HomeMy WebLinkAboutE 310rAH- t i1 FIRST FLOOR POWER PLAN Ire'=r-o' 73 i i Ems® ®I TSi DD 3T ATS-2J EDP _ B 1311E I iL MDP iT 07 2L P 3P �T 2P 4P 5P 1@7 Y i1 ENLARGED FIRST FLOOR ELECTRICAL ROOM GENERAL NOTES A. REFER TO SHEET E001 FOR ELECTRICAL SYMBOLS AND ADDITIONAL GENERAL NOTES. PLAN NOTES 300 MOUNT NEW BOOSTING TRANSFORMER FROM STRUCTURE ABOVE. 301 INSTALL NEW IDEA BREAKER IN AVAILABLE SLOT IN EXISTING DISTRIBUTION PANEL. MATCH EXISTING MANUFACTURE AND MID RATING FOR NEW BREAKER. 302 INSTALL NEW 30P 48WAC BRANCH PANEL IN LOCATION SHOWN. REFER TO RISER DIAGRAM ON SHEET E700 FOR ADDITIONAL INFORMATION. 303 INSTALL NEW FLOOR BOX AT SAME LOCATION AS FLOOR BOX REMOVED DURING DEMOLITION. CONNECT COMPLETE TO EXISTING CIRCUIT MADE AVAILABLE DURING DEMOLITION. 304 CONNECT EXISTING FURNITURE WHIP TO NEW SYSTEMS FURNITURE BEING INSTALLED. COORDINATE TERMINATION AT FURNITURE WITH MANUFACTURER. HOME -RUN AND CIRCUITING INFORMATION IS EXISTING AND SHOWN FOR REFERENCE. 305 CONNECT (2) OUT OF THE EXISTING (3) EXISTING FURNITURE CIRCUITS TO NEW SYSTEMS FURNITURE BEING INSTALLED. COORDINATE TERMINATION AT FURNITURE WITH MANUFACTURER. REMOVE WIRING FOR THIRD CIRCUIT LOCATED AT THIS FURNITURE FEED AND MAINTAIN IN AREA FOR REUSE IN THIS AREA. 306 INSTALL NEW FURNITURE CONNECTION BACK BOX AND WHIP AT LOCATION SHOWN TO CIRCUITS INDICATED FOR NEW SYSTEMS FURNITURE BEING INSTALLED. COORDINATE TERMINATION AT FURNITURE WTH MANUFACTURER. 307 CONNECT EXISTING DUPLEX RECEPTACLE TO NEW CIRCUIT SHOWN. 308 RECONNECT EXISTING DUPLEX RECEPTACLE CIRCUIT TO NEW PANEL AS SHOWN. 309 GARBAGE DISPLCSAL. COORDINATE MOUNTING OF CONTROL SWITCH WITH ARCHITECTURAL ELEVATIONS PRIOR TO ROUGH -IN. 310 NEW POINT OF USE WATER HEATER. MOUNT DISCONNECT SWITCH NEAR UNIT 311 INSTALL (4)4'C+(1)4'C SPARE+ (1) 1'D FOR CONTROL WIRING. CONDUIT TO BE DIRECT BURY TYPE AND STUB UP UNDER GENERATOR AND NEAR EXTERIOR WALL OF BUILDING. CONDUIT TO TRANSITION INTO THE BUILDING NEAR BASE OF WALL. INSTALLED. 313 GENERATOR ANNUNCIATOR PANEL. 314 PROVIDE ELECTICPL CONNECTION TO ELECTRIC DUCT COIL BEING INSTALLED NEAR THIS LOCATION. COORDINATE WITH MECHANICAL CONTRACTOR PRIOR TO ROUGH -IN. 315 PROVIDE SWITCH FOR EXHAUST FAN. CONNECT COMPLETE TO RECEPTACLE CIRCUIT SHOWN. 316 PROVIDE POWER CONNECTION TO SPLIT -UN IT COOILING SYSTEM BEING INSTALLED NEAR THIS LOCATION. COORDINATE EXACT PLACEMENT WITH MECHANICAL TRADE PRIOR TO ROUGH -IN. 317 INSTALL NEW 42P 208VAC BRANCH PANEL IN LOCATION SHOWN. REFER TO RISER DIAGRAM ON SHEET E700 FOR ADDITIONAL INFORMATION. 318 EXISTING 100A DISCONNECT SWITCH FOR RACK MOUNT UPS. 319 NEW LOCATION OF EXISTING UNIT HEATER. RECONNECT TO EXISTING CIRCUIT 3 F POWERCONNECTIONFORDOORA CES EO IP ENT. C RDI AT WITH DR ACCESS VENDOR PRIOR TO ROUGH -IN. BSA BSA LifeStructures 9365 Counselors Row Suite 300 Indianapolis, IN 46240-1478 ph 317.819.7878 fx 317.819.7288 www. bsal'rfestructures.00m VISIONFIRST Indiana Lions Eye Bank OFFICE AND LAB RENOVATION CLIENT PROJECT NO. - 21160001 CONSTRUCTION DOCUMENTS T KEYPLAN nIAN NORM MARK DATE 1 DESCRIPTION 1 011142019 ADDENDUM 1 2 1 011222019 JADDENDUM2 FIRST FLOOR POWER PLAN RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Carmel DATE: 02/20/19 DATE DEC. 19, 2D18 BSALS PROJECT NO. 21160001 E310