HomeMy WebLinkAboutA007 - ENLARGED PLANS - PAVILIONSGAS GAS GASGASGAS GAS E / L E / LE / L1'-4" 5'-1 1/4" 6'-0" 5'-1 1/4" 1'-4"1'-4" 8'-5 1/4" 1'-4" 8'-8" 1'-6"8"8'-8" 8" 10"1'-6" 1'-4"1'-4" 1'-4" 1'-4"9'-9 1/4" 9'-9 1/4"17'-6 1/2"A1 3A13
A1 4A14
A15A15
A1 6A16
A17A17
B1 7B17
A18A18
B18B18
PAVILION
B23B23
A23A23
C23C23
A24A24 2'-5"2'-0" 4'-0" 3"5'-0"2'-6" 2'-5"8'-8"7'-6"6'-3"2'-8"2'-0"9'-8 1/2" 1'-9 1/4"9"2'-0"8'-8"3"2'-6"2'-5"A1 3A13
A1 6A16
A1 7A17
B1 7B17 RTF24-29-AC RTF48-29-ACRTF30-29-AC
RTF60-29-AC RTF30-29-AC A24A24
PAVILION NOTES:PAVILION PLAN NOTES:
REFER TO SELECTIONS SHEET FOR ALL FINISH MATERIAL SELECTIONS.
F/I NEW 1/2" GAS LINE TRENCHED UNDERGROUND FROM EXISTING STUB OUT AT HOME WALL TO
NEW GRILL AREA.
FURNISH & INSTALL (6) 6X6 TREATED GROUND-CONTACT WOOD POSTS AT NEW PAVILION
FOUNDATION AS SHOWN ON PLANS.
F/I NEW PAVER PATIO IN PAVILION AREA AS SHOWN ON PLANS.
F/I 3-PLY 11 7/8" LVL HEADERS BETWEEN NEW POSTS FOR NEW PAVILION ROOF STRUCTURE.
F/I 2X8 RAFTERS @ 16" O.C. W/ 7/16" OSB DECKING FOR NEW PAVILION ROOF STRUCTURE.
F/I 2X10 CEILING JOISTS @ 16" O.C. FOR NEW PAVILION CEILING AT 9' ABOVE FINISHED PAVER PATIO.
F/I 2X6 FRAMING @ 16" O.C. W/ 7/16" OSB SHEATHING FOR NEW PAVILION GABLE END WALLS.
F/I 2X4 TREATED FRAMING @ 16" O.C. FOR NEW HALF-HEIGHT WALLS, POST BASES, & BAR-BACK
WALL AS SHOWN ON PLANS.
F/I 2X4 TREATED FRAMING @ 16" O.C. FOR NEW FULL-HEIGHT FEATURE WALL AT PAVILION END AS
SHOWN ON PLANS.
F/I 1/2" CEMENT BACKER BOARD AT ALL NEW FRAMED HALF-HEIGHT WALLS, POST BASES, & BAR-
BACK WALL, AND FULL-HEIGHT FEATURE WALL.
F/I NEW RTF SYSTEMS MODULAR CABINET BOXES AT BAR AREA AS SHOWN ON PLANS.
F/I GRANITE COUNTERTOPS AT NEW BAR AREA CABINETS & BAR-BACK RAISED SEATING AREA.
F/I STONE WALL CAPS & PIER CAPS AT ALL NEW HALF-HEIGHT WALLS & POST BASES.
F/I STONE VENEER AT ALL SIDES OF ALL NEW HALF-HEIGHT WALLS, POST BASES, & FULL-HEIGHT
FEATURE WALL.
F/I STONE VENEER AT ALL SIDES OF ALL NEW BAR AREA CABINET BOXES.
INSTALL (1) HOMEOWNER PROVIDED STORAGE CABINET INSERT, (1) H.O.P. ACCESS DOOR SET, & (1)
H.O.P. TRASH PULL-OUT INSERT IN NEW BAR AREA CABINETS AS SHOWN ON PLANS. HOMEOWNER
TO PROVIDE GRILL INSERT & REFRIGERATOR APPLIANCES & INSTALLATION.
F/I 1X SMOOTH CEDAR TRIM AT NEW PAVILION POSTS & HEADERS.
F/I FIBER CEMENT SIDING & 1X4 SMOOTH CEDAR FRIEZE AT NEW PAVILION GABLE END WALLS.
F/I FIBER CEMENT VENTED SOFFIT & 1X6 SMOOTH CEDAR FASCIA AT OVERHANGS OF NEW PAVILION
ROOF.
F/I 1X6 CLEAR PINE TONGUE & GROOVE CARSIDING CEILING INSIDE NEW PAVILION.
F/I 1X4 SMOOTH CEDAR CROWN TRIM INSIDE NEW PAVILION.
PAVER STONE "A"
PAVER STONE "D"
PAVER STONE "C"
#1
of
27
Date:
1.24.19
Sheet:
Revision:
www.caseindy.com
99 E. Carmel Drive, Suite 100
Carmel, Indiana 46032
317.846.2600 317.846.2601(f)
These drawings have been
prepared by Case Design &
Remodeling solely for its use and
should not be reproduced or relied
upon by any other parties.
Dimensions shown or scaled are
subject to change per actual job
condition and must be verified.
Materials are to be supplied as
specified as equal or standard
when not uniquely specified.
Installed materials may vary in
appearance from drawings.
Reference manufacturer's product
data for actual appearance and
specifications.Federici ResidencePavilion & Outdoor LivingJohn & Devana Federici12966 Pontell Pl.Carmel, Indiana 46074Approved By:
Date:
SCALE: AS NOTED 7
FINAL
Jordan Stocklin
Designer
jstocklin@caseindy.com
ENLARGED PLANS - PAVILION
Dave Null
Lead Designer
dnull@caseindy.com
SCALE: 1/4" = 1'
PAVILION FLOOR PLANAA
SCALE: 1/2" = 1'
ENLARGED BAR PLANBB
#2 1.29.19
02/13/19
Mike Sheeks