Loading...
HomeMy WebLinkAboutA007 - ENLARGED PLANS - PAVILIONSGAS GAS GASGASGAS GAS E / L E / LE / L1'-4" 5'-1 1/4" 6'-0" 5'-1 1/4" 1'-4"1'-4" 8'-5 1/4" 1'-4" 8'-8" 1'-6"8"8'-8" 8" 10"1'-6" 1'-4"1'-4" 1'-4" 1'-4"9'-9 1/4" 9'-9 1/4"17'-6 1/2"A1 3A13 A1 4A14 A15A15 A1 6A16 A17A17 B1 7B17 A18A18 B18B18 PAVILION B23B23 A23A23 C23C23 A24A24 2'-5"2'-0" 4'-0" 3"5'-0"2'-6" 2'-5"8'-8"7'-6"6'-3"2'-8"2'-0"9'-8 1/2" 1'-9 1/4"9"2'-0"8'-8"3"2'-6"2'-5"A1 3A13 A1 6A16 A1 7A17 B1 7B17 RTF24-29-AC RTF48-29-ACRTF30-29-AC RTF60-29-AC RTF30-29-AC A24A24 PAVILION NOTES:PAVILION PLAN NOTES: REFER TO SELECTIONS SHEET FOR ALL FINISH MATERIAL SELECTIONS. F/I NEW 1/2" GAS LINE TRENCHED UNDERGROUND FROM EXISTING STUB OUT AT HOME WALL TO NEW GRILL AREA. FURNISH & INSTALL (6) 6X6 TREATED GROUND-CONTACT WOOD POSTS AT NEW PAVILION FOUNDATION AS SHOWN ON PLANS. F/I NEW PAVER PATIO IN PAVILION AREA AS SHOWN ON PLANS. F/I 3-PLY 11 7/8" LVL HEADERS BETWEEN NEW POSTS FOR NEW PAVILION ROOF STRUCTURE. F/I 2X8 RAFTERS @ 16" O.C. W/ 7/16" OSB DECKING FOR NEW PAVILION ROOF STRUCTURE. F/I 2X10 CEILING JOISTS @ 16" O.C. FOR NEW PAVILION CEILING AT 9' ABOVE FINISHED PAVER PATIO. F/I 2X6 FRAMING @ 16" O.C. W/ 7/16" OSB SHEATHING FOR NEW PAVILION GABLE END WALLS. F/I 2X4 TREATED FRAMING @ 16" O.C. FOR NEW HALF-HEIGHT WALLS, POST BASES, & BAR-BACK WALL AS SHOWN ON PLANS. F/I 2X4 TREATED FRAMING @ 16" O.C. FOR NEW FULL-HEIGHT FEATURE WALL AT PAVILION END AS SHOWN ON PLANS. F/I 1/2" CEMENT BACKER BOARD AT ALL NEW FRAMED HALF-HEIGHT WALLS, POST BASES, & BAR- BACK WALL, AND FULL-HEIGHT FEATURE WALL. F/I NEW RTF SYSTEMS MODULAR CABINET BOXES AT BAR AREA AS SHOWN ON PLANS. F/I GRANITE COUNTERTOPS AT NEW BAR AREA CABINETS & BAR-BACK RAISED SEATING AREA. F/I STONE WALL CAPS & PIER CAPS AT ALL NEW HALF-HEIGHT WALLS & POST BASES. F/I STONE VENEER AT ALL SIDES OF ALL NEW HALF-HEIGHT WALLS, POST BASES, & FULL-HEIGHT FEATURE WALL. F/I STONE VENEER AT ALL SIDES OF ALL NEW BAR AREA CABINET BOXES. INSTALL (1) HOMEOWNER PROVIDED STORAGE CABINET INSERT, (1) H.O.P. ACCESS DOOR SET, & (1) H.O.P. TRASH PULL-OUT INSERT IN NEW BAR AREA CABINETS AS SHOWN ON PLANS. HOMEOWNER TO PROVIDE GRILL INSERT & REFRIGERATOR APPLIANCES & INSTALLATION. F/I 1X SMOOTH CEDAR TRIM AT NEW PAVILION POSTS & HEADERS. F/I FIBER CEMENT SIDING & 1X4 SMOOTH CEDAR FRIEZE AT NEW PAVILION GABLE END WALLS. F/I FIBER CEMENT VENTED SOFFIT & 1X6 SMOOTH CEDAR FASCIA AT OVERHANGS OF NEW PAVILION ROOF. F/I 1X6 CLEAR PINE TONGUE & GROOVE CARSIDING CEILING INSIDE NEW PAVILION. F/I 1X4 SMOOTH CEDAR CROWN TRIM INSIDE NEW PAVILION. PAVER STONE "A" PAVER STONE "D" PAVER STONE "C" #1 of 27 Date: 1.24.19 Sheet: Revision: www.caseindy.com 99 E. Carmel Drive, Suite 100 Carmel, Indiana 46032 317.846.2600 317.846.2601(f) These drawings have been prepared by Case Design & Remodeling solely for its use and should not be reproduced or relied upon by any other parties. Dimensions shown or scaled are subject to change per actual job condition and must be verified. Materials are to be supplied as specified as equal or standard when not uniquely specified. Installed materials may vary in appearance from drawings. Reference manufacturer's product data for actual appearance and specifications.Federici ResidencePavilion & Outdoor LivingJohn & Devana Federici12966 Pontell Pl.Carmel, Indiana 46074Approved By: Date: SCALE: AS NOTED 7 FINAL Jordan Stocklin Designer jstocklin@caseindy.com ENLARGED PLANS - PAVILION Dave Null Lead Designer dnull@caseindy.com SCALE: 1/4" = 1' PAVILION FLOOR PLANAA SCALE: 1/2" = 1' ENLARGED BAR PLANBB #2 1.29.19 02/13/19 Mike Sheeks