HomeMy WebLinkAboutA008 - ENLARGED PLAN - FIREPITGAS GAS GAS GAS GASE /15'-0" 1'-4" 1'-4"1'-4"8"6'-0"2'-0"A22A22
B22B22
C22C22
D22D22
PATIO
FIREPIT
PLAN FIREPIT PLAN NOTES:
REFER TO SELECTIONS SHEET FOR ALL FINISH MATERIAL SELECTIONS.
F/I NEW 1" GAS LINE TRENCHED UNDERGROUND FROM GAS METER TO NEW FIREPIT AREA.
FURNISH & INSTALL NEW CMU SEATING WALL & COLUMNS STRUCTURE ON COMPACTED FILL AS
SHOWN ON PLANS.
F/I NEW PAVER PATIO IN FIREPIT AREA AS SHOWN ON PLANS.
F/I NEW RTF SYSTEMS NATURAL GAS FIREPIT W/ 60" LINEAR BURNER, BURNER TRAY MEDIA, KEY
VALVE, & MATCH-THROW IGNITION AS SHOWN ON PLANS.
F/I STONE WALL CAPS & PIER CAPS AT NEW SEATING WALL & COLUMNS.
F/I STONE VENEER AT ALL SIDES OF NEW SEATING WALL & COLUMNS.
PAVER STONE "A"
PAVER STONE "D"
PAVER STONE "C"
#1
of
27
Date:
1.24.19
Sheet:
Revision:
www.caseindy.com
99 E. Carmel Drive, Suite 100
Carmel, Indiana 46032
317.846.2600 317.846.2601(f)
These drawings have been
prepared by Case Design &
Remodeling solely for its use and
should not be reproduced or relied
upon by any other parties.
Dimensions shown or scaled are
subject to change per actual job
condition and must be verified.
Materials are to be supplied as
specified as equal or standard
when not uniquely specified.
Installed materials may vary in
appearance from drawings.
Reference manufacturer's product
data for actual appearance and
specifications.Federici ResidencePavilion & Outdoor LivingJohn & Devana Federici12966 Pontell Pl.Carmel, Indiana 46074Approved By:
Date:
8
FINAL
ENLARGED PLAN - FIREPIT
SCALE: 3/8" = 1'
Jordan Stocklin
Designer
jstocklin@caseindy.com
Dave Null
Lead Designer
dnull@caseindy.com
#2 1.29.19
02/13/19
Mike Sheeks