Checklist Items
Project Name: PZ 19020010 DP ADLS - Christian Brothers Auto Service Center
Workflow Started: 02/13/2019 4:07 PM
Report Generated: 10/07/2019 02:42 PM
Date
Permit Type
CycleComment TypeReviewer CommentApplicant ResponseStatusUpdated ByLast UpdatedCompleted?
Completed
05/02/2019
Please provide all of the following on the cover sheet: 05/02/2019 11:11
Planning Project
1Residential-Commercialadded to Cover SheetMETAlex JordanTrue
11:11 AM
Engineering firm's name, address, phone, and email addressAM
05/02/2019
Please provide all of the following on the cover sheet: 05/02/2019 11:11
Planning Project
1Residential-Commercialadded to Cover SheetMETAlex JordanTrue
11:11 AM
developer's name, address, phone and email addressAM
05/02/2019
05/02/2019 11:11
Planning Project
1Residential-CommercialPlease provide a legal description of site on the cover sheetadded to Cover SheetMETAlex JordanTrue
11:11 AM
AM
05/02/2019
05/02/2019 11:11
Planning Project
1Residential-CommercialPlease provide the sites zone district on the cover sheetadded to Cover SheetMETAlex JordanTrue
11:11 AM
AM
05/02/2019
05/02/2019 11:11
Planning Project
1Residential-CommercialPlease provide the setback distances on the cover sheetadded to Cover SheetMETAlex JordanTrue
11:11 AM
AM
05/02/2019
05/02/2019 11:11
Planning Project
1Residential-CommercialPlease provide the sites total disturbance on the cover sheetadded to Cover SheetMETAlex JordanTrue
11:11 AM
AM
05/02/2019
Professional engineer will stamp construction level documents, 05/02/2019 11:11
Planning Project
1Residential-CommercialPlease provide a professional engineer's stamp on the plansMETAlex JordanTrue
11:11 AM
unless required for in-process plans. AM
05/02/2019
Please provide the anticipated start construction date in a Anticipated Construction Start date is July, assuming best case 05/02/2019 11:11
Planning Project
1Residential-CommercialMETAlex JordanTrue
11:11 AM
comment letter or project summaryscenario with approvals and permitting. AM
05/02/2019
Please verify with CFD that all turning radii are appropriate and Email correspondence with CFD has confirmed that turning radii 05/02/2019 11:11
Planning Project
1Residential-CommercialMETAlex JordanTrue
11:11 AM
adequate for fire trucksare appropriate for fire trucks. AM
05/02/2019
There will be not direct discharge from the site. See General note 05/02/2019 11:11
Planning Project
1Residential-CommercialPlease verify that there are no direct discharge areasMETAlex JordanTrue
11:11 AM
on C010.1 SWPPPAM
05/02/2019
Please verify that all elevations are North American Vertical Elevation datum is NAVD 88. See SPP010.0 Topographic survey 05/02/2019 11:11
Planning Project
1Residential-CommercialMETAlex JordanTrue
11:11 AM
Datum of 1988 (NAVD)and survey note on sheet C010.0 Existing conditions.AM
05/02/2019
Please verify that the horizontal datum of topgraphic map is 05/02/2019 11:11
Planning Project
1Residential-CommercialHorizontal Datum is NAD83. See SPP010.0 Topographic survey.METAlex JordanTrue
11:11 AM
Indiana State Plane Coordinates, NAD83AM
05/02/2019
Please verify that the locations of existing utilities with top of This information is shown on SPP010.0 Topographic Survey and 05/02/2019 11:11
Planning Project
1Residential-CommercialMETAlex JordanTrue
11:11 AM
curb and invert elevations, pipe sizes, and direction are shownC010.0 Existing conditions.AM
Please verify that all existing culverts, pipes, and bridges on
05/02/2019
05/02/2019 11:11
Planning Project
1Residential-CommercialN/AMETAlex JordanTrue
existing drives or under the roadway are shown indicating size,
11:11 AM
AM
type, and invert elevations
Please verify that the locations of all existing electrical power
05/02/2019
This information is shown on SPP010.0 Topographic Survey and 05/02/2019 11:11
Planning Project
1Residential-CommercialMETAlex JordanTrue
vaults, transformers, power lines, gas lines, television cable ,
11:11 AM
C010.0 Existing conditions.AM
and telephone lines are shown
05/02/2019
05/02/2019 11:11
Planning Project
1CommercialPlease provide the building coverage ratio on the cover sheetAdded to Cover SheetMETAlex JordanTrue
11:11 AM
AM
Please include the following note on the plans: "All paving
within the existing and proposed city right -of-way shall conform
to the requirements of the Department of Engineering. The
contractor shall contact the department of Engineering to
05/02/2019
05/02/2019 11:11
Planning Project
1Residential-Commercialschedule a pre-construction meeting to review the department's Added to Sheet C020.1 Site Layout. In the "Paving Notes"METAlex JordanTrue
11:11 AM
AM
construction requirements, staff notification requirements,
required inspections for certain stages of the work and to review
the authority of the department as it relates to work within the
existing and proposed right-of-way."
Please include the following note on the plans: "Damage to the
exisitng right-of-way shall be restored/repaired to the
05/02/2019
Added to sheet C010.1 Existing Conditions and Removal Plan, in 05/02/2019 11:11
satisfaction of the City at the completion of the project. The
Planning Project
1Residential-CommercialMETAlex JordanTrue
11:11 AM
the "Site Clearing and Demolition Notes".AM
contractor is encouraged to inspect the right-of-way with the city
prior to the start of construction to document the existing
condition of the right-of-way."
Please include the following note on the plans: "Utility
relocations required by the project shall be the responsibility of
05/02/2019
the developer. Utility line relocations required for road projects 05/02/2019 11:11
Planning Project
1Residential-CommercialAdded to sheet C040.0 Utility Plan in the "General Notes".METAlex JordanTrue
11:11 AM
that result in a conflict with proposed development shall be the AM
developer to resolve with the utility. Existing pole lines required
to be relocated to within one foot of proposed right-of-way line."
Page 1 of 2
Date
Permit Type
CycleComment TypeReviewer CommentApplicant ResponseStatusUpdated ByLast UpdatedCompleted?
Completed
Please include the following note on the plans: "No earth
05/02/2019
05/02/2019 11:11
Planning Project
1Residential-CommercialAdded to Sheet C010.1 SWPPP in the "General Notes".METAlex JordanTrue
disturbing activity may commence without an approved storm
11:11 AM
AM
water management permit."
05/02/2019
Please provide all technical information required by Section Any remaining information that is not already on the plans will be 05/02/2019 11:11
Planning Project
1Residential-CommercialMETAlex JordanTrue
11:11 AM
102.02(xi)(m) of the Storm Water Technical Standardsadded with the next upload. AM
05/02/2019
Please clearly show the construction limits on all sheets with Construction limits added to every plan. Also noted as "Land 05/02/2019 11:11
Planning Project
1Residential-CommercialMETAlex JordanTrue
11:11 AM
plan view (not required on profile sheets)Disturbance Delineation". AM
Storm Structures are numbered. Sanitary structures on site are
05/02/2019
05/02/2019 11:11
Planning Project
1Residential-CommercialPlease number all sanitary and storm structuresMETAlex JordanTrue
only Cleanouts and not numbered. Numbers will be assigned if
11:11 AM
AM
required.
05/02/2019
05/02/2019 11:11
Planning Project
1Residential-CommercialPlease include a soils map in the plansAdded to sheet C010.1 - SWPPP.METAlex JordanTrue
11:11 AM
AM
05/02/2019
Submit a copy of the Adjoining Property Owners List from 05/02/2019 11:14
Planning Project
1Public NoticeUploaded to the Public Notice folderMETRachel KeeslingTrue
11:14 AM
Hamilton County.AM
05/02/2019
Provide the filled out and notarized affidavit of notice of public 05/02/2019 11:14
Planning Project
1Public NoticeUploaded to the Public Notice FolderMETRachel KeeslingTrue
11:14 AM
hearing page of the application.AM
05/02/2019
Provide the filled out Notice of Public Hearing page of the 05/02/2019 11:14
Planning Project
1Public NoticeUploaded to the Public Notice FolderMETRachel KeeslingTrue
11:14 AM
application.AM
05/02/2019
05/02/2019 11:14
Planning Project
1Public NoticeSubmit Proof of Publication from the newspaper.Uploaded to the Public Notice FolderMETRachel KeeslingTrue
11:14 AM
AM
05/02/2019
05/02/2019 11:14
Planning Project
1Public NoticeSubmit Certificate of Mailing for proof of mailing.Uploaded to the Public Notice FolderMETRachel KeeslingTrue
11:14 AM
AM
05/02/2019
05/02/2019 11:18
Planning Project
1Public NoticeSubmit a copy of the Sign Affidavit.Uploaded to the Public Notice FolderMETRachel KeeslingTrue
11:18 AM
AM
Please list what ‘green’ or sustainable site or building design
aspects will implemented, similar to the LEED checklist: LED site lighting will be used for Energy savings. Stormwater
05/02/2019
05/02/2019 11:18
Planning Project
1Generalwww.usgbc.org/leed/rating-systems from the US Green runoff will be treated off-site in (3) water quality units on the Aria METRachel KeeslingTrue
11:18 AM
AM
Building Council. (This is not a requirement, but the Apartments property as part of the overall Development.
Commission looks favorably upon this.)
05/02/2019
Please submit an exhibit of the proposed black lined site plan 05/02/2019 11:18
Planning Project
1Site PlanProvided on C020.0 Site Context Plan.METRachel KeeslingTrue
11:18 AM
overlaid upon a current aerial photo of the immediate area.AM
Ground Mounted HVAC, screened by foundation plantings and
Will there be rooftop mounted equipment? Or will there be
06/18/2019
tree plantings on the south side of the building. -------------------------06/18/2019 9:07
Planning Project
1Architectural Designground mounted HVAC equipment? How will it be screened METRachel KeeslingTrue
9:07 AM
--- 2019 06 12 - AC Condenser Unit location shown on site layout AM
from view?
plan.
Added to sheet C030.0 Grading and Drainage plan ---------------------
06/24/2019
Please show the 100-year elevations of all inlets in the clogged 06/24/2019 1:09
Planning Project
1Residential-CommercialMETAlex JordanTrue
2019 06 12 - 100 year flood elevations at clogged inlets is shown
1:09 PM
condtionsPM
the the Grading and Drainage Plan.
This will be added to sheet C030.0 Grading and Drainage plan in
06/24/2019
Please provide all on-site and off-site flood routing through the the next upload. ------------------------ 2019 06 12 - On-site and off-06/24/2019 1:09
Planning Project
1Residential-CommercialMETAlex JordanTrue
1:09 PM
sitesite flood routing is shown in the Drainage Area Map for Pipe PM
sizing.
Please provide the City's paving policy in the set. This has been Please direct me to the City's Paving policy and it will be added to
06/24/2019
06/24/2019 1:09
Planning Project
1Residential-CommercialMETAlex JordanTrue
added to the "Correspondence" folder. I apologize for not the plans. ------------------------------ 2019 06 12 - Added to Details
1:09 PM
PM
providing this originally.Sheet.
Please provide the City's curbing policy in the set. This has Please direct me to the City's curbing policy and it will be added to
06/24/2019
06/24/2019 1:09
Planning Project
1Residential-CommercialMETAlex JordanTrue
been added to the "Correspondence" folder. I apologize for not the plans. ------------------------------- 2019 06 12 - Added to Details
1:09 PM
PM
providing this originally.Sheet.
07/08/2019
07/08/2019 6:42
Planning Project
1Residential-CommercialPlease submit a storm water management permit applicationStormwater management permit application will be submitted.METAlex JordanTrue
6:42 PM
PM
MFPG and MLAG Definitions added to Sheet C030.0 in the
"General Notes". The site discharges into a detention basin as part
Please provide the minimum flood protection grade (MFPG) and
07/08/2019
of the Aria Apartment development. The 100 year flooding stage of 07/08/2019 6:42
Planning Project
1Residential-Commercialminimum lowest adjacent grade (MLAG) elevations and METAlex JordanTrue
6:42 PM
this basin is 895.85. Thus is the MFPG and MLAG elevation for our PM
definitions of each
site 897.85? -------- 2019 06 12 - MLAG and MFPG Elevations and
definitions added to Grading and Drainage Plan.
Page 2 of 2
progressive
Transmittal
Project: Christian Brothers Automotive Date: April 24, 2019
File No: 70050012
City of Carmel Planning and Zoning
Attn: Joe Shestak
To: One Civic Square
Third Floor
Carmel, IN 46032
Re: Updated Info Packets for Docket#: 19020010 DP/ADLS— Christian Brothers Auto
We are sending you:
x Herewith x Originals x Overnight
Under Separate Cover Drawings General Delivery
Specifications Hand Carried
No. of Copies Description
5 Informational Packets for May 9 Plan Commission Commercial Committee
Remarks:
Please receive and distribute the 5 informational packets attached for May 9 Plan Commission
Commercial Committee. These packets contain updated site plans for DP and ADLS approval of the
Christian Brothers Automotive site.
If you have any questions, please contact:
Joshua Manion Email: manioni@progressiveae.com Phone: 616-447-3455
Cc w/Enclosures:
Christian Brothers Automotive— Billy Green Email: billy.green@cbac.com
Cc w/o Enclosures:
From: Joshua Manion, PE I JRS
Copy Author
Progressive AE 1811 4 Mile Road NEI Grand Rapids, MI 49525 1616.361.2664 i progressiveae.com
1 ,
progressive APS` 0 5.
Transmittal
Project: Christian Brothers Automotive Date: April 4, 2019
File No: 70050012
City of Carmel Planning and Zoning
Attn: Joe Shestak
To: One Civic Square
Third Floor
Carmel, IN 46032
Re: Info Packets for Docket #: 19020010 DP/ADLS—Christian Brothers Auto
We are sending you:
x Herewith x Originals x Overnight
Under Separate Cover Drawings General Delivery
Specifications Hand Carried
No. of Copies Description
9 Informational Packets for April 16 Plan Commission
Remarks:
Please receive and distribute the 9 informational packets attached for April 16 Plan Commission.
These packets are for DP and ADLS approval of the Christian Brothers Automotive site.
If you have any questions or concerns, please contact:
Joshua Manion Email: manionj@progressiveae.com Phone: 616-447-3455
Cc w/Enclosures:
Christian Brothers Automotive— Billy Green Email: billy.green@cbac.com
Cc w/o Enclosures:
From: Joshua Manion, PE I JRS
Copy Author
Progressive AE 1811 4 Mile Road NE Grand Rapids, MI 49525 616.361.2664 progressiveae.com