Loading...
HomeMy WebLinkAboutA 500Ic VARIES VARIES * REFER TO WALL TYPES- BACK TO BACK RUNNER REFER TO WALL TYPES BACK TO BACK RUNNER CHANNELS OR 6"METAL STUD CHANNELS OR 6"METAL STUD I BOX HEADER (FOR OPENINGS I BOX HEADER (FOR OPENINGS �I LARGER THEN 36") LARGER THEN 36") METAL RUNNER CHANNEL I METAL RUNNER CHANNEL CONTINUOUS SEALANT AROUND CONTINUOUS SEALANT AROUND FRAME (BOTH SIDES( FRAME (BOTH SIDES( HOLLOW METAL FRAME sea HOLLOW METAL FRAME MINERAL WOOL BLANKET MINERAL WOOL BLANKET INSULATION 7V INSULATION GLAZING REFER TO OPENING DOOR REFER TO OPENING 115'1611 15116' WALL+1' SCHEDULE 115'16'L4 ILA 115116' WALL+p SCHEDULE SECTION DETAIL SECTION DETAIL VARIES VARIES IN N. REFER TO WALL TYPES REFER TO WALL TYPES 0 DUE LE METAL STUD O DUE LE METAL STUD 112, 12' 12' - 12' CONTINUOUS SEALANT AROUND CONTINUOUS SEALANT AROUND FRAME (BOTH SIDES( FRAME (BOTH SIDES( HOLLOW METAL FRAME HOLLOW METAL FRAME FILL FRAME WITH MINERAL WOOL BLANKET INSULATION 20 FILL FRAME WITH MINERAL WOOL BLANKET INSULATION JAMB ANCHOR - JAMB ANCHOR DOOR REFER TO OPENING GLAZING REFER TO OPENING SCHEDULE 115116' 115'16' SCHEDULE 1 15116' 1 15116' WALL +1' WALL+ 1' PLAN DETAIL PLAN DETAIL HM FRAME (GLAZED OPENING) HM FRAME®TYPICAL INTERIOR PARTITION 2 1 1 112" = J%Om 1 1I2" = 1'-0" D ytL FR5 DOUBLE SIA EE TIE T VARIES SEESCHEDULE W GLASS w y N RELEASED FOR CONSTRUCTION W Subject to compliance with all regulations of State and Local Codes City of Camel GLASS (} M11NGIC d�oAAL IED DOORS DATE: \ 02/20/19 z FR4 DO SRDFE I EE WI VARIES SEE SCHEDULE r VARIES �( m z SEESCHEDULE w �a y N O FR3 WINDOW FRAME VARIES SEE SCHEDULE W FLUSH FLUSH w GLASS GLASS _ w N � h h 2 NN Q 6 m > B2.11C2.1-FLUSH B2.31 C2.3-HALF LITE B -EQUAL PAIR I C -EQUAL PAIR DUAL EGRESS 2' VARIES 2' SEE SCHEDULE o W a Of FI DOR I INF FR2 FIRAME r VARIES 2m z LEE SCHEDULE w W N K 7 F R 1 DOORFRAME C VARIES )eAeVARIES Ne SEE SCHEDULE IEESCHEDULI FLUSH w w w aWi 7'-6' y W W no A1.11 E1.1-FLUSH Ai.6-LOUVER A - SINGLE I E- EMERGENCY EGRESS OPENING# RATING ROOM NAME (MIN&) HEIGHT OPENING SCHEDULE OPENING SIZE OPENING CONSTRUCTION INACTIVE WIDTH IEAFWIDTH FRAME CONSTRUCTION h r Wo DuerJlW Set REMARKS 100A 100.2 CEO CEO 8'-0' T-1a, 3'-O' T-1a, P a' WD GL WD GL WD GL WD GL WD GL WD WD GL WD GL GL GL WD WD WD WD WD GL WD WD GL WD GL WD GL WD GL WD GL WD WD WD GL WD GL WD WD HM WD WD WD WD GL GL WD WD WO WD WD WD GL WD GL GL GL GL GL GL AM W3.1 A1.1 W3.1 AM W3.1 AIA W2.1 AM W2.1 AIA AM W3.1 AIA W2.1 JL7 J1.7 AM All Af.f AIA AM W2.1 AIA AM W2.1 A1.1 W2.1 Af.f W3.1 AM W3.1 Al. W3.1 AIA AM AIA W2.1 ALL W3.1 82.1 B2.1 B2.3 A1.6 Af.f AIA A1.1 Wf.f W1.1 A1.7 A1.1 Af.f ALA Af.f A1.1 W2.1 Sf.f ALL W2.1 W2.1 W2.1 J1.7 J1.7 J1.7 HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM FR1 FR3 FRI FRIG FRI FR3 FRI FR3 FRI FR3 FRI FRI FR3 FRI FPS FR4 FR4 FRI FRI FRI FRI FRI FR3 FRI FRI FR3 FRI FR3 FRI FR3 FRI FR3 FRI FR3 FRI FRI FRI FR3 FRI FR3 FRI FRI FPS FRI FRI FRI FRI FR2 FR2 FRI FRI FRI FRI FRI FRI FR2 FRI FRI FR2 FR2 FR2 FR4 FR4 FR4 lIA100 2IA5O0 IIA500 VAWO lIA500 21AW0 11AWO 2IA500 lIA500 21A500 11AW0 IIA500 21A500 11AWD VAWD 2IA500 21AW0 11AMO lIA500 lIA500 11AW0 lIA500 21A500 11A500 11AWD 21A500 IIA500 21A500 IIA500 21AWD lIA500 2IA500 11AW0 21A500 IIA500 11AWD VAWD 2IA500 VAWD VAWD VAWD 11AW0 VAWO VAWD VAWD IIA500 11AW0 21AW0 21A5O0 IIA500 VAWD IIA500 lIA500 IIA500 IIA500 VAWO lIA500 21A500 21AS00 21AWO IIA500 11AWO 11A500 101.1 COO 8'-0. 3'-0' P coo 7-10' 7-10' P DIR OF CLINICAL SERVICES 6'-O' 3'-0' an DIR OF CLINICAL SERVICES T-1P T-1P P 101.2 102.1 102.2 INA ACCOUNTING S'-0. 3'-0' P 104.2 ACCOUNTING 6'-O' T-2' an 105J HR 8'-0. 3'-0' a' RELOCATED DOOR 1052 HR T-1a, 6-2' P 1Do CONFERENCE S'-0. 3'-0' a' 107.1 CONFERENCE 6'-0. 3'-0' P 107.2 CONFERENCE 8'-0' 9'-4- P 410.1 CONFERENCE 8'-0' 3'-0' P 110.2 CONFERENCE T-10' 5-2' P 112.1 VESTIBULE T-10' 3'-0' 1122 VESTIBULE T -iP 3'-0' 115 FOCUS BOOTH 8'-O' 3'-O' P 116 FOCUS BOOTH 8'-0. 3'-0' U' 117 FOCUSBOOTH 8'-0. 3'-0' P 120 STORAGE S'-0. 3'-0' a' 122.1 DIRECTOR OF RID 8'-0' 3'-0' D' 122.2 DIRECTOR OF RID T-1a, 6-2' a' RELOCATEDDOOR RELOCATED DOOR RELOCATED DOOR RELOCATED DOOR RELOCATED DOOR 124 128.1 123.2 MENS RESTROOM 8'-0' 3'-0' a' MARKETINGICOMM. 8'-O' 3'-O' P MARKETINGICOMM. T-1a, 6-2' a' RELOCATED DOOR 129.1 DIRECTOR OF DONOR 8'-0' 3'-0' P SRVS RELOCATED DOOR 129.2 DIRECTOR OF DONOR T -iP 5'-2' P SRVS 131 BUILDING MAINTSTORAGE 8'-0' 3'-0' 0' 136.1 DIRECTOR OF PRO SV T-1P T-10' P 137.1 DIRECTOR OF BUS. V-Om 3'-O- an DEVELOP. 1372 DIRECTOR OF BUS. T-1a, T-10' an DEVELOP. 138.1 DIRECTOR OF DEVELOP. 8'-O' 3'-0. ON 138.2 DIRECT OR OF DEVELOP. T-10' T-10' an RELOCATED DOOR 147 WY7ME IS RESTROOM 8'-0' 3-0' P 142 ELECTRICAL 8'-O' 3.O' 0' 143.1 DIRECTOR OF IT 8'-0' 3.0' a' 1432 DIRECTOR OF IT T-10' 6-2" P 145J I NNOVATION DI RECTOR 8'-0' 3-0' P 145.2 I NNOVATION DI RECTOR 7.19, 7.19, P 147.1 COURIER AND SUPPLY T -O' 6-4' on ENTRY 147.2 COURIER AND SUPPLY 7.0' 5.4' P ENTRY 147.3 COURIER AND SUPPLY T -O' 6'-0' P ENTRY 147A CYLINDER CLOSET 8'-O' 3-0' O' 148 ME D. SUPPLY STORAGE 8'-0' 3'-0' a' RELOCATED DOOR REPLACE DOOR AND FRAME TO HAVE REVERSED SWING. _ 749.7- PROCESSING T-0' 3'-6' ON 149.2 PROCESSING 7-0' 3'-6- an 149.4 PROCESSING 3'-4' 2'-6' D' 149.5 PROCESSING 3'-4' 2'-8- a' 150.2 JANITOR I BIOHAZARD T-0' 3'-6' a' 1W.3 JANITOR I BIOHAZARD 3'-0. 3'-D' P 151.1 CHANGING ROOM/ 8'-0. 3'-0' a' LOCKERS 151.2 CHANGING ROOMI 8'-0' 3'-0' P LOCKERS 152A SURGEON TRAINING T-0' 3'-6' P 152.2 SURGEON TRAINING 8'-0' 3'-0' P 18V SURGEON TRAINING S -e' 5'-8' ON 153 EVALUATION ROOM T -O' 6'-O- an 154 ANTEROOM T-0' 3'-6' P 155A CLEAN ROOM 3'-8' 6-8' P 1W.3 CLEAN ROOM 3'-a' S' - a' P 155.5 CLEAN ROOM 3'-8' 6-8' a' 158.1 STAFF CONFERENCE T-to, 3'-0' 1W.2 STAFF CONFERENCE T-10' 3'-0' 1583 STAFF CONFERENCE T-10' 3'-O- RELOCATED DOOR RELOCATED DOOR RELOCATED DOOR RELOCATED DOOR RELOCATED DOOR RELOCATED DOOR RELOCATED DOOR _ VARIES SEE SCHEDULE OPEN w y N K 51.1-FRAMED OPENING S- FRAMED OPENINGS VARIES P VARIES VARIES SEE SCHEDULE SEE SCREW LE SEE SCHEDULE () N D 0 W W GLASS GLASS GLASS W W W SINGLE W2.1 -DOUBLE W3.1 -TRIPLE W - INTERIOR WINDOWS OPENING ELEVATION INDICATOR X 1. 1 � ELEVATION MODIFIER ELEVATION MODIFIER ` 1 = FLUSH AMOUNT OF PANELS .2=SLOT GLAZED .3=HALF GLAZED OPENING TYPE .4=FULL GLAZED .5 = MID RAIL GLAZED .6 = LOUVER OPENING SCHEDULE GENERAL NOTES 1. REFER THIS SHEET FOR JAMB AND HEAD DETAIL SETS. 2. REFER TO PROJECT MANUAL FOR DOOR HARDWARE INFORMATION 3. DIMENSIONS DO NOT REFLECT SIZE OF PACKAGED DOORS, REFER TO OPENING ELEVATIONS. 4. SLIDING DOORS ARE SIZED INSIDE TO INSIDE. 5, REFER TO ELECTRICAL WIRING DIAGRAMS OF POWERED OPENINGS FOR ADDITIONAL INFORMATION 6. PROVIDE LEAD THICKNESS OR EQUIVALENCY IN DOORS, FRAMES ANDIOR WINDOWS AS IN ADJACENT PARTITION, MATERIAL ABBREVIATIONS HM HOLLOWMETAL WD SOLID CORE WOOD AL ALUMINUM GL GLASS GLASS TYPES G1 SAFETY GLASS G2 FIRE RATED GLASS G3 DECORATIVE GLASS G4 ONE WAY VISION GLASS G5 LEAD LINED GLASS G6 ELECTRIFIED GLASS BSA BSA LifeStructures 9365 Counselors Row Suite 300 Indianapolis, IN 46240.1478 ph 317.819.7878 fx 317.819.7288 www.bsalifestructures.com VISIONFIRST Indiana Lions Eye Bank OFFICE AND LAB RENOVATION CLIENT PROJECT NO. - 21160001 CONSTRUCTION DOCUMENTS T KEYPLAN IANNORTH MARK DATE DESCRIPTION 1 0114R079 ADDENDUM91 13' No.`° AR10500148 STATE OF OPENING SCHEDULE & DETAILS DATE DEC. 19, 2018 BSALS PROJECT NO. 21160001 A500