HomeMy WebLinkAboutA 600F
6 65 Ai
P5
P5
14
`dl
\
OPEN
34
105.1
o,
�101.1
1
P
1
DOOR AND
WINDOW
FRAMES TO BE DOORANO WINDOW FRAMES TO BI
P5. INSIDE
AND
OUT OF OFFICE P5. INSIDE AND OUT OF OFFICE
n 103 OPEN OFFICE WEST
1/4" - 1'-0"
1
1'.R 4'.m
15
15 1'-IT -{1s 2' IT 2' IT 15 1 0 r(15 .15
P5
P5
14
4
1''
iL OPEN
OPEN
P3
OPEN
PF
P9
34
34
OPEN
P11
0
0 0
o,
i01
01,
01
IDi
1
2
1241
1281
1
2
DOORAND
WINDOW FRAMES TO BE DOORANDWINOOW
FRAMES
TORE
P5. INSIDE
AND
OUT OF OFFICE P5, INSIDEANDOUTOF
OFFICE
n 103 OPEN OFFICE SOUTH
u P5VnIIJ I IIIIJV II In""' IV IL
`VVIInu IIIIIUV II In"", IV O VINS ICE AND OUT OF OF FI CEP5,`O VINS ICE AND OUT OF OF FI CEP5,`INS ICE AND OUT OF OF FI CE
n 103 OPEN OFFICE NORTH
%l
r.l \ (:rl
n
T-9' 1'-0' a \ 4'_0' 1P_0. T 0" 2P_0' v v 6. 2'-V v
P5
P5
P5
14
14
,Tj
Y)
14
1`
OPEN
34
34
34
` OPEN
P10
OP3
PO
P6
P9
P„
1391 ��
1383
1371 ��
13L2
1351
DOOR AND WINDOW FRAMES TO BE DOOR AND WINDOW FRAMES TO BE DOOR AND WINDOW FRAMES TO BE
P5, INSIDE AND OUT OF OFFICE P5, INSIDE AND OUT OF OFFICE P5, INSIDE AND OUT OF OFFICE ;�
:O " NORTH / z
= 1to" A630
1
01 u 14u
4 u
75
P5
74
PS
14
1
14�
74
7
\\
OPEN
P9
34
PB
4
10 P11
PF.
P3
P5
OPEN
P9
01
01
1451 '
1452
y
I
1451
1
2
DOOR AND WINDOW FRAMES TO BE DOOR AND WINDOW FRAMES TO BE
n 146 CORRIDOR SOUTH 2
U 1 /4" = 1'-0" 2 BIm
P5, INSIDE AND OUT OF OFFICE
i'.i V4' T.11114'
T.i V4' V.11114'
P5, INSIDE AND OUT OF OFFICE
T.11114' l'.1V4'
I
I
I I
I I
'a
7.n^ r.m
1(1, a' n' rlIi, V -R. 4'.In,
OF
n 111 OPEN OFFICE CORRIDOR NORTH
1/4" = 1'-0"
ELEVATION
SYMBOL LEGEND
XX NEW COLUMN LINE
SIM
SECTION INDICATOR
107
AREA DETAIL INDICATOR
OF
DETAIL DETAILNUMBER
SIM SIMILAR
101 SHEET NUMBER
402 2 ELEVATION TAG
3
00 ELEVATION NOTE DESIGNATION
GENERAL ELEVATION NOTES
A.
REFER FLOOR PLANS& THE EQUIPMENT SCHEDULE FOR EQUIPMENT
TYPES. REFER TO MIEIP DRAWINGS TO COORDINATE CONNECTIONS.
B.
REFER TO PLUMBING PLANS FOR SINK TYPES.
C
ALL DIMENSIONS ARE TAKEN TO THE FACE OF FINISHED MATERIAL.
D.
INSTALL BLOCKING TO STUDS TO SUPPORT ALL WALL MOUNTED
CABINETRY AND EQUIPMENT AS REQUIRED.
E
CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS PRIOR TO
CONSTRUCTING CABINETRY,
F.
COORDINATE BULKHEAD HEIGHTS INDICATED HERE WITH THAT
SHOWN ON THE REFLECTED CEILING PLAN. CONFIRM ANY
DISCREPANCIES WITH THE ARCHITECT PRIOR TO CONSTRUCTION.
G.
COORDINATE ALL WALL OUTLETS TO AVOID CONFLICT WITH
CASEWORK& COUNTERTOPS.
H.
COORDINATE SUPPORT BRACKET LOCATIONS WITH INDICATED
UNDER COUNTER EQUIPMENT.
ALL PATTERNED LAMINATES SHALL RUN VERTICAL. (UNO)
J.
ALL NON LAB BASE CABINETS SHALL BE 2' 0" DEEP UNLESS NOTED
OTHERWISE.
K.
ALL NON LAB CASEWORK SHALL BE FINISHED IN PLASTIC LAMINATE
UNLESS NOTED OTHERWISE. REFER TO LAB SHEETS FOR LAB
CASEWORK.
L.
PROVIDE FILLER PANELS AT ALL LOCATIONS WHERE CABINETRY
ABUTS A WALL,
M.
PROVIDE A 4" HIGH INTEGRAL BACK SPLASH ON ALL COUNTERS WITH
RECESSED SINKS. INSTALL SIDE SPLASHES WHERE THESE
COUNTERS ABUT A WALL.
N.
PROVIDE ADJUSTABLE SHELVING WITHIN ALL WALL AND BASE
CABINETRY AS SHOWN BY DASHED LINE.
0.
BOTTOM OF UPPER CABINETS TO BE FINISHED TO MATCH VERTICAL
FACER.
NOTES- INTERIOR ELEVATION
REFER TO SHEET X}yy FOR GENERAL NOTES AND LEGENDS
NOT ALL NOTES APPEAR ON EACH SHEET
01 FINISHED BASE, REFER TO FINISH PLAN
02 25'DEEP (UNO) PLASTIC LAMINATE COUNTERTOP WITH SIDE AND BACK
SPLASHES, AS INDICATED.
O3 25'DEEP (UNo) SOLID SURFACE COUNTERTOP WITH SIDE ANDBACK
SPLASHES, AS INDICATED.
04 24' DEEP (UNO) BASE CABINET, CONFIGURE DOOR(S), DRAWER(S), AND
_ SHELVE(S) AS INDICATED.
05 15' DEEP (UNO) WALL CABINET, CONFIGURE DOORS) AND SHELVE(S) AS
INDICATED.
OR
ACESSIBLE(BARRIER FREE) SINK SKIRT ASSEMBLY.
FINISHED END PANEL
COUNTER SUPPORTBRACI0=TQ40'O.C. MAXIMUM.
07
66
09
GYPSUM BULKHEAD CONSTRUCTION, REFER TO REFLECTED CEILING
RAN.
11
CASEWORK LOCK, AS INDICATED.
7 DEEP LIGHT SKIRT, A$ INDICATED.
12
13
FILLER PANEL FP). WHEN CASEWORK IS ADJACENT TO WALL FILLER
PANEL IS REQUIRED. RETURN FINISHED FILLER ACROSS BOTTOM OF
CASEWORK TO BACK WALL.
14
ALIGN.
15
_
STRIKEPAINTTRANSRION LINE.
i6 TIMELINE HISTORY WALL GLASS PANELS. GRAPHICS TO BE
COORDINATED WITH DESIGNER AND OWNER.
17 DECORATIVE FINISH (MATERIAL VARIES), REFERTO INTERIOR FINISH
PLANS.
19 CUSTOM SOLIDSURFACERECEPTION DESK SHELL(SS1).
26 PLASTIC LAMINATE RECEPTION DESK(PL4.
21 314" PLASTIC LA,IIANTE ON ALL EXPOSED SURFACES.
24 PLUMBING FIXTURE.
25 NEWTOILET PARTITION.
27 SOLID SURFACE FLUSH MOUNT BASEWITH FRY REGLET REVEAL. REFER
TO 111IFOOl FOR DETAIL.
29 DECORATIVE PANEL (DPI). REFERTOSECTONS AND DETAILS, AND
COORDINATE WITH PANELMANUFACTURER.
31
S'PLASTIC LAMIANTE SINK APRON(R.1).
WRAP AND CONCEAL PIPES.
RILL OUT TRASH CABI NET.
32
33
34
IVCI REFER TO INTERIOR FINISH SCHDULE AND PROJECT MANUAL.
INSTALL ON INTERIOR SIDE OF ROOM. FINAL INSTALLATION HEIGHT TO
BE CONFIRMED DURING MOCKUP.
_
50
FROM DE METAL EDGE TRI M FOR WALL TI LE. REFER TO IF001 FOR TRIM
DETAIL.
51
ACCENT PAI NT, REFER TO FINISH PLAN,
52
NEW URI NAL SCREEN.
53
TACK PANEL, REFER TO SECTION DETAILS.
54
STAINLEBS STEEL BASE,
56
PROVIDE BLOCKING I N WALL FOR MAL SORTERBV FURNITURE VENDOR.
A630 15 15
16 r �15j A
15 15 i, )
P5
'1-
14
14
14
OPEN
'28i
OPEN
P5
—
P3
70
`�4
T
P5
P6
P9
�
C
01 i
®
m
rt o1
a
1221
2
DOOR AND WINDOW FRAMES TO BE
r1 111 OPEN OFFICE CORRIDOR SOUTH Ps, INSIDE AND our of OFFICE
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and meal Codes
City
off Carmel
�VI(4W \D.3C�IDAS�
DATE: 02/20/19
PAINT UNDERSIDE
OF BULKHEAD (P10)
PAINTUNDERSIOE
OF BULKHEAD (PTO)
I51
51
VII
OPEN
OPEN
Los
BSA
BSA LifeStructures
9365 Counselors Row Suite 300
Indianapolis, IN 46240.1478
ph 317.819.7878 fx 317.819.7288
www.bsalifestructures.com
VISIONFIRST
Indiana Lions Eye Bank
OFFICE AND
LAB
RENOVATION
CLIENT PROJECT NO. - 21160001
CONSTRUCTION
DOCUMENTS
m KEYPLAN
MARK DATE DESCRIPTION
13 No.`°
AR10500148
STATE OF
INTERIOR ELEVATIONS
DATE DEC.19,2019
BSALS PROJECT NO. 21160001
A600
2 109 LOBBY WEST
114"
109 LOBBY EAST - HISTORY WALL AND
RECEPTION
1/4" = 1'-0"