 30 REACTIONS.All bearings 10-7-8 except (jt=length) 26=0-3-8, 19=0-3-8. (lb) - Max Horz 26=253(LC 5) Max Uplift All uplift 100 lb or less at joint(s) 26, 13, 18 except 15=-204(LC 2) Max Grav All reactions 250 lb or less at joint(s) 17, 16, 19 except 26=733(LC 1), 13=289(LC 11), 18=722(LC 1), 14=378(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-493/58, 3-4=-822/75, 4-6=-715/85, 6-7=-706/226, 7-8=-343/147, 2-26=-696/87 BOT CHORD 25-26=-229/263, 22-23=-212/732 WEBS 7-21=-262/58, 3-25=-517/60, 23-25=-199/408, 3-23=-95/576, 6-22=-316/193, 22-30=-181/583, 7-30=-182/585, 8-21=-34/363, 8-18=-688/64, 2-25=0/384 NOTES-(7-8) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Gable studs spaced at 1-4-0 oc. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 26, 13, 18 except (jt=lb) 15=204. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss GE06 Truss Type GABLE Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814829 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:02:40 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-nFeG4E4zz8rjbfuxn?N8PfQl7r8qhCsy?Q0KfszwNfz Scale = 1:37.9 Sheet FrontFull Sheathing 1 Ply 7/16OSB8 1 2 3 4 5 6 7 8 9 10 11 12 13 24 23 22 21 20 19 18 17 16 15 14 2x4 3x4 4x6 2x4 3x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 13-3-013-3-0 -1-0-0 1-0-0 6-7-8 6-7-8 13-3-0 6-7-8 14-3-0 1-0-0 1-2-06-1-101-2-09.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.15 0.07 0.10 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.01 0.00 (loc) 13 13 14 l/defl n/r n/r n/a L/d 180 120 n/a PLATES MT20 Weight: 160 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.All bearings 13-3-0. (lb) - Max Horz 24=148(LC 5) Max Uplift All uplift 100 lb or less at joint(s) 24, 14, 20, 21, 22, 18, 17, 16, 15 except 23=-107(LC 5) Max Grav All reactions 250 lb or less at joint(s) 24, 14, 19, 20, 21, 22, 23, 18, 17, 16, 15 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(9-10) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Gable requires continuous bottom chord bearing. 5) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 6) Gable studs spaced at 1-4-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 24, 14, 20, 21, 22, 18, 17, 16, 15 except (jt=lb) 23=107. 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss GE07 Truss Type GABLE Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814830 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:02:41 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-FRCfHa5bkSzaDpT7LjuNxtzxaFVmQgh5E4mtBJzwNfy Scale = 1:13.9 Sheet Front Full Sheathing 1 Ply 7/16OSB8 1 2 3 5 4 2x4 2x4 2x4 2x4 -1-0-0 1-0-0 1-4-0 1-4-0 1-2-02-2-09.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.11 0.03 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 -0.00 0.00 (loc) 1 1 4 l/defl n/r n/r n/a L/d 180 120 n/a PLATES MT20 Weight: 11 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud *Except* 3-4: 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 1-4-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.(lb/size)5=148/1-4-0, 4=7/1-4-0 Max Horz 5=60(LC 5) Max Uplift 5=-38(LC 6), 4=-42(LC 5) Max Grav 5=148(LC 1), 4=48(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 3) Gable requires continuous bottom chord bearing. 4) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 5) Gable studs spaced at 1-4-0 oc. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 4. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss GE08 Truss Type GABLE Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814831 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:02:42 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-jem1Vw5DVm5Rqy2JvQPcU4V5gfqq97KESkVRjlzwNfx Scale = 1:21.3 1 2 3 4 5 6 11 10 9 8 7 3x6 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 -1-0-0 1-0-0 10-0-0 10-0-0 0-8-83-7-83.50 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.15 0.10 0.04 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.01 0.00 (loc) 1 1 7 l/defl n/r n/r n/a L/d 180 120 n/a PLATES MT20 Weight: 32 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud *Except* 6-7: 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 10-0-0. (lb) - Max Horz 11=113(LC 5) Max Uplift All uplift 100 lb or less at joint(s) 11, 7, 8, 9, 10 Max Grav All reactions 250 lb or less at joint(s) 11, 7, 8, 9 except 10=291(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 3) Gable requires continuous bottom chord bearing. 4) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 5) Gable studs spaced at 2-0-0 oc. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 11, 7, 8, 9, 10. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss GE09 Truss Type GABLE Qty 2 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814832 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:02:42 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-jem1Vw5DVm5Rqy2JvQPcU4V61frv97wESkVRjlzwNfx Scale = 1:15.1 Sheet Front Full Sheathing 1 Ply 7/16OSB8 1 2 3 5 4 2x4 2x4 2x4 2x4 -1-0-0 1-0-0 2-0-0 2-0-0 1-1-02-5-08.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.13 0.04 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 0.00 (loc) 1 1 4 l/defl n/r n/r n/a L/d 180 120 n/a PLATES MT20 Weight: 16 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud *Except* 3-4: 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 2-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=161/2-0-0, 4=47/2-0-0 Max Horz 5=70(LC 5) Max Uplift 5=-30(LC 6), 4=-32(LC 5) Max Grav 5=161(LC 1), 4=49(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 3) Gable requires continuous bottom chord bearing. 4) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 5) Gable studs spaced at 1-4-0 oc. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 4. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss J01 Truss Type Jack-Open Qty 8 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814833 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:02:43 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-BqKPiG6rG3EIS6dWS8wr0I2GE2BluaAOhOF_FBzwNfw Scale = 1:15.1 1 2 5 3 42x4 3x4 2-0-02-0-0 -1-0-0 1-0-0 2-0-0 2-0-0 1-1-02-5-01-11-132-5-08.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.16 0.06 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 -0.00 (loc) 5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 7 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 2-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=164/0-3-8, 3=37/Mechanical, 4=15/Mechanical Max Horz 5=84(LC 6) Max Uplift 5=-11(LC 6), 3=-31(LC 6), 4=-6(LC 6) Max Grav 5=164(LC 1), 3=37(LC 1), 4=34(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 3, 4. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss J02 Truss Type Jack-Open Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814834 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:02:44 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-f0tnwc7T1NM94GBi0rR4ZVbQiSWqd1QXw2_XoezwNfv Scale = 1:15.0 1 2 5 3 4 2x4 3x4 2-5-152-5-8 -1-6-1 1-6-1 2-5-15 2-5-15 1-2-02-4-155.98 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.24 0.07 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 -0.00 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 9 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 2-5-15 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=226/0-4-7, 3=40/Mechanical, 4=16/Mechanical Max Horz 5=85(LC 6) Max Uplift 5=-44(LC 6), 3=-25(LC 6) Max Grav 5=226(LC 1), 3=40(LC 1), 4=41(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 3. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss J03 Truss Type Jack-Open Structural Gable Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814835 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:02:46 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-bP?YKH9jY_ctJaL48GUYewgmCGCc5xwqNMTesWzwNft Scale = 1:15.0 1 2 5 3 4 2x4 3x4 2-7-102-7-10 -1-4-6 1-4-6 2-7-10 2-7-10 1-1-32-4-150-4-102-0-42-4-155.98 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.18 0.05 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 -0.00 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 9 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 2-7-10 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)3=49/Mechanical, 5=216/0-8-4, 4=19/Mechanical Max Horz 5=56(LC 6) Max Uplift 3=-26(LC 6), 5=-44(LC 6) Max Grav 3=49(LC 1), 5=216(LC 1), 4=44(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(7-8) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 3) Gable studs spaced at 2-0-0 oc. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3, 5. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss M01 Truss Type Monopitch Qty 4 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814836 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:02:47 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-4bZwYd9MJIkkxkwHhz?nB7DrjgTJqOe_c0DBOzzwNfs Scale = 1:16.7 1 2 3 5 4 2x4 3x8 2x4 6-4-06-4-0 -1-0-0 1-0-0 6-4-0 6-4-0 0-8-82-6-110-3-83.50 12 Plate Offsets (X,Y)-- [4:0-1-15,0-0-10], [5:0-4-2,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.51 0.34 0.03 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.06 -0.18 0.00 (loc) 4-5 4-5 l/defl >999 >403 n/a L/d 240 180 n/a PLATES MT20 Weight: 18 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-5: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=319/0-3-8, 4=237/0-1-8 Max Horz 5=76(LC 6) Max Uplift 5=-48(LC 4), 4=-31(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-5=-269/153 NOTES-(7-8) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Bearing at joint(s) 4 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate at joint(s) 4. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 4. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss M02 Truss Type Monopitch Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814837 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:02:47 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-4bZwYd9MJIkkxkwHhz?nB7DrNgTDqOe_c0DBOzzwNfs Scale: 3/4"=1' 1 2 4 3 3x8 2x4 2x4 6-4-06-4-0 6-4-0 6-4-0 0-8-82-6-110-3-83.50 12 Plate Offsets (X,Y)-- [1:0-4-2,0-1-8], [3:0-1-14,0-0-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.54 0.35 0.03 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.06 -0.19 0.00 (loc) 3-4 3-4 l/defl >999 >393 n/a L/d 240 180 n/a PLATES MT20 Weight: 16 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-4: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)4=243/0-3-8, 3=243/0-1-8 Max Horz 4=62(LC 6) Max Uplift 4=-9(LC 4), 3=-33(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(7-8) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Bearing at joint(s) 3 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate at joint(s) 3. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 4, 3. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss M03 Truss Type Monopitch Qty 7 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814838 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:02:48 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-Yo7IlzA_4csaZtVTFhW0jLl7W3uJZrQ7rgylxPzwNfr Scale = 1:15.1 1 2 3 5 4 2x4 2x4 2x4 2x4 2-0-02-0-0 -1-0-0 1-0-0 2-0-0 2-0-0 1-1-02-5-08.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.13 0.04 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 0.00 (loc) 5 5 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 9 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-5: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 2-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)4=47/Mechanical, 5=161/0-3-8 Max Horz 5=70(LC 5) Max Uplift 4=-32(LC 5), 5=-30(LC 6) Max Grav 4=49(LC 4), 5=161(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 4, 5. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss M04 Truss Type Monopitch Qty 6 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814839 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:02:50 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-UAF2AfCEcD6IoBfsN6YUpmrTJtat1lvQI_Rs?HzwNfp Scale = 1:13.9 1 2 3 5 4 2x4 2x4 2x4 2x4 1-4-01-4-0 -1-0-0 1-0-0 1-4-0 1-4-0 1-2-02-2-01-10-80-3-82-2-09.00 12 Plate Offsets (X,Y)-- [4:0-1-13,0-0-10] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.11 0.03 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 0.00 (loc) 5 5 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 7 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-5: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 1-4-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.(lb/size)5=148/0-3-8, 4=7/0-1-8 Max Horz 5=60(LC 5) Max Uplift 5=-38(LC 6), 4=-42(LC 5) Max Grav 5=148(LC 1), 4=48(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Bearing at joint(s) 4 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 4) Provide mechanical connection (by others) of truss to bearing plate at joint(s) 4. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 4. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss M05 Truss Type MONOPITCH Qty 16 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814840 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:02:50 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-UAF2AfCEcD6IoBfsN6YUpmrPUtYW1ekQI_Rs?HzwNfp Scale = 1:22.6 1 2 3 4 7 6 5 6x6 2x4 3x8 3x6 2x4 5-0-05-0-0 10-0-05-0-0 -1-0-0 1-0-0 5-0-0 5-0-0 10-0-0 5-0-0 0-8-83-7-80-3-83.50 12 Plate Offsets (X,Y)-- [4:0-2-3,0-1-8], [5:0-1-14,0-0-10], [7:0-1-12,0-0-0], [7:0-3-0,0-4-4] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.35 0.18 0.46 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.04 -0.07 0.00 (loc) 5-6 5-6 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 37 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-7: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)7=463/0-3-8, 5=386/0-1-8 Max Horz 7=109(LC 6) Max Uplift 7=-136(LC 4), 5=-131(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-647/397, 3-4=-657/459, 2-7=-409/239 BOT CHORD 6-7=-298/274 WEBS 4-5=-343/239, 3-6=-324/170, 4-6=-554/704, 2-6=-162/311 NOTES-(7-8) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed; porch left exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Bearing at joint(s) 5 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate at joint(s) 5. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 7=136, 5=131. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss MG01 Truss Type Monopitch Girder Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814841 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:02:51 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-yMoRO?CsNXE9QLE2wp4jLzNUdHimmC9ZXeBPYkzwNfo Scale = 1:16.6 1 2 3 4 5 2x4 2x4 3x4 3x8 6-4-06-4-0 6-4-0 6-4-0 0-8-82-6-113.50 12 Plate Offsets (X,Y)-- [1:0-0-0,0-1-3] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.71 0.95 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.13 -0.33 0.00 (loc) 1-3 1-3 3 l/defl >569 >219 n/a L/d 240 180 n/a PLATES MT20 Weight: 25 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x6 SP 2400F 2.0E WEBS 2x4 SPF-S Stud WEDGE Left: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-4-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 4-4-8 oc bracing. REACTIONS.(lb/size)3=1750/Mechanical, 1=1031/0-3-8 Max Horz 1=71(LC 4) Max Uplift 3=-101(LC 5), 1=-57(LC 3) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(7-8) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1 except (jt=lb) 3=101. 5) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 763 lb down and 40 lb up at 2-0-12, and 763 lb down and 40 lb up at 4-0-12, and 772 lb down and 35 lb up at 6-2-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 6) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-2=-60, 1-3=-20 Concentrated Loads (lb) Vert: 3=-772(B) 4=-763(B) 5=-763(B) January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss T01 Truss Type Common Qty 8 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814842 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:02:53 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-ulwBohE6v8UtffNR2E6BQOTo44VOE_Ys_ygWcczwNfm Scale = 1:82.7 1 2 3 4 5 6 7 8 9 10 11 20 19 18 17 16 15 14 13 12 3x6 5x6 3x6 3x6 3x6 3x8 3x6 3x4 3x6 3x6 3x6 3x4 3x6 3x6 6x6 3x6 6x6 3x6 6-1-86-1-8 12-0-85-11-0 17-11-85-11-0 23-10-85-11-0 29-9-85-11-0 35-11-06-1-8 -1-0-0 1-0-0 6-1-8 6-1-8 12-0-8 5-11-0 17-11-8 5-11-0 23-10-8 5-11-0 29-9-8 5-11-0 35-11-0 6-1-8 36-11-0 1-0-0 1-1-013-0-81-1-08.00 12 Plate Offsets (X,Y)-- [13:0-2-8,0-1-8], [19:0-2-8,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.84 0.43 0.46 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.08 -0.22 0.08 (loc) 16 14-16 12 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 175 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 6-16,7-16,5-16: 2x4 SPF No.2, 2-20,10-12: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-2 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 7-16, 5-16 REACTIONS.(lb/size)20=1494/0-3-8, 12=1494/0-3-8 Max Horz 20=308(LC 5) Max Uplift 20=-95(LC 6), 12=-95(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-1900/158, 3-5=-1667/210, 5-6=-1314/255, 6-7=-1314/255, 7-9=-1667/210, 9-10=-1900/158, 2-20=-1422/162, 10-12=-1422/162 BOT CHORD 19-20=-277/394, 18-19=-95/1496, 16-18=-7/1306, 14-16=0/1306, 13-14=-3/1496, 12-13=-21/302 WEBS 6-16=-158/990, 7-16=-551/165, 7-14=-2/355, 9-14=-271/114, 5-16=-551/165, 5-18=-2/355, 3-18=-271/114, 2-19=0/1206, 10-13=0/1206 NOTES-(5-6) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 20, 12. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss T02 Truss Type Common Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814843 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:02:55 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-r82xDMGNRlkbuyXp9f8fVpY6PuBqiu19SF9dhVzwNfk Scale = 1:82.0 1 2 3 4 5 6 7 8 9 10 19 18 17 16 15 14 13 12 11 3x6 5x6 3x6 3x6 3x6 3x8 3x6 3x4 3x6 3x6 3x6 3x4 3x6 3x6 3x6 6x6 6x6 3x6 6-1-86-1-8 12-0-85-11-0 17-11-85-11-0 23-10-85-11-0 29-9-85-11-0 35-11-06-1-8 6-1-8 6-1-8 12-0-8 5-11-0 17-11-8 5-11-0 23-10-8 5-11-0 29-9-8 5-11-0 35-11-0 6-1-8 36-11-0 1-0-0 1-1-013-0-81-1-08.00 12 Plate Offsets (X,Y)-- [12:0-2-8,0-1-8], [18:0-2-8,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.98 0.43 0.46 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.08 -0.22 0.08 (loc) 15 13-15 11 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 173 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 5-15,6-15,4-15: 2x4 SPF No.2, 9-11,1-19: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-2 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 6-15, 4-15 REACTIONS.(lb/size)19=1424/0-3-8, 11=1495/0-5-8 Max Horz 19=-317(LC 4) Max Uplift 19=-59(LC 6), 11=-95(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-1908/159, 2-4=-1671/211, 4-5=-1316/255, 5-6=-1316/255, 6-8=-1669/211, 8-9=-1902/158, 9-11=-1423/163, 1-19=-1352/125 BOT CHORD 18-19=-273/399, 17-18=-96/1503, 15-17=-7/1309, 13-15=0/1307, 12-13=-3/1497, 11-12=-21/302 WEBS 5-15=-158/992, 6-15=-551/165, 6-13=-2/355, 8-13=-271/114, 4-15=-554/165, 4-17=-2/357, 2-17=-276/115, 9-12=0/1207, 1-18=0/1175 NOTES-(5-6) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 19, 11. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss T03 Truss Type Common Qty 7 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814844 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:02:56 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-JKcKRiG?C3sSW66?jMfu214H9IX3RLHIgvvADxzwNfj Scale = 1:82.0 1 2 3 4 5 6 7 8 9 10 19 18 17 16 15 14 13 12 11 3x6 5x6 3x6 3x6 3x6 3x8 3x6 3x4 3x6 3x6 3x6 3x4 3x6 3x6 6x6 3x6 6x6 3x6 6-1-86-1-8 12-0-85-11-0 17-11-85-11-0 23-10-85-11-0 29-9-85-11-0 35-11-06-1-8 -1-0-0 1-0-0 6-1-8 6-1-8 12-0-8 5-11-0 17-11-8 5-11-0 23-10-8 5-11-0 29-9-8 5-11-0 35-11-0 6-1-8 1-1-013-0-81-1-08.00 12 Plate Offsets (X,Y)-- [12:0-2-8,0-1-8], [18:0-2-8,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.98 0.43 0.46 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.08 -0.22 0.08 (loc) 15 15-17 11 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 173 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 6-15,7-15,5-15: 2x4 SPF No.2, 2-19,10-11: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-2 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 7-15, 5-15 REACTIONS.(lb/size)19=1495/0-3-8, 11=1424/Mechanical Max Horz 19=317(LC 5) Max Uplift 19=-95(LC 6), 11=-59(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-1902/158, 3-5=-1669/211, 5-6=-1316/255, 6-7=-1316/255, 7-9=-1671/211, 9-10=-1908/159, 2-19=-1423/163, 10-11=-1352/125 BOT CHORD 18-19=-285/383, 17-18=-108/1497, 15-17=-20/1307, 13-15=0/1309, 12-13=-38/1503, 11-12=-55/340 WEBS 6-15=-158/992, 7-15=-554/165, 7-13=-2/357, 9-13=-276/115, 5-15=-551/165, 5-17=-2/355, 3-17=-271/114, 2-18=0/1207, 10-12=0/1175 NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 19, 11. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss T04 Truss Type ROOF SPECIAL Qty 4 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814845 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:02:59 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-jvHS3kJtV_F1NaraOVDbgfis4VVkeedlNt7qqGzwNfg Scale = 1:82.4 1 2 3 4 5 6 7 8 9 18 17 16 15 14 13 12 11 10 3x6 5x6 3x6 5x8 2x4 2x4 3x6 3x8 5x8 3x8 3x4 3x6 3x8 3x6 3x4 3x6 3x6 6x6 3x4 4-4-84-4-8 8-10-134-6-5 13-5-34-6-5 17-11-84-6-5 23-10-85-11-0 29-9-85-11-0 35-11-06-1-8 4-4-8 4-4-8 8-10-13 4-6-5 13-5-3 4-6-5 17-11-8 4-6-5 23-10-8 5-11-0 29-9-8 5-11-0 35-11-0 6-1-8 0-5-012-4-813-0-81-1-00-8-08.00 12 Plate Offsets (X,Y)-- [1:Edge,0-2-13], [9:Edge,0-1-12], [11:0-2-8,0-1-8], [16:0-2-8,0-1-8], [18:0-5-0,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-AS 0.74 0.62 0.74 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.41 -1.07 0.08 (loc) 17 17 10 l/defl >999 >402 n/a L/d 240 180 n/a PLATES MT20 Weight: 182 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 *Except* 13-17: 2x4 SPF 2100F 1.8E WEBS 2x3 SPF No.2 *Except* 4-14,5-14,6-14: 2x4 SPF No.2, 9-10: 2x4 SPF-S Stud WEDGE Left: 2x4 SP No.3 BRACING- TOP CHORD Structural wood sheathing directly applied, except end verticals. BOT CHORD Structural wood sheathing directly applied. WEBS 1 Row at midpt 4-14, 6-14 REACTIONS.(lb/size)1=1438/Mechanical, 10=1424/Mechanical Max Horz 1=-293(LC 4) Max Uplift 1=-65(LC 6), 10=-60(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-2156/145, 2-4=-1570/239, 4-5=-1280/256, 5-6=-1318/252, 6-8=-1671/208, 8-9=-1906/154, 9-10=-1358/121 BOT CHORD 1-18=-50/1671, 15-16=-44/1471, 14-15=0/1222, 12-14=0/1310, 11-12=-36/1505, 10-11=-37/254 WEBS 16-18=-45/1487, 2-18=-9/333, 2-15=-459/104, 4-15=-70/400, 4-14=-525/157, 5-14=-171/1024, 6-14=-557/169, 6-12=-3/354, 8-12=-280/114, 9-11=-6/1264 NOTES-(7-8) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 10. 6) This truss design requires that a minimum of 7/16" structural wood sheathing be applied directly to the top chord and 1/2" gypsum sheetrock be applied directly to the bottom chord. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss T05 Truss Type Roof Special Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814846 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:00 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-B5rqG4JVFINt?kQnyCkqCtFz5vs4N7JubXtNMizwNff Scale = 1:82.4 1 2 3 4 5 6 7 8 9 10 19 18 17 16 15 14 13 12 11 3x6 5x6 3x6 5x8 2x4 2x4 3x6 3x8 5x8 3x8 3x4 3x6 3x8 3x6 3x4 3x6 3x6 3x6 6x6 4-4-84-4-8 8-10-134-6-5 13-5-34-6-5 17-11-84-6-5 23-10-85-11-0 29-9-85-11-0 35-11-06-1-8 4-4-8 4-4-8 8-10-13 4-6-5 13-5-3 4-6-5 17-11-8 4-6-5 23-10-8 5-11-0 29-9-8 5-11-0 35-11-0 6-1-8 0-5-012-4-813-0-81-1-00-8-08.00 12 Plate Offsets (X,Y)-- [1:Edge,0-4-3], [12:0-2-8,0-1-8], [17:0-2-8,0-1-8], [19:0-5-0,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.98 0.55 0.58 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.09 -0.24 0.09 (loc) 16 13-15 11 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 182 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 5-15,6-15,7-15: 2x4 SPF No.2, 10-11: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 3-8-3 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 5-15, 7-15 REACTIONS.(lb/size)1=1425/Mechanical, 11=1425/0-5-8 Max Horz 1=-293(LC 4) Max Uplift 1=-61(LC 6), 11=-62(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-2298/173, 2-4=-2236/274, 4-5=-1559/231, 5-6=-1283/263, 6-7=-1318/256, 7-9=-1673/211, 9-10=-1909/159, 10-11=-1353/125 BOT CHORD 1-19=-141/1817, 16-17=-55/1428, 15-16=0/1232, 13-15=0/1311, 12-13=-38/1504, 11-12=-55/341 WEBS 17-19=-50/1386, 4-19=-142/630, 4-16=-363/113, 5-16=-43/381, 5-15=-549/159, 6-15=-176/1023, 7-15=-555/165, 7-13=-0/360, 9-13=-276/114, 10-12=0/1174 NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 11. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss T06 Truss Type Common Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814847 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:03 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-cgXzv5MOYDlSsB8MdKHXqVtTO6whaW0KHV52z1zwNfc Scale = 1:82.0 1 2 3 4 5 6 7 8 9 10 19 18 17 16 15 14 13 12 11 3x6 5x6 3x6 3x6 3x6 3x8 3x6 3x4 3x6 3x6 3x6 3x4 3x6 3x6 6x6 3x6 6x6 3x6 6-1-86-1-8 12-0-85-11-0 17-11-85-11-0 23-10-85-11-0 29-9-85-11-0 35-11-06-1-8 -1-0-0 1-0-0 6-1-8 6-1-8 12-0-8 5-11-0 17-11-8 5-11-0 23-10-8 5-11-0 29-9-8 5-11-0 35-11-0 6-1-8 1-1-013-0-81-1-08.00 12 Plate Offsets (X,Y)-- [12:0-2-8,0-1-8], [18:0-2-8,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.98 0.43 0.46 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.08 -0.22 0.08 (loc) 15 15-17 11 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 173 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 6-15,7-15,5-15: 2x4 SPF No.2, 2-19,10-11: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-2 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 7-15, 5-15 REACTIONS.(lb/size)19=1495/0-5-8, 11=1424/Mechanical Max Horz 19=317(LC 5) Max Uplift 19=-95(LC 6), 11=-59(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-1902/158, 3-5=-1669/211, 5-6=-1316/255, 6-7=-1316/255, 7-9=-1671/211, 9-10=-1908/159, 2-19=-1423/163, 10-11=-1352/125 BOT CHORD 18-19=-285/383, 17-18=-108/1497, 15-17=-20/1307, 13-15=0/1309, 12-13=-38/1503, 11-12=-55/340 WEBS 6-15=-158/992, 7-15=-554/165, 7-13=-2/357, 9-13=-276/115, 5-15=-551/165, 5-17=-2/355, 3-17=-271/114, 2-18=0/1207, 10-12=0/1175 NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 19, 11. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss T07 Truss Type Common Qty 6 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814848 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:04 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-4t5L6RM0JWtJTLjYB2omNjQe8WGwJzFUW9rbVTzwNfb Scale = 1:81.3 1 2 3 4 5 6 7 8 9 18 17 16 15 14 13 12 11 10 3x6 5x6 3x6 3x6 3x6 3x8 3x6 3x4 3x6 3x6 3x6 3x4 3x6 3x6 6x6 3x6 6x6 3x6 6-1-86-1-8 12-0-85-11-0 17-11-85-11-0 23-10-85-11-0 29-9-85-11-0 35-11-06-1-8 6-1-8 6-1-8 12-0-8 5-11-0 17-11-8 5-11-0 23-10-8 5-11-0 29-9-8 5-11-0 35-11-0 6-1-8 1-1-013-0-81-1-08.00 12 Plate Offsets (X,Y)-- [11:0-2-8,0-1-8], [17:0-2-8,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.98 0.43 0.46 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.08 -0.22 0.08 (loc) 14 14-16 10 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 172 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 5-14,6-14,4-14: 2x4 SPF No.2, 1-18,9-10: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-3 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 6-14, 4-14 REACTIONS.(lb/size)18=1425/Mechanical, 10=1425/Mechanical Max Horz 18=-305(LC 4) Max Uplift 18=-59(LC 6), 10=-59(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-1909/159, 2-4=-1673/211, 4-5=-1318/255, 5-6=-1318/255, 6-8=-1673/211, 8-9=-1909/159, 1-18=-1353/125, 9-10=-1353/125 BOT CHORD 17-18=-281/387, 16-17=-109/1504, 14-16=-20/1310, 12-14=0/1310, 11-12=-38/1504, 10-11=-55/340 WEBS 5-14=-158/994, 6-14=-554/165, 6-12=-2/357, 8-12=-276/115, 4-14=-554/165, 4-16=-2/357, 2-16=-276/115, 1-17=0/1176, 9-11=0/1176 NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 18, 10. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss T08 Truss Type Common Qty 4 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814849 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:06 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-0FC5X7OGr871jftwJTrFS8V4JKusnsQm_TKiZMzwNfZ Scale = 1:51.9 1 2 3 4 5 6 7 11 10 9 8 4x6 3x6 3x8 3x4 3x4 3x6 5x8 5x8 3x6 9-11-89-11-8 19-11-09-11-8 -1-0-0 1-0-0 5-1-0 5-1-0 9-11-8 4-10-8 14-10-0 4-10-8 19-11-0 5-1-0 20-11-0 1-0-0 1-2-08-7-101-2-09.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.62 0.59 0.54 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.13 -0.33 0.02 (loc) 8-9 8-9 8 l/defl >999 >704 n/a L/d 240 180 n/a PLATES MT20 Weight: 84 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-11,6-8: 2x4 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)11=854/0-3-8, 8=854/0-3-8 Max Horz 11=206(LC 5) Max Uplift 11=-64(LC 6), 8=-64(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-454/59, 3-4=-704/133, 4-5=-704/133, 5-6=-454/59, 2-11=-415/102, 6-8=-415/102 BOT CHORD 9-11=-41/622, 8-9=0/622 WEBS 4-9=-52/482, 3-11=-496/70, 5-8=-496/69 NOTES-(5-6) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 11, 8. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss T09 Truss Type Common Qty 4 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814850 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:07 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-URmUkTPucRFuKoS7sAMU?L2F2kE5WJdwC73F6ozwNfY Scale = 1:51.9 1 2 3 4 5 6 10 9 8 7 4x6 3x6 3x6 3x8 3x4 3x4 3x6 5x8 5x8 9-11-89-11-8 19-11-09-11-8 -1-0-0 1-0-0 5-1-0 5-1-0 9-11-8 4-10-8 14-10-0 4-10-8 19-11-0 5-1-0 1-2-08-7-101-2-09.00 12 Plate Offsets (X,Y)-- [2:0-0-0,0-0-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.62 0.59 0.54 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.13 -0.33 0.02 (loc) 7-8 7-8 7 l/defl >999 >704 n/a L/d 240 180 n/a PLATES MT20 Weight: 82 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-10,6-7: 2x4 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)10=856/0-3-8, 7=783/0-3-8 Max Horz 10=217(LC 5) Max Uplift 10=-64(LC 6), 7=-28(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-454/59, 3-4=-707/133, 4-5=-707/133, 5-6=-467/56, 2-10=-415/102, 6-7=-368/62 BOT CHORD 8-10=-52/624, 7-8=-2/629 WEBS 4-8=-52/483, 3-10=-499/69, 5-7=-461/75 NOTES-(5-6) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 10, 7. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss T10 Truss Type Common Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814851 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:09 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-QquE99Q983Vca6cV_bOy4m7VUXxp_GQDgRYMAhzwNfW Scale = 1:51.9 1 2 3 4 5 9 8 7 6 4x6 6x6 3x6 3x4 3x4 3x8 3x6 5x8 9-11-89-11-8 17-0-07-0-8 -1-0-0 1-0-0 5-1-0 5-1-0 9-11-8 4-10-8 17-0-0 7-0-8 1-2-08-7-103-4-49.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 1.00 0.57 0.33 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.16 -0.40 0.01 (loc) 7-9 7-9 6 l/defl >999 >504 n/a L/d 240 180 n/a PLATES MT20 Weight: 72 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 5-6: 2x4 SPF-S Stud, 2-9: 2x4 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)6=666/Mechanical, 9=739/0-3-8 Max Horz 9=243(LC 5) Max Uplift 6=-27(LC 6), 9=-59(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-480/58, 3-4=-530/124, 4-5=-576/111, 5-6=-604/75, 2-9=-428/104 BOT CHORD 7-9=-100/495 WEBS 4-7=-4/300, 5-7=-28/313, 3-9=-304/58 NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 6, 9. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss T11 Truss Type Roof Special Qty 2 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814852 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:11 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-ND0_arSPgglKpQmu50QQ9BC?PLfPS5QW7l1TFZzwNfU Scale = 1:68.1 1 2 3 4 5 6 7 8 9 10 11 12 22 21 20 19 18 17 16 15 14 13 3x6 4x6 3x6 2x4 2x4 3x6 2x4 3x4 4x6 3x8 4x8 3x4 3x6 5x8 3x6 3x8 3x6 3x6 3x6 4x6 1-3-01-3-02-3-81-0-8 7-5-85-2-0 12-7-85-2-0 16-9-34-1-11 20-10-134-1-11 25-3-04-4-3 -1-0-0 1-0-0 1-3-0 1-3-0 2-3-8 1-0-8 7-5-8 5-2-0 12-7-8 5-2-0 16-9-3 4-1-11 20-10-13 4-1-11 25-3-0 4-4-3 26-3-0 1-0-0 1-2-010-7-101-2-00-8-09.00 12 Plate Offsets (X,Y)-- [11:0-2-14,0-2-0], [14:0-2-8,0-1-8], [17:0-3-8,0-2-8], [19:0-4-8,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.34 0.44 0.62 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.04 -0.13 0.06 (loc) 17 17-18 13 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 124 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-22,11-13: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-10-11 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)22=1066/0-3-8, 13=1066/0-3-8 Max Horz 22=-253(LC 4) Max Uplift 22=-73(LC 6), 13=-73(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-756/77, 3-4=-1303/98, 4-6=-1243/125, 6-7=-912/183, 7-8=-883/188, 8-10=-1047/157, 10-11=-1157/110, 2-22=-1014/111, 11-13=-1014/126 BOT CHORD 21-22=-223/269, 18-19=-143/1125, 17-18=-10/922, 14-15=0/862 WEBS 7-17=-121/692, 3-21=-833/46, 19-21=-157/650, 3-19=-107/856, 6-18=0/287, 6-17=-414/132, 15-17=0/774, 8-17=-278/142, 2-21=0/604, 11-14=0/760 NOTES-(5-6) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 22, 13. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss T12 Truss Type GABLE Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814853 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:13 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-Jb8l?WTfCH?13jvHDRTuEcILH8NPw8wob3WaJSzwNfS Scale = 1:28.4 Sheet Front Right Option 9-1-8 1 Ply 7/16OSB8 1 2 3 4 5 8 7 6 4x6 3x4 3x4 2x4 3x4 3x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 -0-9-00-9-0 4-2-44-2-4 8-4-84-2-4 -1-0-0 1-0-0 4-2-4 4-2-4 8-4-8 4-2-4 9-4-8 1-0-0 1-2-04-3-111-2-09.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.38 0.21 0.04 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.02 0.00 (loc) 7 7 6 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 82 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud *Except* 3-7: 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)8=392/0-3-8, 6=392/0-3-8 Max Horz 8=-106(LC 4) Max Uplift 8=-46(LC 6), 6=-46(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-289/69, 3-4=-289/69, 2-8=-330/107, 4-6=-330/107 NOTES-(7-8) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Gable studs spaced at 1-4-0 oc. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 8, 6. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss T13 Truss Type Common Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814854 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:14 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-noh7DsUHyb7ugtUTn8_7nqqT_YhrfZ8ypjG7suzwNfR Scale = 1:43.4 1 2 3 4 5 8 7 6 7x16 MT18HS 3x6 3x6 3x8 5x8 5x8 7-5-87-5-8 14-11-07-5-8 -1-0-0 1-0-0 7-5-8 7-5-8 14-11-0 7-5-8 15-11-0 1-0-0 1-2-06-9-21-2-09.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.57 0.33 0.17 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.04 -0.11 0.01 (loc) 7-8 6-7 6 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 MT18HS Weight: 60 lb FT = 20% GRIP 197/144 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-8,4-6: 2x4 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)8=654/0-3-8, 6=654/0-3-8 Max Horz 8=163(LC 5) Max Uplift 8=-56(LC 6), 6=-56(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-607/92, 3-4=-607/92, 2-8=-580/122, 4-6=-580/122 BOT CHORD 7-8=-204/342, 6-7=-67/342 WEBS 3-7=0/288 NOTES-(7-8) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) All plates are MT20 plates unless otherwise indicated. 4) The Fabrication Tolerance at joint 2 = 12%, joint 4 = 12% 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 8, 6. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss T14 Truss Type Common Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814855 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:16 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-jAptdYWYUCOcwBeruZ0bsFwnOMQi7VOFH1lEwnzwNfP Scale = 1:32.8 1 2 3 4 7 6 5 5x6 4x6 3x4 3x4 3x8 5x6 5-5-85-5-8 10-11-05-5-8 5-5-8 5-5-8 10-11-0 5-5-8 11-11-0 1-0-0 1-2-05-3-21-2-09.00 12 Plate Offsets (X,Y)-- [1:Edge,0-1-8], [3:0-2-12,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.64 0.17 0.06 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.03 0.00 (loc) 6-7 5-6 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 43 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-7,3-5: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)7=421/0-3-8, 5=497/0-3-8 Max Horz 7=-138(LC 4) Max Uplift 7=-14(LC 6), 5=-50(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-422/75, 2-3=-422/76, 1-7=-367/67, 3-5=-443/107 NOTES-(5-6) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 7, 5. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss T15 Truss Type Common Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814856 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:18 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-fZxe2EXo0qeK9VoE0_33xg?CT95LbPwYkKEK?gzwNfN Scale = 1:28.4 1 2 3 4 7 6 5 3x6 4x6 2x4 2x4 3x8 3x6 4-2-44-2-4 8-4-84-2-4 4-2-4 4-2-4 8-4-8 4-2-4 9-4-8 1-0-0 1-2-04-3-111-2-09.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.28 0.16 0.06 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.02 0.00 (loc) 6-7 6-7 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 34 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-7,3-5: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)7=318/0-5-0, 5=397/0-3-8 Max Horz 7=-116(LC 4) Max Uplift 7=-10(LC 6), 5=-46(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-269/44, 2-3=-289/50, 1-7=-287/51, 3-5=-366/93 NOTES-(5-6) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 7, 5. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss T16 Truss Type Common Qty 2 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814857 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:19 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-8lV0GaYQn7mBneNQZhaIUtXOxZRoKsEhz_zuX6zwNfM Scale = 1:28.4 1 2 3 4 7 6 5 3x6 4x6 2x4 2x4 3x8 3x6 3-9-123-9-12 8-0-04-2-4 3-9-12 3-9-12 8-0-0 4-2-4 9-0-0 1-0-0 1-5-64-3-111-2-09.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.24 0.15 0.06 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.02 0.00 (loc) 5-6 5-6 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 33 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-7,3-5: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)7=303/0-3-8, 5=382/0-3-8 Max Horz 7=-119(LC 4) Max Uplift 7=-9(LC 7), 5=-45(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-270/49, 1-7=-276/48, 3-5=-350/93 NOTES-(5-6) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 7, 5. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss T17 Truss Type Common Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814858 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:20 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-cy3OTvZ2YRu2Ooyd7P5X054ZnzoR3JaqCejR3YzwNfL Scale = 1:28.4 1 2 3 6 5 4 3x6 4x6 3x6 2x4 3x8 2x4 3-9-123-9-12 7-4-03-6-4 7-7-80-3-8 3-9-12 3-9-12 7-4-0 3-6-4 1-5-64-3-110-3-89.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.23 0.12 0.05 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.01 0.00 (loc) 5-6 5-6 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 30 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-6,3-4: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)6=282/0-3-8, 4=282/0-3-8 Max Horz 6=108(LC 5) Max Uplift 6=-8(LC 7), 4=-10(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-6=-253/48, 3-4=-256/46 NOTES-(5-6) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 6, 4. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss T18 Truss Type Common Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814859 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:21 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-48cmhFagJl0v0yWph6cmZIdk5N8romt_QIS?b_zwNfK Scale = 1:29.3 1 2 3 6 5 4 3x6 4x6 3x6 3x8 2x4 2x4 -0-3-80-3-8 3-6-43-6-4 7-0-83-6-4 7-4-00-3-8 3-6-4 3-6-4 7-0-8 3-6-4 0-3-84-3-110-3-89.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.20 0.11 0.05 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.01 0.00 (loc) 5-6 5-6 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 30 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-6,3-4: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)6=270/0-3-8, 4=270/0-3-8 Max Horz 6=-108(LC 4) Max Uplift 6=-9(LC 7), 4=-9(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(5-6) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 6, 4. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss T19 Truss Type Roof Special Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814860 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:23 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-0WkX5xbxrMGdFGgCoXeEeji5dArUGg4Hucx5gtzwNfI Scale = 1:15.1 1 2 3 5 4 2x4 2x4 2x4 2x4 2-2-02-2-0 -1-1-0 1-1-0 2-2-0 2-2-0 1-1-02-5-02-1-80-3-82-5-07.39 12 Plate Offsets (X,Y)-- [4:0-1-13,0-0-9] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.13 0.04 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 0.00 (loc) 5 4-5 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 9 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-5: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=174/0-3-10, 4=53/0-1-8 Max Horz 5=70(LC 5) Max Uplift 5=-35(LC 6), 4=-28(LC 5) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Bearing at joint(s) 4 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 4) Provide mechanical connection (by others) of truss to bearing plate at joint(s) 4. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 4. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss T20 Truss Type Roof Special Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814861 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:24 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-UjIvJHcZcgOUtQFOMF9TBxFGNaAj?7KQ7GhfCJzwNfH Scale = 1:15.1 1 2 3 5 4 2x4 2x4 2x4 2x4 2-2-02-2-0 -1-1-0 1-1-0 2-2-0 2-2-0 1-1-02-5-02-1-80-3-82-5-07.39 12 Plate Offsets (X,Y)-- [4:0-1-14,0-0-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.13 0.04 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 0.00 (loc) 5 4-5 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 9 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-5: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=174/0-3-10, 4=53/0-1-8 Max Horz 5=70(LC 5) Max Uplift 5=-35(LC 6), 4=-28(LC 5) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Bearing at joint(s) 4 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 4) Provide mechanical connection (by others) of truss to bearing plate at joint(s) 4. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 4. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss T21 Truss Type Common Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814862 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:24 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-UjIvJHcZcgOUtQFOMF9TBxFAca6r?5JQ7GhfCJzwNfH Scale = 1:39.4 1 2 3 4 7 6 5 5x8 4x6 3x4 3x4 3x8 5x8 6-11-86-11-8 13-11-06-11-8 6-11-8 6-11-8 13-11-0 6-11-8 14-11-0 1-0-0 1-2-06-4-101-2-09.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.56 0.28 0.13 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.03 -0.08 0.01 (loc) 5-6 5-6 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 55 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-7,3-5: 2x4 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)7=542/0-5-8, 5=617/0-3-8 Max Horz 7=-164(LC 4) Max Uplift 7=-19(LC 6), 5=-54(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-564/88, 2-3=-564/88, 1-7=-473/80, 3-5=-548/119 BOT CHORD 6-7=-182/328, 5-6=-53/292 WEBS 2-6=0/265 NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) The Fabrication Tolerance at joint 1 = 8%, joint 3 = 8% 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 7, 5. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss TG01 Truss Type GABLE Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814863 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:26 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-R5Qfkzep8HeB6jPmUfCxGMKVNOjcT_7jaaAmHCzwNfF Scale = 1:51.5 Sheet FrontLeft Option 7-11-3 1 Ply 7/16OSB8 1 2 3 4 5 6 7 11 10 9 8 30 31 32 33 4x6 5x12 4x6 3x8 2x4 2x4 5x12 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 7-11-37-11-3 9-11-82-0-5 19-11-09-11-8 -1-0-0 1-0-0 5-1-8 5-1-8 9-11-8 4-10-0 14-8-7 4-8-15 14-9-8 0-1-1 19-11-0 5-1-8 20-11-0 1-0-0 1-2-08-7-101-2-09.00 12 Plate Offsets (X,Y)-- [8:0-7-7,0-2-8], [11:0-7-7,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.61 0.59 0.24 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.04 -0.10 0.02 (loc) 9 9-11 8 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 209 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x6 SPF No.2 WEBS 2x4 SPF-S Stud *Except* 2-11,6-8: 2x6 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-6-1 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)11=844/0-3-8, 8=850/0-3-8 Max Horz 11=204(LC 12) Max Uplift 11=-124(LC 5), 8=-83(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-876/117, 3-4=-667/137, 4-5=-668/134, 5-6=-877/112, 2-11=-713/145, 6-8=-713/140 BOT CHORD 9-11=-68/616, 8-9=-3/616 WEBS 4-9=-61/465 NOTES-(9-10) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Gable studs spaced at 1-4-0 oc. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 8 except (jt=lb) 11=124. 7) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 36 lb down and 37 lb up at 1-8-0, and 38 lb down and 42 lb up at 1-11-4 on top chord, and 4 lb up at 1-8-0, 3 lb down and 16 lb up at 1-11-4, 3 lb down and 16 lb up at 3-11-4, and 3 lb down and 16 lb up at 5-11-4, and 3 lb down and 16 lb up at 7-11-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 8) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-2=-60, 2-4=-60, 4-6=-60, 6-7=-60, 8-11=-20 Continued on page 2 January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss TG01 Truss Type GABLE Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814863 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:26 2019 Page 2 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-R5Qfkzep8HeB6jPmUfCxGMKVNOjcT_7jaaAmHCzwNfF LOAD CASE(S) Standard Concentrated Loads (lb) Vert: 10=2(F) 31=5(F) 32=2(F) 33=2(F) 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss TG02 Truss Type ROOF SPECIAL GIRDER Qty 1 Ply 3 103 Woods at Shelborne Job Reference (optional) I35814864 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:28 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-NUYQ9ff4fuuvM1Z9b4EPLnPq8BNbxkz01ufsL4zwNfD Scale = 1:68.1 1 2 3 4 5 6 7 8 18 17 16 15 14 13 12 11 10 919202122232425262728 3x8 6x8 6x8 2x4 3x6 2x4 4x8 6x8 6x8 8x10 8x8 5x8 6x10 6x10 3x8 3x6 5x8 5x8 1-3-81-3-82-3-81-0-0 7-5-85-2-0 12-7-85-2-0 16-8-134-1-5 20-10-34-1-5 25-3-04-4-13 1-3-8 1-3-8 2-3-8 1-0-0 7-5-8 5-2-0 12-7-8 5-2-0 16-8-13 4-1-5 20-10-3 4-1-5 25-3-0 4-4-13 1-2-010-7-101-2-00-8-09.00 12 Plate Offsets (X,Y)-- [2:0-2-15,0-1-12], [10:0-2-8,0-2-8], [13:0-3-4,0-3-0], [14:0-2-8,0-4-4], [15:0-7-0,0-5-0], [17:0-2-8,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-MR 0.66 0.74 0.85 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.15 -0.36 0.14 (loc) 11-12 11-12 9 l/defl >999 >821 n/a L/d 240 180 n/a PLATES MT20 Weight: 430 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SP 2400F 2.0E *Except* 13-15: 2x6 SP 2400F 2.0E WEBS 2x3 SPF No.2 *Except* 3-16,5-12,1-18: 2x4 SPF No.2, 8-9: 2x6 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-3-8 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)9=9311/0-3-8, 18=9583/0-3-8 Max Horz 18=251(LC 12) Max Uplift 9=-467(LC 6), 18=-491(LC 5) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-2236/146, 2-3=-12608/705, 3-4=-11641/643, 4-5=-8034/521, 5-6=-7970/531, 6-7=-9619/560, 7-8=-10556/558, 1-18=-1948/133, 8-9=-8096/433 BOT CHORD 17-18=-402/5598, 16-17=-36/634, 14-15=-666/10629, 13-14=-467/9240, 11-12=-17/433, 10-11=-377/8349, 9-10=-97/1596 WEBS 15-16=-22/559, 3-15=-79/653, 12-13=-53/1466, 5-13=-534/9184, 2-17=-3636/245, 15-17=-459/6205, 2-15=-435/6903, 3-14=-1469/209, 4-14=-230/5027, 4-13=-4283/343, 11-13=-306/7306, 6-13=-2418/246, 6-11=-170/2810, 7-11=-1021/135, 7-10=-59/1134, 2-18=-7962/387, 8-10=-309/6949 NOTES-(8-9) 1) 3-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc, 2x6 - 2 rows staggered at 0-9-0 oc. Bottom chords connected as follows: 2x4 - 2 rows staggered at 0-5-0 oc, 2x6 - 2 rows staggered at 0-5-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc, 2x3 - 1 row at 0-5-0 oc, Except member 17-15 2x3 - 1 row at 0-9-0 oc, member 15-2 2x3 - 1 row at 0-9-0 oc, member 14-3 2x3 - 1 row at 0-9-0 oc, member 4-14 2x3 - 1 row at 0-9-0 oc, member 13-4 2x3 - 1 row at 0-9-0 oc, member 11-13 2x3 - 1 row at 0-9-0 oc, member 13-6 2x3 - 1 row at 0-9-0 oc, member 6-11 2x3 - 1 row at 0-9-0 oc, member 11-7 2x3 - 1 row at 0-9-0 oc, member 7-10 2x3 - 1 row at 0-9-0 oc, member 18-2 2x3 - 1 row at 0-9-0 oc, member 10-8 2x3 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 9=467, 18=491. Continued on page 2 January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss TG02 Truss Type ROOF SPECIAL GIRDER Qty 1 Ply 3 103 Woods at Shelborne Job Reference (optional) I35814864 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:28 2019 Page 2 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-NUYQ9ff4fuuvM1Z9b4EPLnPq8BNbxkz01ufsL4zwNfD NOTES-(8-9) 7) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 1404 lb down and 71 lb up at 1-4-12, 1405 lb down and 73 lb up at 3-4-12, 1418 lb down and 77 lb up at 5-4-12, 1418 lb down and 77 lb up at 7-4-12, 1418 lb down and 77 lb up at 9-4-12, 1418 lb down and 77 lb up at 11-4-12, 1405 lb down and 71 lb up at 13-4-12, 1405 lb down and 71 lb up at 15-4-12, 1405 lb down and 71 lb up at 17-4-12, 1405 lb down and 71 lb up at 19-4-12, and 1405 lb down and 71 lb up at 21-4-12, and 1405 lb down and 71 lb up at 23-4-11 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-5=-60, 5-8=-60, 16-18=-20, 13-15=-20, 9-12=-20 Concentrated Loads (lb) Vert: 17=-1404(F) 14=-1418(F) 19=-1405(F) 20=-1418(F) 21=-1418(F) 22=-1418(F) 23=-1405(F) 24=-1405(F) 25=-1405(F) 26=-1405(F) 27=-1405(F) 28=-1405(F) 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss TG03 Truss Type Common Girder Qty 1 Ply 2 103 Woods at Shelborne Job Reference (optional) I35814865 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:30 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-JtfAZKhKBW8dbLiYjVGtQCVCp?0rPcsJVC8zQzzwNfB Scale = 1:56.3 1 2 3 4 5 6 12 11 10 9 8 713141516171819 4x6 4x6 4x10 5x12 3x6 5x6 5x6 6x8 4x10 8x8 5x12 4x8 8-4-38-4-3 10-11-122-7-9 16-3-145-4-2 21-11-85-7-10 4-3-14 4-3-14 8-4-3 4-0-6 10-11-12 2-7-9 16-3-14 5-4-2 21-11-8 5-7-10 1-2-09-4-131-2-09.00 12 Plate Offsets (X,Y)-- [7:Edge,0-2-0], [8:0-3-8,0-4-8], [12:Edge,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.52 0.95 0.96 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.13 -0.32 0.02 (loc) 10-12 10-12 7 l/defl >770 >303 n/a L/d 240 180 n/a PLATES MT20 Weight: 277 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x6 SP 2400F 2.0E WEBS 2x4 SPF-S Stud *Except* 4-9,5-8: 2x4 SPF No.2, 1-12,6-7: 2x8 SP 2400F 2.0E BRACING- TOP CHORD Structural wood sheathing directly applied or 5-6-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)10=7813/0-3-8, 12=2904/0-5-8, 7=5037/0-3-8 Max Horz 12=-220(LC 3) Max Uplift 10=-442(LC 5), 12=-122(LC 6), 7=-244(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-3721/207, 2-3=-1157/117, 3-4=-1929/206, 4-5=-2003/180, 5-6=-4978/270, 1-12=-2257/147, 6-7=-3432/199 BOT CHORD 10-12=-160/1314, 9-10=-87/845, 8-9=-125/3898, 7-8=-128/2088 WEBS 2-10=-648/151, 3-10=-2450/164, 3-9=-102/1957, 4-9=-142/2014, 5-9=-3241/273, 5-8=-138/3710, 2-12=-195/2439, 6-8=-61/1840 NOTES-(8-9) 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc, 2x8 - 2 rows staggered at 0-9-0 oc. Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-7-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 10=442, 12=122, 7=244. 7) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 1404 lb down and 72 lb up at 2-1-4, 1404 lb down and 72 lb up at 4-1-4, 1404 lb down and 72 lb up at 6-1-4, 1404 lb down and 72 lb up at 8-1-4, 1405 lb down and 71 lb up at 10-1-4, 1405 lb down and 71 lb up at 12-1-4, 1405 lb down and 71 lb up at 14-1-4, 1405 lb down and 71 lb up at 16-1-4, and 1405 lb down and 71 lb up at 18-1-4, and 1405 lb down and 71 lb up at 20-1-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard Continued on page 2 January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss TG03 Truss Type Common Girder Qty 1 Ply 2 103 Woods at Shelborne Job Reference (optional) I35814865 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:30 2019 Page 2 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-JtfAZKhKBW8dbLiYjVGtQCVCp?0rPcsJVC8zQzzwNfB LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-4=-60, 4-6=-60, 7-12=-20 Concentrated Loads (lb) Vert: 11=-1404(B) 10=-1404(B) 8=-1405(B) 13=-1404(B) 14=-1404(B) 15=-1405(B) 16=-1405(B) 17=-1405(B) 18=-1405(B) 19=-1405(B) 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss TG04 Truss Type GABLE Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814866 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:32 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-FFnx_0iaj7PLqeswqwJLVdaW1psNtbbbyWd4UszwNf9 Scale = 1:60.9 Sheet Front Left Option 6-11-10 1 Ply 7/16OSB8 1 2 3 4 5 6 7 13 12 11 10 9 8 33 34 35 36 37 38 4x6 3x6 4x6 3x6 4x6 4x8 3x6 4x6 4x8 3x4 3x8 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 6-11-106-11-10 8-4-31-4-9 10-11-122-7-9 16-3-145-4-2 21-11-85-7-10 -1-0-0 1-0-0 8-4-3 8-4-3 10-11-12 2-7-9 15-2-14 4-3-2 16-3-14 1-1-0 21-11-8 5-7-10 22-11-8 1-0-0 1-2-09-4-131-2-09.00 12 Plate Offsets (X,Y)-- [2:0-2-12,0-1-12], [16:0-1-8,0-1-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.66 0.24 0.62 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.02 -0.05 0.01 (loc) 11-13 11-13 8 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 249 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x6 SPF No.2 WEBS 2x4 SPF-S Stud *Except* 4-10: 2x4 SPF No.2, 2-13,6-8: 2x6 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)13=486/0-5-8, 11=709/0-3-8, 8=664/0-3-8 Max Horz 13=-222(LC 3) Max Uplift 13=-81(LC 5), 11=-75(LC 5), 8=-66(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-344/85, 3-4=-330/154, 4-5=-349/113, 5-6=-640/62, 2-13=-418/111, 6-8=-602/98 BOT CHORD 11-13=-289/392, 9-10=0/436 WEBS 3-11=-520/81, 5-10=-330/126, 2-11=-263/256, 6-9=0/256 NOTES-(9-10) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Gable studs spaced at 1-4-0 oc. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 13, 11, 8. 7) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 32 lb down and 40 lb up at 1-8-0, and 38 lb down and 42 lb up at 1-11-12 on top chord, and 2 lb up at 1-8-0, 3 lb down and 16 lb up at 1-11-12, 3 lb down and 16 lb up at 3-11-12, and 3 lb down and 16 lb up at 5-11-12, and 3 lb down and 16 lb up at 7-11-12 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 8) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-2=-60, 2-4=-60, 4-6=-60, 6-7=-60, 8-13=-20 Concentrated Loads (lb) Vert: 12=2(F) 35=2(F) 36=2(F) 37=2(F) 38=2(F)January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss TG05 Truss Type Common Girder Qty 1 Ply 3 103 Woods at Shelborne Job Reference (optional) I35814867 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:34 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-CevhPikqFkf34y0JxLLpb2fs?cQcLVouQq6BZkzwNf7 Scale = 1:37.9 1 2 3 4 5 10 9 8 7 6 11 12 13 14 15 3x8 4x6 3x8 3x8 3x8 6x8 3x6 3x6 3x6 3x6 3-5-03-5-0 6-7-83-2-8 9-10-03-2-8 13-3-03-5-0 3-5-0 3-5-0 6-7-8 3-2-8 9-10-0 3-2-8 13-3-0 3-5-0 1-2-06-1-101-2-09.00 12 Plate Offsets (X,Y)-- [7:0-2-8,0-1-8], [9:0-2-8,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.63 0.71 0.58 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.04 -0.09 0.02 (loc) 8-9 8-9 6 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 177 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-10,5-6: 2x4 SPF No.2, 1-9,5-7: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)10=5259/0-3-8, 6=4204/0-5-8 Max Horz 10=-145(LC 3) Max Uplift 10=-257(LC 5), 6=-205(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-4863/263, 2-3=-3675/250, 3-4=-3676/250, 4-5=-4657/252, 1-10=-3864/208, 5-6=-3786/204 BOT CHORD 9-10=-172/940, 8-9=-208/3804, 7-8=-150/3642, 6-7=-37/602 WEBS 3-8=-231/4070, 4-8=-1048/121, 4-7=-55/1259, 2-8=-1283/133, 2-9=-69/1560, 1-9=-117/2982, 5-7=-127/3166 NOTES-(8-9) 1) 3-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc. Bottom chords connected as follows: 2x4 - 2 rows staggered at 0-4-0 oc. Webs connected as follows: 2x3 - 1 row at 0-9-0 oc, 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 10=257, 6=205. 7) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 1407 lb down and 70 lb up at 0-10-4, 1404 lb down and 71 lb up at 2-10-4, 1404 lb down and 71 lb up at 4-10-4, 1404 lb down and 71 lb up at 6-10-4, and 1404 lb down and 71 lb up at 8-10-4, and 1404 lb down and 71 lb up at 10-10-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard Continued on page 2 January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss TG05 Truss Type Common Girder Qty 1 Ply 3 103 Woods at Shelborne Job Reference (optional) I35814867 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:34 2019 Page 2 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-CevhPikqFkf34y0JxLLpb2fs?cQcLVouQq6BZkzwNf7 LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-3=-60, 3-5=-60, 6-10=-20 Concentrated Loads (lb) Vert: 8=-1404(F) 11=-1407(F) 12=-1404(F) 13=-1404(F) 14=-1404(F) 15=-1404(F) 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss TG06 Truss Type GABLE Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814868 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:36 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-810RqOl5nMvnJGAh3mNHgTlIKQGapWFBt8bHddzwNf5 Scale = 1:43.8 Sheet Front Full Sheathing 1 Ply 7/16OSB8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 28 27 26 25 24 23 22 21 20 19 18 17 16 2x4 3x4 4x6 2x4 3x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 14-11-014-11-0 -1-0-0 1-0-0 7-5-8 7-5-8 14-11-0 7-5-8 15-11-0 1-0-0 1-2-06-9-21-2-09.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.19 0.10 0.13 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.01 0.00 (loc) 15 15 16 l/defl n/r n/r n/a L/d 180 120 n/a PLATES MT20 Weight: 192 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.All bearings 14-11-0. (lb) - Max Horz 28=163(LC 5) Max Uplift All uplift 100 lb or less at joint(s) 23, 24, 25, 26, 21, 20, 19, 18 except 28=-158(LC 4), 16=-113(LC 5), 27=-171(LC 5), 17=-138(LC 4) Max Grav All reactions 250 lb or less at joint(s) 28, 16, 22, 23, 24, 25, 26, 27, 21, 20, 19, 18, 17 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(9-10) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Gable requires continuous bottom chord bearing. 5) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 6) Gable studs spaced at 1-4-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 23, 24, 25, 26, 21, 20, 19, 18 except (jt=lb) 28=158, 16=113, 27=171, 17=138. 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss V01 Truss Type GABLE Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814869 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:37 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-cDap1kmjYf1dxPludTuWCgHQPqXyY_KL6oKrA3zwNf4 Scale = 1:24.4 1 2 3 43x6 6x8 3x6 2x4 9-9-109-9-10 4-10-13 4-10-13 9-9-10 4-10-13 0-0-43-8-20-0-49.00 12 Plate Offsets (X,Y)-- [1:0-0-0,Edge], [2:0-6-0,0-1-12], [3:0-2-9,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.43 0.34 0.08 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 20 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=177/9-9-10, 3=177/9-9-10, 4=381/9-9-10 Max Horz 1=-80(LC 4) Max Uplift 1=-15(LC 6), 3=-21(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss V02 Truss Type GABLE Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814870 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:38 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-4P8CF3nLJz9UYZK4ABPlluqdmDw0HSOULS4OiVzwNf3 Scale = 1:16.6 1 2 3 4 2x4 3x4 2x4 2x4 6-2-156-2-15 3-1-7 3-1-7 6-2-15 3-1-7 0-0-42-4-20-0-49.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.26 0.16 0.03 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 12 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=124/6-2-15, 3=124/6-2-15, 4=201/6-2-15 Max Horz 1=-49(LC 4) Max Uplift 1=-18(LC 6), 3=-22(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss V03 Truss Type Valley Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814871 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:39 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-YbiaSPoz4HHLAjvGkux_I5Ms3dHO0v2dZ6pyEyzwNf2 Scale = 1:7.8 1 2 3 2x4 2x4 2x4 2-7-152-7-15 2-8-40-0-5 1-4-2 1-4-2 2-8-4 1-4-2 0-0-41-0-20-0-49.00 12 Plate Offsets (X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.04 0.09 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 4 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 2-8-4 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=83/2-7-10, 3=83/2-7-10 Max Horz 1=-18(LC 4) Max Uplift 1=-3(LC 6), 3=-3(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss V04 Truss Type GABLE Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814872 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:41 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-U_qKt5pDcuX3P12fsJzSNWSAlRzkUlQw1PI2JqzwNf0 Scale = 1:53.6 1 2 3 4 5 6 7 13 12 11 10 9 83x4 4x6 3x4 3x6 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 22-2-1522-2-15 11-1-7 11-1-7 22-2-15 11-1-7 0-0-48-4-20-0-49.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.15 0.10 0.26 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 7 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 73 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 22-2-15. (lb) - Max Horz 1=186(LC 5) Max Uplift All uplift 100 lb or less at joint(s) 1, 13, 8 except 11=-101(LC 6), 9=-100(LC 7) Max Grav All reactions 250 lb or less at joint(s) 1, 7, 10 except 11=336(LC 10), 13=297(LC 1), 9=336(LC 11), 8=297(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. WEBS 3-11=-256/151, 5-9=-256/150 NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 13, 8 except (jt=lb) 11=101, 9=100. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss V05 Truss Type GABLE Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814873 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:42 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-zAOi5RqsMCfw1BdrP1Uhvk_IlrFCDEI4F32crHzwNf? Scale = 1:45.3 1 2 3 4 5 9 8 7 64x6 4x6 4x6 2x4 2x4 2x4 2x4 2x4 2x4 18-8-418-8-4 9-4-2 9-4-2 18-8-4 9-4-2 0-0-47-0-20-0-49.00 12 Plate Offsets (X,Y)-- [1:0-1-9,Edge], [5:0-2-3,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.33 0.34 0.16 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 5 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 52 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 18-8-4. (lb) - Max Horz 1=-156(LC 4) Max Uplift All uplift 100 lb or less at joint(s) 1 except 9=-131(LC 6), 6=-131(LC 7) Max Grav All reactions 250 lb or less at joint(s) 1, 5, 7 except 9=435(LC 10), 6=435(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. WEBS 2-9=-324/179, 4-6=-324/179 NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1 except (jt=lb) 9=131, 6=131. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss V06 Truss Type GABLE Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814874 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:43 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-RNy5InrU7VnnfKC2zk?wSxXTCEf_yhyDUjn9NjzwNf_ Scale = 1:35.4 1 2 3 4 5 8 7 63x6 6x6 3x6 2x4 2x4 2x4 2x4 2x4 15-1-1015-1-10 7-6-13 7-6-13 15-1-10 7-6-13 0-0-45-8-20-0-49.00 12 Plate Offsets (X,Y)-- [3:Edge,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.35 0.11 0.13 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 5 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 40 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 15-1-10. (lb) - Max Horz 1=-125(LC 4) Max Uplift All uplift 100 lb or less at joint(s) 1 except 8=-101(LC 6), 6=-101(LC 7) Max Grav All reactions 250 lb or less at joint(s) 1, 5 except 7=260(LC 1), 8=327(LC 10), 6=327(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1 except (jt=lb) 8=101, 6=101. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss V07 Truss Type GABLE Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814875 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:44 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-vZVTV7r6upveHUnEXRW9?94bBexzh9aMjNXiu9zwNez Scale = 1:29.6 1 2 3 44x8 7x16 MT18HS 4x8 2x4 11-6-1511-6-15 5-9-7 5-9-7 11-6-15 5-9-7 0-0-44-4-20-0-49.00 12 Plate Offsets (X,Y)-- [1:0-7-3,Edge], [2:1-2-0,0-2-0], [3:0-4-3,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.52 0.32 0.11 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 MT18HS Weight: 27 lb FT = 20% GRIP 197/144 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=206/11-6-15, 3=206/11-6-15, 4=447/11-6-15 Max Horz 1=-94(LC 4) Max Uplift 1=-15(LC 6), 3=-21(LC 7), 4=-3(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. WEBS 2-4=-256/62 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) All plates are MT20 plates unless otherwise indicated. 4) The Fabrication Tolerance at joint 2 = 16% 5) Gable requires continuous bottom chord bearing. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3, 4. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss V08 Truss Type GABLE Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814876 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:46 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-rydDwotMQQAMWoxcesZd4a9ykSd1946fAh0pz2zwNex Scale = 1:20.3 1 2 3 4 2x4 3x4 2x4 2x4 8-0-48-0-4 4-0-2 4-0-2 8-0-4 4-0-2 0-0-43-0-20-0-49.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.46 0.28 0.04 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 16 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=163/8-0-4, 3=163/8-0-4, 4=265/8-0-4 Max Horz 1=-64(LC 4) Max Uplift 1=-24(LC 6), 3=-29(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss V09 Truss Type GABLE Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814877 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:47 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-J8Bb88u_BkID8yWpCa4scniDgs0TuWmpPLlNVUzwNew Scale = 1:11.1 1 2 3 4 2x4 3x4 2x4 2x4 4-5-104-5-10 2-2-13 2-2-13 4-5-10 2-2-13 0-0-41-8-20-0-49.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.12 0.08 0.02 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 9 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 4-5-10 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=85/4-5-10, 3=85/4-5-10, 4=138/4-5-10 Max Horz 1=-33(LC 4) Max Uplift 1=-12(LC 6), 3=-15(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss V10 Truss Type GABLE Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814878 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:48 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-nKl_LUvcy2Q4l65?mHb59?EJCFIadxnye?Vw1wzwNev Scale = 1:45.4 1 2 3 4 5 9 8 7 64x6 4x6 4x6 2x4 2x4 2x4 2x4 2x4 2x4 18-8-1218-8-12 9-4-6 9-4-6 18-8-12 9-4-6 0-0-47-0-50-0-49.00 12 Plate Offsets (X,Y)-- [1:0-1-9,Edge], [5:0-2-3,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.33 0.34 0.16 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 5 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 52 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 18-8-12. (lb) - Max Horz 1=-157(LC 4) Max Uplift All uplift 100 lb or less at joint(s) 1 except 9=-131(LC 6), 6=-131(LC 7) Max Grav All reactions 250 lb or less at joint(s) 1, 5, 7 except 9=436(LC 10), 6=436(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. WEBS 2-9=-325/180, 4-6=-325/179 NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1 except (jt=lb) 9=131, 6=131. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss V11 Truss Type GABLE Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814879 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:49 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-FXJMZqvFjLYxNFfBK?6KiCnVufiNMOQ6sfETaNzwNeu Scale = 1:35.2 1 2 3 4 5 8 7 63x6 6x6 3x6 2x4 2x4 2x4 2x4 2x4 15-2-215-2-2 7-7-1 7-7-1 15-2-2 7-7-1 0-0-45-8-50-0-49.00 12 Plate Offsets (X,Y)-- [3:0-1-14,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.27 0.11 0.13 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 5 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 40 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 15-2-2. (lb) - Max Horz 1=-126(LC 4) Max Uplift All uplift 100 lb or less at joint(s) 1 except 8=-101(LC 6), 6=-101(LC 7) Max Grav All reactions 250 lb or less at joint(s) 1, 5 except 7=259(LC 1), 8=329(LC 10), 6=329(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1 except (jt=lb) 8=101, 6=101. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss V12 Truss Type GABLE Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814880 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:50 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-kjtkmAwtUfgn?PEOtidZEQKdh3zL5s5F5J_16pzwNet Scale = 1:27.1 1 2 3 43x8 5x6 3x8 2x4 11-7-711-7-7 5-9-11 5-9-11 11-7-7 5-9-12 0-0-44-4-50-0-49.00 12 Plate Offsets (X,Y)-- [1:0-5-13,Edge], [2:0-4-0,0-1-12], [3:0-2-13,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-S 0.46 0.32 0.11 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 27 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=218/11-7-7, 3=218/11-7-7, 4=425/11-7-7 Max Horz 1=95(LC 5) Max Uplift 1=-22(LC 6), 3=-28(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. WEBS 2-4=-251/60 NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss V13 Truss Type GABLE Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814881 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:51 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:WEEIJSg0TGyRTOzdpyM8nxz?AVh-CvQ6_WxVFzoecZpaRQ8ondsoOTK9qKLOKzjaeFzwNes Scale = 1:20.4 1 2 3 4 2x4 3x4 2x4 2x4 8-0-128-0-12 4-0-6 4-0-6 8-0-12 4-0-6 0-0-43-0-50-0-49.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.46 0.28 0.04 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 16 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=164/8-0-12, 3=164/8-0-12, 4=267/8-0-12 Max Horz 1=-65(LC 4) Max Uplift 1=-24(LC 6), 3=-29(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 103_Woods_at_Shelborne Truss V14 Truss Type Valley Qty 1 Ply 1 103 Woods at Shelborne Job Reference (optional) I35814882 8.220 s Nov 16 2018 MiTek Industries, Inc. Fri Jan 11 16:03:52 2019 Page 1 PROBUILD, MOORESVILLE, IN 46158 ID:7xuo92mOywNE4y94oyNOiQyeN3h-g6_UBsy70GwVEjOm?7g1JrP3NtgwZnGYZdT8AhzwNer Scale = 1:11.2 1 2 3 2x4 2x4 2x4 0-0-50-0-5 4-6-24-5-12 2-3-1 2-3-1 4-6-2 2-3-1 0-0-41-8-50-0-49.00 12 Plate Offsets (X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.13 0.31 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 8 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 4-6-2 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=155/4-5-7, 3=155/4-5-7 Max Horz 1=-34(LC 4) Max Uplift 1=-6(LC 6), 3=-6(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). January 14,2019 PRODUCT CODE APPROVALSLATERAL BRACING LOCATIONIndicates location where bearings(supports) occur. Icons vary butreaction section indicates jointnumber where bearings occur.Min size shown is for crushing only.Indicated by symbol shown and/orby text in the bracing section of theoutput. Use T or I bracingif indicated.The first dimension is the plate width measured perpendicular to slots. Second dimension isthe length parallel to slots.Center plate on joint unless x, yoffsets are indicated.Dimensions are in ft-in-sixteenths.Apply plates to both sides of trussand fully embed teeth.1. Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI.2. Truss bracing must be designed by an engineer. For wide truss spacing, individual lateral braces themselves may require bracing, or alternative Tor I bracing should be considered.3. Never exceed the design loading shown and never stack materials on inadequately braced trusses.4. Provide copies of this truss design to the building designer, erection supervisor, property owner and all other interested parties.5. Cut members to bear tightly against each other.6. Place plates on each face of truss at each joint and embed fully. Knots and wane at joint locations are regulated by ANSI/TPI 1.7. Design assumes trusses will be suitably protected from the environment in accord with ANSI/TPI 1.8. Unless otherwise noted, moisture content of lumber shall not exceed 19% at time of fabrication.9. Unless expressly noted, this design is not applicable for use with fire retardant, preservative treated, or green lumber.10. Camber is a non-structural consideration and is the responsibility of truss fabricator. General practice is to camber for dead load deflection.11. Plate type, size, orientation and location dimensions indicated are minimum plating requirements.12. Lumber used shall be of the species and size, and in all respects, equal to or better than that specified.13. Top chords must be sheathed or purlins provided at spacing indicated on design.14. Bottom chords require lateral bracing at 10 ft. spacing, or less, if no ceiling is installed, unless otherwise noted.15. Connections not shown are the responsibility of others.16. Do not cut or alter truss member or plate without prior approval of an engineer.17. Install and load vertically unless indicated otherwise.18. Use of green or treated lumber may pose unacceptable environmental, health or performance risks. Consult with project engineer before use.19. Review all portions of this design (front, back, words and pictures) before use. Reviewing pictures alone is not sufficient.20. Design assumes manufacture in accordance with ANSI/TPI 1 Quality Criteria.Failure to Follow Could Cause PropertyDamage or Personal Injury (Drawings not to scale)© 2012 MiTek® All Rights ReservedMiTek Engineering Reference Sheet: MII-7473 rev. 10/03/2015edge of truss.from outside"16/1-0ICC-ES Reports:ESR-1311, ESR-1352, ESR1988ER-3907, ESR-2362, ESR-1397, ESR-3282JOINTS ARE GENERALLY NUMBERED/LETTERED CLOCKWISEAROUND THE TRUSS STARTING AT THE JOINT FARTHEST TOTHE LEFT.CHORDS AND WEBS ARE IDENTIFIED BY END JOINTNUMBERS/LETTERS.W 4 - 6 W3-6W3- 7 W2-7W1-7C1-8 C5-6C6-7C7-8C4-5 C3-4C2-3C1-2TOP CHORD TOP CHORD 87654321BOTTOM CHORDSTOP CHORDSBEARING4 x 4PLATE SIZEThis symbol indicates the required direction of slots inconnector plates."16/1For 4 x 2 orientation, locateplates 0- 1"4/3PLATE LOCATION AND ORIENTATIONSymbolsNumbering SystemGeneral Safety Notes *Plate location details available in MiTek 20/20software or upon request.Industry Standards:ANSI/TPI1: National Design Specification for Metal Plate Connected Wood Truss Construction.DSB-89: Design Standard for Bracing.BCSI: Building Component Safety Information, Guide to Good Practice for Handling, Installing & Bracing of Metal Plate Connected Wood Trusses.6-4-8WEBSTrusses are designed for wind loads in the plane of the truss unless otherwise shown.Lumber design values are in accordance with ANSI/TPI 1 section 6.3 These truss designs rely on lumber values established by others.dimensions shown in ft-in-sixteenths