Loading...
HomeMy WebLinkAboutA008 - ENLARGED PLAN - FIREPITGAS GAS GAS GAS GASE /15'-0" 1'-4" 1'-4"1'-4"8"6'-0"2'-0"A22A22 B22B22 C22C22 D22D22 PATIO FIREPIT PLAN FIREPIT PLAN NOTES: REFER TO SELECTIONS SHEET FOR ALL FINISH MATERIAL SELECTIONS. F/I NEW 1" GAS LINE TRENCHED UNDERGROUND FROM GAS METER TO NEW FIREPIT AREA. FURNISH & INSTALL NEW CMU SEATING WALL & COLUMNS STRUCTURE ON COMPACTED FILL AS SHOWN ON PLANS. F/I NEW PAVER PATIO IN FIREPIT AREA AS SHOWN ON PLANS. F/I NEW RTF SYSTEMS NATURAL GAS FIREPIT W/ 60" LINEAR BURNER, BURNER TRAY MEDIA, KEY VALVE, & MATCH-THROW IGNITION AS SHOWN ON PLANS. F/I STONE WALL CAPS & PIER CAPS AT NEW SEATING WALL & COLUMNS. F/I STONE VENEER AT ALL SIDES OF NEW SEATING WALL & COLUMNS. PAVER STONE "A" PAVER STONE "D" PAVER STONE "C" #1 of 27 Date: 1.24.19 Sheet: Revision: www.caseindy.com 99 E. Carmel Drive, Suite 100 Carmel, Indiana 46032 317.846.2600 317.846.2601(f) These drawings have been prepared by Case Design & Remodeling solely for its use and should not be reproduced or relied upon by any other parties. Dimensions shown or scaled are subject to change per actual job condition and must be verified. Materials are to be supplied as specified as equal or standard when not uniquely specified. Installed materials may vary in appearance from drawings. Reference manufacturer's product data for actual appearance and specifications.Federici ResidencePavilion & Outdoor LivingJohn & Devana Federici12966 Pontell Pl.Carmel, Indiana 46074Approved By: Date: 8 FINAL ENLARGED PLAN - FIREPIT SCALE: 3/8" = 1' Jordan Stocklin Designer jstocklin@caseindy.com Dave Null Lead Designer dnull@caseindy.com #2 1.29.19 02/13/19 Mike Sheeks