HomeMy WebLinkAboutGradex/Eng/CO #2/25,344.25/North Range Line Road Reconstruction – Project #16-ENG-49City of Carmel Project 16-ENG-49
North Rangeline Road Reconstruction
CHANGE ORDER #2
Jackson's Grant Blvd. Renovations
Contract Price prior to this Change Order
--------------------------- —-------------------------------------------------------------
Contract Price will be increased by this Change Order
------------------------------------------------------------------------------------
New Contract Price including this Change Order
---------------------------------------------------------------------------------------
$4,05 7,251.1 1
$25,344.25
$4,082,595.36
Amount
Adjusted Contract
Price
Cumulative % Change
from Original Contract
Original Contract
$4,541,978.00
$4,541,978.00
i N/A
CO1
(-$484,726.89)
$4,057,251,11
-10.67%
CO2
$25,344.25
$4,082,595.36
-10.11%
Page 1 of 2
CITY OF CARMEL
TO: Tom DeKlyen CONTRACT CHANGE ORDER NO.: 2
Gradex, Inc. DATE: 12/15/2018t�`
12900 N. Meridian St., Suite 120 PROJECT NAME: N. Rangeline Road Reconstruction /
Carmel, IN 46032
Project # 16-ENG-49
CITY REQ. NO.:
CITY PO NO.: COIT-100417 / SW-100425
CITY PO DATE: COIT- 5/4/2017 / SW — 5/6/2017
You are directed to make the following changes in this Contract:
*All additional work associated with the documents referenced below.
*This Change Order is being created to compensate Gradex Inc. for the renovation work
performed at Jackson's Grant Boulevard, as requested by the City of Carmel.
• All items created are based on the below referenced attachments.
*This Change order will create one new item, "Jackson's Grant Blvd. Renovations",
(Item # 179 - I LUMP SUM = $25,344.25).
11. The following referenced Documents further describe the changes outlined in Paragraph 1,
and are to be considered a part of this Change Order:
*Jackson's Grant Entrance work pricing
*GRADEX SUBMITTAL — Jackson's Grant Blvd. Revised Entry Median
*Change Order 2 Report-N. Rangeline Road Reconstruction
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order $ 4,057,726.89
Contract Price will be increased/deefeased by this Change Order $ 25,344.25
New Contract Price including this Change Order $ 4,083,071.14
Centfae' ime Pricf to thi-S C }ange-order —Days Gempletieii Date
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
ILIN
Page 2 of 2
The Above Changes Are
Recommended:
United Consulting
ENGINEER
1625 N. Post Road
Address
Indianapolis, IN 46219
City/State/Zip
By:
22t-7�.
Phone: 317.724.5582
Date: 1/9/2019
The Above Changes Are
Accepted:
Gradex, Inc.
CONTRACTOR
12900 N. Meridian St.,
Suite 120
Address
Carmel, In 46032
City/State/Zi
By:
Date J I I I �?0 t
A proved:
C �—
.,JJaSs Brain d, Mayo
Maryurke,�Member
Lori Wats ,'Member
A
0hiistine S. Paul y, Clerk -
Treasurer
Jere Ka man, P. .
C' Engineer
Date: D- jLe 1 1
) 1- UNITED United Consulting, Inc.
Consulingm
Change Order Details
Rangeline Road Reconstrucion
Description:
Project 16-ENG-49
Change Order:
2 Date Created: 01/03/2019
Status:
Draft Date Approved:
Type:
Changed Conditions
Summary:
Jackson's Grant Blvd. Renovations
Change Order Description:
Renovations to Jackson's Grant Blvd. entrance.
Awarded Project Amount:
$4,541,978.00
Authorized Project Amount:
$4,057,251.11
Change Order Amount:
1 $25,344.25
Revised Project Amount:
$4,082,595.36
Items
iiNewT
mb e. ; i tern Unit 3 i
Unit Price
Dollar Amount
Section 1 - De& t Section
0179 CO-LS LS 1.00
$25,344.250
$25,344.25
Change Order "LS" Item Jackson's Grant Blvd. Renovations
Reason: Changed Condtions
ziY kip F4� y �kWIN
Total:
+$25,344.25
zyx�
'
Attachments
Jackson's Grant Entrance work pricing.pdf
Change Order Details: Rangeline Road Page 1 of 2 01/03/2019
Reconstrucion
Gradex, Inc.
United Consulting
Date
Date
Change Order Details: Rangeline Road Page 2 of 2 01/03/2019
Reconstracion
Oradex Inc.Page
1
17161.2 Jackson Grant Entrance
10/012018
14:03
Thomas DeKlyen
ESTIMATE SUMMARY - COSTS &
BID PRICES
Bid# Client# Quantity Unit
Direct
Perm
Consir
Equip-
Sob
Direct Indirect
Total
Total Cost
-Balanced Bid-- )
Bid
Bid
Bid Description Manhours
Labor
Mail
Mail
Ment
Contr
Total Charge
Cost
Unit Price
Markup
Total
Unit Prig )
Price
Total
10 I.00 LS
25
1,910
300
1,000
1,350
4,560
4,560
4,560.00
290
4,850
4,849.96 {
4,849.96
4,949.96
CURB REMOVAL
25.00
6.4%
I
I
20 1.00 LS
IS
1,148
720
350
2,218
2,218
2,217.50
141
2,358
2,358.46 I
2,359.46
2,358.46
STONE SUBORADE FOR CONCRETE
15.00
6.4%
I
30 1.00 1S
9,755
9,755
9,755
9,755.00
620
10,375
10,375.09 j
10,375.09
10,375.09
ROUDE13USH INSTALL TRAVERSABLE
6.4%
I
I
40 1.00 LS
60
4.300
1,575
642
780
7.297
7,297
7,297.00
464
7,761
7,760.84 j
7,760.94
7,760.84
STAMPED CONCRETE INSTALLATION
60.00
6.4%
I
I
I
Totals:
100
7,357
2,595
1.642
2,490
9.755
23,829
23,829
1,514
25,344
j
25,344.25
[
23,830
]
(
[ 6.4%
Code between Balanced Bid s Bid Price: U-Unbalanced, F-Frozen, C-Closing Bidizam (item to absorb unbalancing differences)
[bracketed numbers represent adjusted Quantities}
•• in front of Ore Biditem indindes a Non•Addkiw hem
Markup % is shown as a percentage of cost
j
I
Markup on Resource Costs 1,514 {
"'•••"• TOTAL JOB too 7.357 2,595 1,642 2,480 9,755 23,929 23,829 1,514 25,344 1 25,34425
r
Spread Indirecis On TOTAL COST
---Estimate Notes -
Bid Dote: I OAM/2018 Owner:
Estimator in Charge:
Desired Bid (ifspocifred)-
Last Summary on 10N82018 at 1:39 PM,
Last Spread on 10/062018 at 1:59 PM.
Spread Markups On TOTAL COST
Engineering Firm:
0.00 Sort: Hold AaC N Subitem: N
Spread Addotts&Bonds On TOTAL COST
NonAdd: N
Cost Report
Gradex Inc. 12 Thomas DeKLyen Page 1 of 3
17161-2 Jackson Grant Entrance 10/08/2019 2:00 PM
Biditem
CURB REMOVAL
1 0
Takeoff Qty: 1.ODO LS
Bid Qty. 1.000 LS
Base tabor Burden
Total Labor Equipment, Perm Maiis Coat Matts
Sub
Trucking
Total
U. Cost
1,910.0o 0.00
1,910.00 ' 1,350.00 300.00
0.00
0.00
1,000.00 ,
4,560-00 I
Total
1,910.DO 0.00
1,910.00 1,350.00 300.00
0.00
0.00.
1,000.00
4,560.00
Manhours uAld H
- MM/Unit sium
Ease Labor/AW Tout Labor/MH
UrJt/CH
25,0000 0.0400
25.0000 182.4000
76.40DO
I
76.40DO;
Unit:
0.2000
LF
032425 Remove
Base Labor Burden
Curb Quantity:
Total Labor Equlpment, Perm Atatis Corot Mds
Sub
Trucking
Total
U.Cost
1,910.00 0.00
1,910.00 1,350.00 300.00
0.00
0.00
1,000.00
4,560.00 :
Total
1,910.00 0.00
1,910.00 1,350.00 300.00 :
0.00
0.00
1,000.00
4,560.DO
Crow $/Unit Crew Hrs/Urdt
Undb/Crew Hr $/Crew Four SMfts
Units/Shift
SAIftsNnit
$/Shift
3,260.0000 5.0000 '
0.2000 652.0000 0.5000
2.D000
C.5000
9,120.0000
Manhours-
Undt/MH MH/Unit
Total tabor/AW
Base LaborNMt
25.0000
0.D400 25.0000
76.4000
1,910.0000
Calendar:
60 10 HR 6 DAY
Hrs/Shift: 10 WC:
Code not found.
Crew:
DC30 DEMO • 373 EXCAVATOR
Prod: S C.5 Eft: 100.00 Crew Hrs: 5.00
Labor Pa:
5.00 Equipment PCs: 3.00
Resource
Dascrlpthn
Pcs/Wste Quantity Unit
Unit Cost
Tax/OT%
Actual UC
Total
2XDFL
Dump Fee (LD)
1.00 6.OD LD
50.00
1DO.00
50.00
300.00
5HAUL
Trucking - Sub
2.00 10.00 HR
100.00
100.00
100.00
1,000.00
8E25
323 Excavator
1.00 5.00 HR
188.00
100.DO
188.00
940.00,
BTMT
Mechanics Truck
1.00 5.00 HR
39.00
10D.00
39.00
195.00
8xSW
Walk Behind SAW 42"
1.00 5.00 HR
43.00
100.00
43.00
215.00.
FM
Foreman
2.00 10.00 MH
90.00
100.00
90.00
900.00
LG
General Laborer
2.DO 10.00 MH
62.50
: 100.00
62.50
625.00
OP
Operator
1.00 5.00 ' MH
77.00
100.00
77.00
385.00
Biditem
STONE SUBGRADE FOR CONCRETE
20
TakeoffW..
Bid
1.000 LS
1.000 LS
Qty:
Ban Labor
Burden Total Labor
Equipment Perm Mails . Corot Matti Sub Trucking Total
U.Cost 1,147.50
0.00 1,147.50
350.00 720.00 0.00 0.00 0.00 2,217.50
Total 1,147.50
0.00 1,147.50
350.OU 720.00 0.00 0.00 0.00 2,217.50
17161-2 Jackson Grant Entrance 10/08/2018 2:00 PM Page 2 of 3
Calendar: 60
10 HR 6 DAY
Hrs/Shift:l0
WC:
Code not found.
Crew: GC20
GRADE - BACKHOE
Prod: S 0.5
Eff: 100.00
Crew Hrs: 5.00
Labor Pa:
3.00 Equipment
Pcs: 1.00
Resource
Description
Pm/Wste
Quantity - Unit
UMtCost
Tax/oT%
Actual UC
Total
2AGG53
No. 53 Stone
1.00
40.00 TN
18.D0
100.00 '
18.00 '
720.00
BXBH
Backhoe
1.00
5.00 HR
70.00
100.D0.
70.00
350.00
FM
Foreman
1.00
5.00, MH
90.00
100.00
90.00
450.00
LG
General Laborer
1.00
5.00 MH
62.50
100.00
62.50
312.50
OP
Operator
1.00
5.00 MH
77.00
100.00
77,00
385.00
Biditem
ROUDEBUSH INSTALL TRAVERSABLE GRASS
3 O
Takeoff Qty. 1.000 LS
Bid Qty: 1.000 LS
150080
ROUDEBUSH INSTALL TRAVERSAKE CRASS • .
Calendar:
60 10 HR 6 DAY
Hrs/Shift:10 WC:
Code not found.
Resource
Description
PeWhto Quantity unit Unncost
Tax/oTIs Actual UC
Total
4LAND
Landscaping/Erosion Control 1.00 1.00 LS 9,755.00
10D.00 9,755.00
9,755•00
Biditem
STAMPED CONCRETE INSTALLATION
4O
TakeoffQty: 1.000 LS
1.000 LS
Bid Qty:
Base Labor
burden
Total Labor Equipment Perm Mails Const Mates
Sub Trucking
Total
U. cost
4,300.00
0.00
4,300.00 780.00 1,575.D0 642.00
0.00 0.00
7,297.00
Total
4,300.00
0.00
4,300.00 780.00 1,575.00 642.00
0.00 0.00
7,297.00
Manhours
MUM
AWNnIt S/MH Base Labor/MH Total Labor/MH
Vnit/CH
60,0000
0.0167
60.0000 121.6167 71.666771.6667
Quantity:
0.1250.
099101
Base Labor
Decorative
Burden
Items
Tofat Labor Equipment Perm Math Censt Malls
Sub Trucking
Total
U. cost
4,300.00
0.00
4,300.00 780.00 1,575.00 642.00
0.00 0.00
7,297.00
Total
4,300.60 :
0.00
4,300.00 780.00. 1,575.00 642.00
0.001 0.00
7,297.00
Crow $/Unit : Crew HrslUrUt
Units/Crew Hr S/Craw Hour Shifts
Unitslghift ShlftsJUnit
S/Shift
5,080.0000 8.0000
0.1250 635.00001 0,8000
1.2500 0.8000
9,121.2500
Wnhours
UMt/MH AM/Unit
Total LabodAH-
Base Labor/UMt,
60.6000
0.0167 60.0000
71,6667
4,300.0000
Calendar:
60 10 HR 6 DAY
Hrs/Shift:10 WC:
_Code not found.
Crew:
XMIKE WSC - MIKE
Prod. HU 8 Eff: 100.00 Crew Hrs: 8.00
Labor PCs: 7.50 Equipment PCs: 2.50
17161-2 Jackson Grant Entrance 10/08/2015 2:00 PM Page 3 of 3
-THIS ESTIMATE USE T@M RATES SET BY GRADEX"
"•-'*—*Estimate created on: 10/04/2018 by User#: 12 - Thomas DeKiyen
Source estimate used: T:\HEAVYBID\ESlAGXMM
Calendars Used In Estimate
60 10HR6DAY
X-�/ Z,�,e,-93
E
21
To: Doug Haney, Corporation Counsel
From: Lisa Scott
CC: Jeremy Kashman
Date: 01 /18/19
Re: C.O. #2 North Range Line Road Reconstruction Project #16-ENG-49
Doug, please find attached 1 original of same change order for project #16-ENG-49 North Range Line Road
Reconstruction. Please review & initial for the next BPW Meeting.
Change Order #2- Original Contract Amount: $ 4,541,978.00 Increase: $25,344.25 New Contract Amount
$4,082,595.36
Thank you,
Lisa Scott
0 Page 1