Loading...
HomeMy WebLinkAboutA005 - ENLARGED PLAN - MAIN LEVEL STAIRSGAGAS GAS GAS E / LE / L E / L E / L E / L E / L E / L E / L E / L7'-4"6'-5"3 1/2" 3'-0"6'-5"4'-0 3/8" 1 9'-2 3/4"6'-0 1/2"A1 9A19 B1 9B19 C1 9C19 A20A20 A21A21 B21B21 MAIN LEVEL STAIRS UP DN BASEMENT LEVEL PATIO (BELOW) MAIN LEVEL STAIR PLAN NOTES:MAIN LEVEL STAIR PLAN NOTES: REFER TO SELECTIONS SHEET FOR ALL FINISH MATERIAL SELECTIONS. FURNISH & INSTALL NEW CAST-IN-PLACE CONCRETE STAIRS & LANDING AT MAIN LEVEL DOOR AS SHOWN ON PLANS. F/I NEW PAVER OVERLAY & STONE STAIR TREAD OVERLAY AT NEW CONCRETE STAIRS & LANDING. F/I NEW STONE VENEER AT NEW CONCRETE STAIR RISERS. F/I NEW STONE VENEER AT EXTERIOR FACE OF BASEMENT LEVEL RETAINING WALLS. F/I NEW STONE CAP AT TOP OF BASEMENT LEVEL RETAINING WALLS. F/I NEW PREFINISHED ALUMINUM RAILING AT NEW MAIN LEVEL STAIRS & LANDING. F/I NEW PREFINISHED ALUMINUM RAILING AT TOP OF BASEMENT LEVEL RETAINING WALLS AS SHOWN ON PLANS. PAVER STONE "A" PAVER STONE "D" PAVER STONE "C" #1 of 27 Date: 1.24.19 Sheet: Revision: www.caseindy.com 99 E. Carmel Drive, Suite 100 Carmel, Indiana 46032 317.846.2600 317.846.2601(f) These drawings have been prepared by Case Design & Remodeling solely for its use and should not be reproduced or relied upon by any other parties. Dimensions shown or scaled are subject to change per actual job condition and must be verified. Materials are to be supplied as specified as equal or standard when not uniquely specified. Installed materials may vary in appearance from drawings. Reference manufacturer's product data for actual appearance and specifications.Federici ResidencePavilion & Outdoor LivingJohn & Devana Federici12966 Pontell Pl.Carmel, Indiana 46074Approved By: Date: 5 FINAL SCALE: 3/8" = 1' Jordan Stocklin Designer jstocklin@caseindy.com ENLARGED PLAN - MAIN LEVEL STAIRS Dave Null Lead Designer dnull@caseindy.com #2 1.29.19 02/13/19 Mike Sheeks