Loading...
HomeMy WebLinkAboutA70.3 3rd 4th and Roof Planv RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Carmel �M;T�Dta,�ADB� DATE: 02/12/19 3 ROOF PLAN - Lot 70 5 SECTION DETAIL V4mT-0' LY14TIW n dr-avd• drH nmrt� 3Y -a YB• 4 Elevation 12 AS a V4I1•-V 2 FOURTH FLOOR PLAN - Lot 70 1/d' ='II KEY PLAN - Lot 70 90 AREA OF WORK WALL TYPE LEGEND J NEW WALL NON LOAD BEARING INTERIOR PARTITION EXISTING WALLTOREMAN 0 O O GENERAL FLOOR PLAN NOTES THE FOLLOWING GENERAL NOTES PRE APPICABLE THROUGHIXIr THESE CONSTRUCTION DRAWINGS. A. NOTHING SET FORTH IN THESE DRAWINGS SHALL RELEASE THE CONTRACTOR FROM ITS RESPONSIBILITY TO PROVIDE APPROPRATE QUANTITIES, FIELD MEASUREMENTS, DIMENSIONAL STPBIIITY, INSTALLATION, ANCHORAGE, AND COORDINATION WITH All OTHER SUBCONTRACTORS AND TRANS, OR RELEASE THE CONTRACTOR OF RESPONSIBILITY TO IDENTIFY AND RESOLVE DEVIATIONS FROM THE REQUIREMENTS OF THESE DOCUMENTS, OR RELEASE THE CONTRACTOR OF RESPONSIBILITY TO ALERT THE ARCHTTECT TO ERRORS OR OMISSIONS CONTAINED THBRIN. B. THE CONTRACTOR AND ALL ITS SUBCONTRACTORS SHALL VERFY IN THE FIELD ALL NEW AND EXISTING APPICABLE CONDITIONS, DIMENSIONS, RELATIONSHIPS, ETC. SHOWN IN THESE DRAWINGS AND AS PERTNBNTTOTHEINTENTOFTHESEDRAWINGS. ANYDSCRBANCYDSCOVEREDSH BEBROUGHTTO THEATTENTIONOFTHEARCHITECTPRIORTOMECOWM EMENTOFANYWORKAFFECTEDBY,OR RELATEDTO, SUCH DISCREPANCY. TIE CONTRACTOR SHAL BE RESK SIBT FOR ALCOSTS ASSOOATED WITH, OR CAUSED BY, ITS FAILURE TO COMPLY WTTH THIS REQUIREWNT. C. ALL FLOOR RAN DMENSICNS SHOWN ON THE NEW FLOOR PANS PRE FROM FACE OF STUD WHETTER NEW OR MISTING WALL) UNLESS INDICATED OTHERWISE BY THE DESIGNATIONS "OR", "CLEAR", OR "BIN " COORDINATE WITH APPLICABLE NEW WALLTYPES AND WITH MINUCABLE SECTIONS/DETAILS. D. ALL NEW HOLLOW METAL HM). DOOR FRAMES ARE LOCATED A" FROM THE ADJACENT WALL FACE )TO OUTER EDGE OF FRAME) UNLESS DMENSIONED OR DETAILED OTHERWISE. E. COORONIATE,PROVIDE, AND INSTALL 2X FIRE TREATED WOOD WALL BLOCKING AS REQUIRE) FOR THE ANCHORAGE AND SUPPORT OF ALL NEW CASEWORK, TRIM, FIRE EXRNGUISHER CABINETS, TOILET ACCESSORES, MARKER BOARDS, TACK BOARDS, DOOR HARDWARE ACCESSORIES, ETC., AS APPLICABLE, E ALL NEW OR EMSTINIG FLOOR AREAS THAT REQUIRE LEVELING WITH A CONCRETE TOPPING OR LEVELING COMPOUND SHALL BE INSTALLED SUCH THAT THE FLATNESS EQUALS 35/2A ION ALL SLABS) AND THE LEVELNESS EQUALS ISLAB ON GRADE) AND 80%OF THAT VALUE ON ELEVATED SLABS, G. AT ALL WALIS SCHEDULED TO RC -GENE CERAMIC THE, PROVIDE GLASS MAT INTERIOR GYPSUM WALLBOARD FOR THE STANDARD GYPSUM WALLBOARD IDENTIFIED IN THE WALL TYPES, REFER TO ROOM HUSH SCHEDULE FOR LOCATIONS OF CERAMIC TILE. PROVIDE CEMENT BACKER BOARD AT NATURAL SLATE TILE, REFER TO ROOM FINISH SCHEDULE FOR LOCATIONS U SATE TILE. H. AT ALL AREAS WHERE EXISTING FLOOR COVERING OR WALL COVERING MATERIAL WAS REMOVED, THE CONTRACTOR SHALL PROPERLY PREPARE THE SURFACE TO RECEIVE NEW FINISHES. I. CONTRACTOR SHALL ENSURE THAT MY AND Al BACKBOXES LOCATED WITHIN 'PARTY WALLS' THAT SEPARATE ROOMS PRE NOT LOCATED BACKTO BACKOR IN THE SAME CAVITY. STAGGERBOXESCNE STUD CAVITY ETHER SIDE OF ONE ANOTHER, 0 Loy 3K MASTER aWIRf 1 THIRD FLOOR PLAN - Lot 70 SHELVES 1" aY NOT FULL HEIGHT WALL AGE BOTTOM WALL+ 67AFF UP TO CEILING -0" ABBE EGA ME 1lii1iil CERTIFICATION: i..TIP PvC� pMdsTE.4f0 CO No..�iP= '- ARI II -_ STATE OF C. �'',gRCkITE��c TOM BOTH COST SHAHAN AND PEOMETARV INTATO TUN PATENT CA RACINE ACCESS AND THAT HAT BE CANTED MEANT ED TO BE ANIS HUNTS IS ACT BRAND ED Iq In WtlOO� BIBBIBBIBBIN ARCHITECT BIACKUNE NET BIBBIBBIBBIN M.E.P. GENESIS ENGINEERING GROUP THAT 111601 OMAN 117,711, BIBBIBBIBBIN STRUCTURAL SCHWARZ ENGINEERING GROUP GNAW 5133 L.L 0 0 06 CIA- cli J L.L. 2 N o o Om L c o C J � pj Q 0 D J j O DRAWN: CHECKED: Author Checker 4 REASON CDs - PERMIT SET 11/=6/201e 4 A70-3 II E 0 V A �o EACH O O R