HomeMy WebLinkAboutP70.4 Plum 4th FlrJ
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Calmed (�
�VT�'lmA�(1oAA�
DATE: 02/12/19
�1 SANITARY RISER DIAGRAM LOT 70
AN
112" 5
(1 F1OURTH FLOOR SANITARY PLAN - LOT 70
14" = 1'-0"
PLAN NOTES
1 DO NOT ROUTE ANY WIRING,PIPING, DUCTWORK, ETC THROUGH LIFT SHAFT.
2 PROVIDE TO 3' STEEL PIPE BULLARDS TO PROTECT UTILITY GAS METER FROM ACCIDENTAL DAMAGE.
I I I I I 11
3 UTILITY GAS MAIN, COORDIANTE BOLLARD LOCATION WITH MAIN
4 WATER COMPANY METER PIT WITH TRAFIC RATED LID
5 REFER TO SITE PLANS FOR CONTINUATION OF 4'$MAIN.
6 REFER TO SITE PUNS FOR CONTINUATION OF 4' STORM MAIN
7 INSTALLATION OF WATER MAIN SHALL BE PER UTILITY REQUIRIEMENTS. PROTECT FROM DAMAGE DURING
CONSTRUCTION.
8 INSTALLATION OF SANITARY MAIN SHALL BE PER STATE AND LOCAL CODE. PROTECT FROM DAMAGE DURING
CERTIFICATION:
CONSTRUCTION.
9 INSTALLATION OF DEWATERING MAIN SHALL BE PER STATE AND LOCAL CODES. PROTECT FROM DAMAGE
DURING CONSTRUCTION
10 S SLEEVE THROUGH FOUNDATION WALLAND CAP FORFUTURE.
A
11 314' WATER MAIN FIELD COORDANTE LOCATION INTO STRUCTURE.
t4IU cE s'cR oE`
12 DEWATERING PIT, DESIGNED FOR RADON MITIGATION SYSTEM
RE 10708731 HE
13 PASSIVE RADON VENT, DESIGNED ROUTED AND INSTALLED BY OTHERS,AGG
$ gg
A
14 ALL ROUTEDTHE EM.
LR
;vvv4xT
MAIN,ENT
15 6'FP MAIN, PROTECT FROM DAMAGE DURING CONSTRUCTION.
PROTECTFROM THROWN CONSTRUCTION
16 FP MAIN, PROVIDE UNIT ISOLATION VALVE, FLOW AND TAMPER SWITCH AND ALL OTHER REUQI RED ACCESSORIES
(�////
TO CREATE A COMPLETE, CODE COMPLIANT AND OPERATIONAL INSTALLATION.
17 2' STORM DRAIN, CONNECT TO SITE STORM DRAINAGE SYSTEM
18 2' STORM DRAIN UP TO POLISHED BRASS AREA DRAIN
ALL INFORMATION CONTAINED IN THISCOCUMENT °
19 PROVIDE NATURAL GAS PRESSURE REDUCING 2 PSIG TO 10"WC, VALVE AND ISOLATION VALVE TO SERVE
CONSIDERED TO BE ROT" CONEDENTUAL AND
PROPRIETARY INTELLECTUAL RUPERTY Or PLACTUIE
NATUMILGASHEADER. CONTRACTOR SHALL FIELD COORDIANTE AND FIELD ROUTE ALL NATURAL GAS PIPES
STUDIO AND SHALL NOT HE COPIED RESPONDED
DUSTRIBUTED OR ASSIGNED TO A TDIRD PARTY WITHOUT
FROM THIS MANIFOLD TOALL GAS FIRED APPLIANCES. MINIMUM PIPE DIAMETER SHALL BE 314'TO ANY
AA111E MEANS
=11THO"a':ED USE OF"NEAR Docx"ENTS 15 MET
APPLIANCE, PROVIDE ISOALTION VALVE AND ALL OTHER REUQIRED ACCESSORIES IN ORDER TO MAKE FINAL
PERMITTED.
CONNECTDIONS TO ALL NATURAL GAS FIED APPLIANCES, FIREPLACES, GRILLESIIIIIIIIIIIIIR
20 DOMESTIC WATER HEATER -2V,2'INTAKE, TERMINATE PER MANUFACTURE REQUIREMENTS. TEMINATEVENT
ARCHITECT
PER CODE MINIMUM DISTANCES
21 CONTRACTOR SHALL COORDIANTE THE INSTALLATION OF ALL EQUIPMENT WITH CUSTOM LIVING NO EQUIPMENT
BLACnKXINEE
SHALL BE INSTALLED WITHOUT FULL COORDIANTION
INDIANAPOLIS INDIANADAFT °
22 PRIOR TO INSTALLATION OF ANY PLUMBING PIPING SYSTEMS, THE CONTRACTOR SHALL COORDIANTE THE PIPE
31NOFAR
ROUTING WITH ALL OTHER TRADES, INCLUDING CUSTOM LIVING NO BULKHEADS WILL BE PROVIDED TO
CONCEAL PIPING SYSTEMS WITHIN THE STRUCTIRE.
M.E.P.
23 ALL DOMESTIC WATER SHALL BE INSULATED TO PROTECT FROM FREEZING, THE CONTRACTOR SHALL INSULATE
GENESIS ENGINEERING GROUP
PIPEWITH ELASTOMERIC INSULATION AND ALSO PROVIDE FIBERGLASS BATINSULATION UNDER ALL WASTE AND
91 SOUTH MAIM SURE IT AND,°°
VENT PIPING TO FURTHER ENSURE THAT PIPE DO NOT FREEZE IN THE EVENT THAT THE GARAGE DOORS
GENESISE°IxucOu
BECOME DAMAGED
3179278307
24 RADON VENT PATHWAY, RADON VENT PROVIDED AND INSTALLED BY OTHERS.
_
25 CONTRACTOR SHALL PROVIDE WASHER BOX WITIH 2' DRAIN, WATER HAMMER ARRESTORS AND ISOLATION
STRUCTURAL
VALVES WITH SINGLE HANDLE OPERATION. COORDIANTE THE EXACT LOCATION WITH THE EQUIPMENT TO BE
INSTALLED. PROVIDE DRAIN PAN UNDERCLOTHES WASHER AND PIPE COMPLETE TO THE SANITARY DRAINAGE
SCHWARZ ENGINEERING
GROUP
SYSTEM. PROVIDE FOOD GRADE MINERAL OIL TO SEAL THE PIPE TRAP
STORM xccaM
A TBA_see
26 PROVIDE FREEZE PROOF EXTERIOR HOSE VALVE, COORDIANTE EXACT LOCATION WITH CUSTOM LIVING PRIOR
TOINSTALLATION.
27 PROVIDE 112" NATRUAL GAS CONNECTION WITH ISOLATION VALVE AND PLUG (FOR FUTURE CONNECTION)
COORDIANTE THE EXACT LOCATION WITH CUSTOM LIVING.
28 FIELD ROUTE 112NG FROM NATURALA GAS HEADER TO FIREPLACE AND CONNECT 112'NG TO NATURAL GAS FIRE
PLACE. INSTALL PER CODE AND MANUFACTURES RECOMMENDATIONS. CONTRACTOR SHALL COORDINATE THE
LOCATION OF THE NATURAL GAS SHUT-OFF VALVE WITH CUSTOM LIVING,
29 ROUTE lgNG FROM NATURAL GAS HEADERTOSTOVEIOVEN. INSTALL PER CODE AND EQUIPMENT
MANUFACTURE REQUIRIEMENTS. COORDIANTE WITH CUSTOM LIVING THE EXACT REQUIREMENTS FOR THE
APPLIANCE.
30 ROUTE 112'NG FROM HEADER TO CLOTHES DRYER. CONNECT PER CODE AND MANUFACTURES REQUIREMENTS.
COORDIANTE WITH CUSTOM LIVING THE EXACT MODEL OF EQUIPMENT TO BE INSTALLED.
31 ROUTE 311 FROM HEADER AND CONNECT PER CODE AND MANUFACTURES REQUIREMENTS.
32 DOMESTIC WATER PIPE ROUTED THROUGH PIPE SLEEVE ACROSS SANITARY MAIN
33 ROUTE CONDENSATE DRAIN AND FURNACE CONDENSATE TO FLOOR DRIAN I OPEN SITE DRAIN, PROVIDEDRAIN
PAN UNDER ALL MECHANICAL EQUIPMENT AND ROUTE DRAIN TO FLOOR DRAIN. COORDIANE THE INSTALLATION
OF THE FURNACE WITH THE DRAIN, NO EQUIPMENT OR PIPE SHALL BE INSTALLED WITHOUT COORDINATION
WITH CUSTOM LIVING.
34 ROUTE DOMESTIC HOT AND COLDWATER FROM RISERS AT THIS LOCATION TO SERVE ALL PLUMBING FIXTURES.
NO WATER PIPE SHALL BE ROUTED IN ANY UN -HEATED SPACE WITHOUT CDORDIANTION WFIH CUSTOM LIVING.
35 PROVIDE CHECK VALVE ON DHW RETURN MAIN TO ENSURE NO BACK FLOW HOWATER TO PLUMBING FIXTURES.
CONNECT FIXTURES ON THIRD AND FOURTH LEVELS TO WATER PIPES ON THIS FLOOR
36 INSTALL REFRIGERATOR BOX WITH MINI-ARRSTOR, CONNECT PER MANUFACTURES REQUIREMENTS.
COORDIANTE THE EXACT LOCATION WITH CUSTOM LIVING.
Z
37 PROVIDE FIXTURE AND INSTALL COMPLETE, PROVIDE FOOD WASTE GRINDER, CONNECT DISHWASHER
COMPLETE. COORDIANTE ALL FIXTURES WITH CUSTOM LIVING PRIOR TO THE INSTALLATION OF ANY PIPE.
J
38 COORDIANTE ALL FIXTURES AND TRIM WITH CUSTOM LIVING, COORDIANTE ALL ROUGH -IN LOCATIONS AND
ELEVATIONS WITH CUSTOM LIVING PRIOR TO INSTALLATION OF ANY PIPING.
a
39 4'ST UP, FOR EXTERIOR DOWNSPOUT
40 COORDIANTE THE LOCATION OF THE FREE STANDING TUB 29W AND THE SHOWER FLOOR DRAIN LOCATION WITH
wN�
Lf.
CUSTOM LIVING PRIOR TO INSTALLATION OF ANY PIPE.
O
41 ALL SINKS WITH ADJACENT ICE MACHINES SHALL BE PROVIDED A TAIL PIECE ON THE SECOND BASIN TO ALLOW
FOR THE ICE MACHINE PUMP TO PUMP DISCHARGE WATER INTO THE SINK DRAINAGE SYSTEM, COORDIANTE
O
WITH CUSTOM LIVING ALL REQUIREMENTS.
J
LL
W
U
z N
z
—
� w c
v
O
E
rn
LL
R
w ;
c.)
0 0
Ur
p DO
Z
U)
r
m 0
R
m
9a
wa
0
0
Lf)
J a
a
0
a
DRAWN'. CHECKED'.
Author Checker
A REVISION
AN,
Motion and Main Brownstone
Interior Remodel — Units 90,
60,70,50
111112019
IIIIIIIIIIIIIR
® P70.4