Loading...
HomeMy WebLinkAboutH 701F. RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Cannel �VTI�\Dw�1DML TRANSITION AIR HANDLING UNIT BRICK WALL WITH STORE FRONT REMOVE EXISTING SPANDREL GLASS AND C MUILLION PIECE. EXISTING MUILLION PIECES TO REMAIN AS INDIC4 ABUTT DUCTTOONE SIDE IN VOID — SPACE. INFILL THE VOID SPACE WITH INSULATED PANEL MATCHING MULLION. SEAL ALL AROUND. BRICK WALL WITH STORE FRONT AND UPPER GLASS AND MUILLION PIECE REMOVED — DUCT INTO BUILDING il4' =1'-0' DECK m INSULATED DUCT PANELS SEAL THE GAP BETWEEN THE DUCT AND THE WALL WATERTIGHT ALL AROUND THE PERIMENTER OF THE DUCTWORK AND PENTRATION. DUCT SHALL BE EXTERNALLY INSULATED AS IT PASSES THROUGH THE WALL. PROVIDE STAINLESS FLASHING AND COUNTERFLASHING MATERIALS AND SEALANT TO PROVIDE A WATERTIGHT WALL PENETRATION. SLOPE THE TOP OF THE DUCT SLIGHTLY DOWN AND AWAY FROM THE BUILDING ON THE EXTERIOR SO THAT WATER ON TOP OF THE DUCT INSUATION SHEDS AWAY FROM THE BUILDING. WORK WITH WEATHER 'PORTSISUPPORT ROUND BRANCH DUCT TO TERMINAL BOX DISCHARGE DUCT SIZE PER SCHEDULE OR PLANS. DUCT RADIUS TO DIFFUSER — MIN.2 DUCT DIAMETERS PAINT INSIDE OF PLENUM FLAT BLACK PLENUM BOX / HEIGHT BOX PLENUM BOX DEPTH = IT MIN. DUCTWORKIOIFFUSER SHALL BE SUPPORTED INDEPENDENTLY FROM STRUCTURE (NOT SUPPORTED BY CEILING) � i-1I2' EXTERIOR INSULATION GRILLE HEIGHT AS /I- SHOWN ON THE DIFFUSER SCHEDULE SEE ARCHITECTURAL DRAWINGSFOR MOUNTING HEIGHT MOUNTING AND LOCATIONS. CONSTRUCTAN INDIVIDUAL PLENUM BOX FOR EACH LINEAR DIFFUSER. 6' J PLAN NOTES 1. AMINIMUM OF FIVE(5) FEET LENGTH OF FLEXIBLE DUCT SHALL BE PROVIDED TO EACH DIFFUSER. DUCTWORK SHALL CONTAIN 1800 OF BENDING. FLEXIBLE DUCTWORK LENGTH SHALL NOT EXCEED TEN (10) FEET EXCEPT WHERE SPECIFICALLY NOTED. FLEX DUCT SHALL NOT CONTACT CEILING AND SHALL BE PROPERLY SUPPORTED BOAS TO HAVE NO KINKS. 2, TIE -WRAP CONNECT FLEX DUCT HELICAL COIL TO ROUND METAL DIFFUSER NECK AND TO ROUND METAL DUCTWORK AT OTHER END OF FLEX DUCT. PULL FLEX DUCT VAPOR BARRIER OVER LOWER TIE -WRAP AND INSTALL SECOND TIE -WRAP OVER THE VAPOR BARRIER. INSULATE METAL DUCT OR DIFFUSER OVERTOP OF SECOND TIE -WRAP AND INSTALL INSULATORS TAPE ON EDGES. i1 LINEAR DIFFUSER DETAIL NO SCALE 2i PLAN NOTES 1. COORDINATE CLOSELY WITH ARCHITECTURAL DRAWINGS. 2, SPACE EQUIDISTANT ON BRAKE METAL. SEE PLANS FOR LOCATIONS. 3. BUILD PLENUM BOX ACCORDING TO DETAIL 51H701. 4. REFERENCE ECG4 GRILLES ON H500 SCHEDULE. GALVANIZED DUCTWORK AIRFLOW y� DIRECTION FLANGED CONNECTION �1 METAL SHIELD GRILLE DETAIL NO SCALE �7 ARMSTRONG CEILING SYSTEM FULLY WELDED STAINLESS DUCTWORK HUMIDIFIER LOCATED SIZE AS NOTED ON PLANS WITHIN DUCTWORK F r WELDEDCONNECTION FLANGED CONNECTION GALVANIZED DUCTWORK FLANGED CONNECTION 2" CD PLAN NOTES: 1. VK'MINIMUM LENGTH OF FULLY WELDED STAINLESS DUCTWORK UPSTREAM OF HUMIDIFIER. 2. 5'-0" MINIMUM LENGTH OF LEVEL, STRAIGHT, FULLY WELDED STAINLESS DUCTWORK DOWNSTREAM OF HUMIDIFIER WITH NO TAKEOFFS, TRANSITIONS, OR DUCT PENETRATION$ WITHIN THIS REGION. 3. GALVANIZED STEEL, INSULATED DOUBLE WALL ACCESS DOORS ON ACCESSIBLE SIDE OF DUCT. HEIGHTOFACCESS DOOR TO BE 2' LESS THAN HEIGHT OF DUCT. INCLUDE VIEWING LENS IN ACCESS DOOR. 4. INSTALL HUMIDIFIER CONTROL DEVICES IN GALVANIZED SECTION PRIOR TO FIRST DUCT TAKEOFF, WITHIN 12- OF END OF STAINLESS DUCT, BETWEEN STAINLESS SECTION AND ACCESS DOOR. 5. GALVANIZED, INSULATED DOUBLE WALL ACCESS DOOR ON ACCESSIBLE SIDE OF DUCT. HEIGHT OF ACCESS DOOR TO BET LESS THAN HEIGHT OF DUCT. 6. 6" LONG SECTION OF WELDED STAINLESS DUCT WHICH IS 3" TALLER THAN THE UPSTREAM SECTION. 3" DEEP POCKET FUNCTIONS AS GRAIN PAN TO COLLECT WATER DURING POTENTIAL HUMIDIFIER MALFUNCTION. T INSTALL A 3"DEEP P-TRAP. ROUTE THE DRAIN IN i ll"COPPER CD TO THE MAIN CONDENSATE LINE. TURN PIPE DOWN WALL AND TERMINATE 12' ABOVE RIM LEVEL OF SINK. SEE PLANS FOR LOCATION. LABEL PIPE'HUMIDIFIER MALFUNCTION IF FLOWING". BSA BSA LifeStructures 9365 Counselors Row Suite 300 Indianapolis, IN 46240-1478 ph 317.819.7878 fx 317.819.7288 www. bsal'Ifestructures.00m VISIONFIRST Indiana Lions Eye Bank OFFICE AND LAB RENOVATION CLIENT PROJECT NO. - 21160001 CONSTRUCTION DOCUMENTS MARK I DATE I DESCRIPTION HVAC DETAILS DATE DEC. 19, 2018 BSALS PROJECT NO. 21160001 DATE: 02/20/19 HUMIDIFIER DUCT INSTALLATION WITH DRAIN DETAIL NO SCALE H701