Loading...
HomeMy WebLinkAboutA 600F 6 65 Ai P5 P5 14 `dl \ OPEN 34 105.1 o, �101.1 1 P 1 DOOR AND WINDOW FRAMES TO BE DOORANO WINDOW FRAMES TO BI P5. INSIDE AND OUT OF OFFICE P5. INSIDE AND OUT OF OFFICE n 103 OPEN OFFICE WEST 1/4" - 1'-0" 1 1'.R 4'.m 15 15 1'-IT -{1s 2' IT 2' IT 15 1 0 r(15 .15 P5 P5 14 4 1'' iL OPEN OPEN P3 OPEN PF P9 34 34 OPEN P11 0 0 0 o, i01 01, 01 IDi 1 2 1241 1281 1 2 DOORAND WINDOW FRAMES TO BE DOORANDWINOOW FRAMES TORE P5. INSIDE AND OUT OF OFFICE P5, INSIDEANDOUTOF OFFICE n 103 OPEN OFFICE SOUTH u P5VnIIJ I IIIIJV II In""' IV IL `VVIInu IIIIIUV II In"", IV O VINS ICE AND OUT OF OF FI CEP5,`O VINS ICE AND OUT OF OF FI CEP5,`INS ICE AND OUT OF OF FI CE n 103 OPEN OFFICE NORTH %l r.l \ (:rl n T-9' 1'-0' a \ 4'_0' 1P_0. T 0" 2P_0' v v 6. 2'-V v P5 P5 P5 14 14 ,Tj Y) 14 1` OPEN 34 34 34 ` OPEN P10 OP3 PO P6 P9 P„ 1391 �� 1383 1371 �� 13L2 1351 DOOR AND WINDOW FRAMES TO BE DOOR AND WINDOW FRAMES TO BE DOOR AND WINDOW FRAMES TO BE P5, INSIDE AND OUT OF OFFICE P5, INSIDE AND OUT OF OFFICE P5, INSIDE AND OUT OF OFFICE ;� :O " NORTH / z = 1to" A630 1 01 u 14u 4 u 75 P5 74 PS 14 1 14� 74 7 \\ OPEN P9 34 PB 4 10 P11 PF. P3 P5 OPEN P9 01 01 1451 ' 1452 y I 1451 1 2 DOOR AND WINDOW FRAMES TO BE DOOR AND WINDOW FRAMES TO BE n 146 CORRIDOR SOUTH 2 U 1 /4" = 1'-0" 2 BIm P5, INSIDE AND OUT OF OFFICE i'.i V4' T.11114' T.i V4' V.11114' P5, INSIDE AND OUT OF OFFICE T.11114' l'.1V4' I I I I I I 'a 7.n^ r.m 1(1, a' n' rlIi, V -R. 4'.In, OF n 111 OPEN OFFICE CORRIDOR NORTH 1/4" = 1'-0" ELEVATION SYMBOL LEGEND XX NEW COLUMN LINE SIM SECTION INDICATOR 107 AREA DETAIL INDICATOR OF DETAIL DETAILNUMBER SIM SIMILAR 101 SHEET NUMBER 402 2 ELEVATION TAG 3 00 ELEVATION NOTE DESIGNATION GENERAL ELEVATION NOTES A. REFER FLOOR PLANS& THE EQUIPMENT SCHEDULE FOR EQUIPMENT TYPES. REFER TO MIEIP DRAWINGS TO COORDINATE CONNECTIONS. B. REFER TO PLUMBING PLANS FOR SINK TYPES. C ALL DIMENSIONS ARE TAKEN TO THE FACE OF FINISHED MATERIAL. D. INSTALL BLOCKING TO STUDS TO SUPPORT ALL WALL MOUNTED CABINETRY AND EQUIPMENT AS REQUIRED. E CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTING CABINETRY, F. COORDINATE BULKHEAD HEIGHTS INDICATED HERE WITH THAT SHOWN ON THE REFLECTED CEILING PLAN. CONFIRM ANY DISCREPANCIES WITH THE ARCHITECT PRIOR TO CONSTRUCTION. G. COORDINATE ALL WALL OUTLETS TO AVOID CONFLICT WITH CASEWORK& COUNTERTOPS. H. COORDINATE SUPPORT BRACKET LOCATIONS WITH INDICATED UNDER COUNTER EQUIPMENT. ALL PATTERNED LAMINATES SHALL RUN VERTICAL. (UNO) J. ALL NON LAB BASE CABINETS SHALL BE 2' 0" DEEP UNLESS NOTED OTHERWISE. K. ALL NON LAB CASEWORK SHALL BE FINISHED IN PLASTIC LAMINATE UNLESS NOTED OTHERWISE. REFER TO LAB SHEETS FOR LAB CASEWORK. L. PROVIDE FILLER PANELS AT ALL LOCATIONS WHERE CABINETRY ABUTS A WALL, M. PROVIDE A 4" HIGH INTEGRAL BACK SPLASH ON ALL COUNTERS WITH RECESSED SINKS. INSTALL SIDE SPLASHES WHERE THESE COUNTERS ABUT A WALL. N. PROVIDE ADJUSTABLE SHELVING WITHIN ALL WALL AND BASE CABINETRY AS SHOWN BY DASHED LINE. 0. BOTTOM OF UPPER CABINETS TO BE FINISHED TO MATCH VERTICAL FACER. NOTES- INTERIOR ELEVATION REFER TO SHEET X}yy FOR GENERAL NOTES AND LEGENDS NOT ALL NOTES APPEAR ON EACH SHEET 01 FINISHED BASE, REFER TO FINISH PLAN 02 25'DEEP (UNO) PLASTIC LAMINATE COUNTERTOP WITH SIDE AND BACK SPLASHES, AS INDICATED. O3 25'DEEP (UNo) SOLID SURFACE COUNTERTOP WITH SIDE ANDBACK SPLASHES, AS INDICATED. 04 24' DEEP (UNO) BASE CABINET, CONFIGURE DOOR(S), DRAWER(S), AND _ SHELVE(S) AS INDICATED. 05 15' DEEP (UNO) WALL CABINET, CONFIGURE DOORS) AND SHELVE(S) AS INDICATED. OR ACESSIBLE(BARRIER FREE) SINK SKIRT ASSEMBLY. FINISHED END PANEL COUNTER SUPPORTBRACI0=TQ40'O.C. MAXIMUM. 07 66 09 GYPSUM BULKHEAD CONSTRUCTION, REFER TO REFLECTED CEILING RAN. 11 CASEWORK LOCK, AS INDICATED. 7 DEEP LIGHT SKIRT, A$ INDICATED. 12 13 FILLER PANEL FP). WHEN CASEWORK IS ADJACENT TO WALL FILLER PANEL IS REQUIRED. RETURN FINISHED FILLER ACROSS BOTTOM OF CASEWORK TO BACK WALL. 14 ALIGN. 15 _ STRIKEPAINTTRANSRION LINE. i6 TIMELINE HISTORY WALL GLASS PANELS. GRAPHICS TO BE COORDINATED WITH DESIGNER AND OWNER. 17 DECORATIVE FINISH (MATERIAL VARIES), REFERTO INTERIOR FINISH PLANS. 19 CUSTOM SOLIDSURFACERECEPTION DESK SHELL(SS1). 26 PLASTIC LAMINATE RECEPTION DESK(PL4. 21 314" PLASTIC LA,IIANTE ON ALL EXPOSED SURFACES. 24 PLUMBING FIXTURE. 25 NEWTOILET PARTITION. 27 SOLID SURFACE FLUSH MOUNT BASEWITH FRY REGLET REVEAL. REFER TO 111IFOOl FOR DETAIL. 29 DECORATIVE PANEL (DPI). REFERTOSECTONS AND DETAILS, AND COORDINATE WITH PANELMANUFACTURER. 31 S'PLASTIC LAMIANTE SINK APRON(R.1). WRAP AND CONCEAL PIPES. RILL OUT TRASH CABI NET. 32 33 34 IVCI REFER TO INTERIOR FINISH SCHDULE AND PROJECT MANUAL. INSTALL ON INTERIOR SIDE OF ROOM. FINAL INSTALLATION HEIGHT TO BE CONFIRMED DURING MOCKUP. _ 50 FROM DE METAL EDGE TRI M FOR WALL TI LE. REFER TO IF001 FOR TRIM DETAIL. 51 ACCENT PAI NT, REFER TO FINISH PLAN, 52 NEW URI NAL SCREEN. 53 TACK PANEL, REFER TO SECTION DETAILS. 54 STAINLEBS STEEL BASE, 56 PROVIDE BLOCKING I N WALL FOR MAL SORTERBV FURNITURE VENDOR. A630 15 15 16 r �15j A 15 15 i, ) P5 '1- 14 14 14 OPEN '28i OPEN P5 — P3 70 `�4 T P5 P6 P9 � C 01 i ® m rt o1 a 1221 2 DOOR AND WINDOW FRAMES TO BE r1 111 OPEN OFFICE CORRIDOR SOUTH Ps, INSIDE AND our of OFFICE RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and meal Codes City off Carmel �VI(4W \D.3C�IDAS� DATE: 02/20/19 PAINT UNDERSIDE OF BULKHEAD (P10) PAINTUNDERSIOE OF BULKHEAD (PTO) I51 51 VII OPEN OPEN Los BSA BSA LifeStructures 9365 Counselors Row Suite 300 Indianapolis, IN 46240.1478 ph 317.819.7878 fx 317.819.7288 www.bsalifestructures.com VISIONFIRST Indiana Lions Eye Bank OFFICE AND LAB RENOVATION CLIENT PROJECT NO. - 21160001 CONSTRUCTION DOCUMENTS m KEYPLAN MARK DATE DESCRIPTION 13 No.`° AR10500148 STATE OF INTERIOR ELEVATIONS DATE DEC.19,2019 BSALS PROJECT NO. 21160001 A600 2 109 LOBBY WEST 114" 109 LOBBY EAST - HISTORY WALL AND RECEPTION 1/4" = 1'-0"