Loading...
HomeMy WebLinkAboutA 100F NOTES- DEMOLITION PLAN REFER TO SHEET A001 FOR GENERAL NOTES AND LEGENDS • NOT ALL NOTES APPEAR ON EACH SHEET 01 REMOVE AND SALVAGE EXISTING DOOR, FRAME, AND HARDWARE FOR RELOCATION. 02 DEMO EXISTING CEILING GRID FOR NEW CEILING IN HATCHED AREA. IXt EXISTING COUNTERS TO REMAIN. W REMOVE GYPSUM BOARD AT BASE OF WALL AS REQUIRED BY EPDXY FLOOR BASE DETAIL. REFER TO INTERIOR FINISH DRAWINGS. 06 LEAVE EXISTING CEILING GRID. W DEMO AREAFORBULKHEAD. DEMOLITION SYMBOLS LEGEND --- XX EXISTING COLUMN LINE 00 DEMOLITION NOTE DESIGNATION EXISTING WALL TO REMAIN EXISTING WALL TO BE REMOVED EXISTING DOORAND FRAME TO o REMAIN EXISTING DOORAND FRAME TO BE REMOVED of 10 EXISTING WINDOW AND FRAMETO REMAIN Q EXISTING WINDOW AND FRAMETO BE REMOVED GENERAL DEMOLITION NOTES A, THE CONTRACTOR SHALL PROVIDE ALLTEMPORARY PARTITIONS AND TEMPORARY DOORS AS DEEMED NECESSARY BY THE ARCHITECT, ENGINEER AND OWNER. THEY SHALL BE WELL MAINTAINED AND ANY DAMAGE REPAIRED IMMEDIATELY TO AVOID MIGRATION OF DUST INTO ADJOINING AREAS. B, EXISTING WALL, FLOOR, CEILINGS, AND CASEWORK FINISHES TO REMAIN SHALL BE PROTECTED AND ANY DAMAGE RESULTING FROM DEMOLITION WORK SHALL BE REPAIRED, C. WHEN DEMOLITION CAUSES DAMAGE TO FLOOR, WALL OR CEILING SURFACES THAT WILL REMAIN EXPOSED IN THE FINISHED WORK, SUCH DAMAGE SHALL BE REPAIRED AS REQUIRED TO RECEIVE NEW FINISHES. D. THE CONTRACTOR S HALL COVER AND PROTECT OWNERS EQUIPMENT WHICH CANNOT BE REMOVED FROM THE PROJECT AREA. E. WHERE EXTERIOR WALLS, DOORS ANDIOR WINDOWS ARE TO BE REMOVED OR MODIFIED, THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THAT THE EXISTING BUILDING REMAINS SECURE, WEATHER TIGHT, AND WITHOUT DRAFTS, F. MAKE ALL DEMOLITION CLEAN AND COMPLETE AND INA MANNER SUITABLE TO ACCEPT NEW FINISHES ANDIOR SURFACES. G. REMOVE ALL EXISTING WALL MOUNTED ITEMS WITHIN THE PROJECT LIMIT AREA WHICH ARE NOT NOTED TO REMAIN. THE CONTRACTOR SHALL DISPOSE OF THESE ITEMS AFTER INSPECTION BY THE OWNER FOR FUTURE USE. IF ITEMS ARE REMOVED FROM WALLS THAT ARE TO REMAIN, THE CONTRACTOR SHALL PATCH WALLS AS REQUIRED TO RECEIVE NEW FINISHES ANDIOR SURFACES. H. DEMOLITION FOR BUILDING SERVICES AND UTILITIES SHALL BE PERFORMED BY THE TRADE RESPONSIBLE FOR THAT UTILITY. FOR EXAMPLE, PLUMBING FIXTURES SHALL BE DEMOLISHED BY THE MECHANICAL CONTRACTOR. OPENINGS FOR DEMOLISHED UTILITIES SHALL BE INFILLED BY TRADE RESPONSIBLE FOR PIPING, DUCT OR CONDUIT DEMOLITION. OPENINGS THROUGH FIRE RATED CONSTRUCTION SHALL BE PATCHED TO MATCH EXISTING CONSTRUCTION OR BE FIRESTOPPED. REMOVE EXISTING FLOOR AND BASE MATERIALS IN ALL AREAS SCHEDULED TO RECEIVE NEW FLOOR AND BASE, REFER TO FINISH DRAWINGS OR SCHEDULES. REMOVE FLOOR AND BASE ADHESIVES AND PREPARE SURFACES AS REQUIRED TO RECEIVE NEW FINISHES. MAKE DEMOLITION CLEAN AND COMPLETE INA MANNER SUITABLE TO ACCEPT NEW FINISHES ANDIOR SURFACES. J, REMOVE EXISTING WALL FINISHES ON ALL WALLS SCHEDULED TO RECEIVE NEW FINISHES. REFERTOFINISH DRAWINGS FOR LOCATIONS OF NEW FINISHES. REMOVE EXISTING WALL COVERINGS AND ADHESIVES, PREPARE WALL SURFACES AS DETAILED IN SPECIFICATIONS. K. EXISTING MINI BLINDS TO REMAIN. PROTECT AS NECESSARY TO PREVENT DAMAGE. REFER TO GENERAL FINISH NOTES ON SHEET IF001. BSA BSA LifeStructures 9365 Counselors Row Suite 300 Indianapolis, IN 46240.1478 ph 317.819.7878 fx 317.819.7288 www.bsalifestructures.com VISIONFIRST Indiana Lions Eye Bank OFFICE AND LAB RENOVATION CLIENT PROJECT NO. - 21160001 CONSTRUCTION DOCUMENTS (RN NORTH MARK I DATE DESCRIPTION 13 No.`° AR10500148 STATE OF FIRST FLOOR DEMOLITION PLAN RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City offl Conned �11AGIDwW1,Io1AL DATE: 02/20/19 DATE DEC. 19, tole BSALS PROJECT NO. 21160001 Al00