Loading...
HomeMy WebLinkAboutH PE1R F SEE PLANS FOR LOCATION BY EC SEE PLANS it FOR 14 I 10 19 TO F.A. ANNUNCIATOR LAB EXHAUST FAN LOCATION P 1 17 B BOD EF-I 1 TO SUPPLY FAN T I H E.C. SD STARTERS LAB DISCHARGE TO EXHAUSTAIR 13 ATMOSPHERE LAB RETURN AIR DC-4 ECM DPS (LL) C FIELD AHU DUCTWORK EMERGENCY POWER BY EC TO SUPPLY O 12011 FANS DC -3 SUPPLY FAN (SF-2) MANUAL BALANCE DAMPER VFC� 74� AHU FIELD so DUCTWORK BV EC DC-2 14 © 14 14 14 74 14 17 TO F.A. ANNUNCIATOR ELECTRIC COIL UPS DPS 1 SEE PLANS FOR LOCATIONS H T I BY E.C. SD TO SUPPLY FAN AFS� TO HUMIDIFIER T CAD T T T SUPPLY FAN SF-1) HUMIDIFIER a z o OUTSIDE AIR G O3 0 LL g o u U F a V X AFMS 16 20 1 11 17 77 I DPS AL 1 HTE SEE PLANS 7 1 VFC 14 17 FOR 1 17 CONTROL CONDENSING I LOCATION 18 AHU DO EL (INSTALLED AS PARTOFUNIT) PANEL UNIT O SUPPLY TOLLIFANS HUMIUIFIER BUILDING 15 NE WORK EMERGENCY 1HII6W1 BY EC POWEROWER BY E.C. EMERGENCY POWER scni iFNCF nF nPFPATInN 1. ALL SETPOINTS TO BE ADJUSTABLE. SETPOINTS TO BE EXPOSED ON GRAPHIC DISPLAY OR HIDDEN BASED ON OWNER REQUEST. 2. ENABLE: AIR HANDLER IS STARTED FROM DDC PANEL OR FROM COMMAND OF FACILITY MANAGEMENT SYSTEM, AIR HANDLER TO RUN CONTINUOUSLY, OCCUPIED MODE' 1. STARTUP: ON UNIT STARTUP, SUPPLY FANS START. SUPPLY FAN SPEED CONTROL AND SUPPLY AIR TEMPERATURE CONTROL LOOPS ARE ACTIVE. OUTDOOR AIR DAMPER FULLY CLOSED FOR 5 MIN. (AN). AFTER 5 MIN (AWL, AHU CDC PANEL TO SEND SIGNAL TO START EXHAUST FAN (EF-1) 2. NORMAL OPERATION: AFTER STARTUP, OUTDOOR AIR DAMPER TO OPEN FULLY (ADJ). AHU INTERLOCKED WITH EF-1.. 3. SUPPLY AIR TEMPERATURE: THE SUPPLY AIR CONTROL LOOP SHALL MAINTAIN DISCHARGE TEMPERATURE FROM UNIT TO BE 65 DEG (ADJ). DURING DEHUMIDIFICATION, AIR LEAVING DX COOLING COIL TO BE MAINTAINED AT 46 DEG (ADJ) HOTGAS REHEAT TO TAKE TEMPERATURE BACKUP TO III (ADJ). 5. SUPPLY FAN SPEED: STATIC PRESSURE SENSOR LOCATED 90% OF DISTANCE THROUGH SUPPLY DUCT AND FAN DISCHARGE STATIC PRESSURE SENSOR LOCATED IN AHU DISCHARGE TO FUNCTION WITH SUPPLY FAN VFC CONTROL LOOP TO MODULATE SUPPLY FAN SPEED TO ACHIEVE DUCT STATIC PRESSURE (90% SENSOR) SET AT 2.25" W.G. (ADJ), NOT TO EXCEED DISCHARGE PRESSURE OF 3" W.G. (ADJ). FINAL SETPOINT DETERMINED BY TAB CONTRACTOR AND APPROVED BY ENGINEER. 4, DEHUMIDIFICATION: UNIT TO MAINTAIN DISCHARGE RELATIVE HUMIDITY TO BE UNDER 55%(ADJ) BY USE OF DX COOLING COIL AND HOTGAS REHEAT COIL, SEE SUPPLY AIR TEMPERATURE LOOP FOR FURTHER DETAIL. 5. REDUNDANCY: IN THE EVENT OF A LOSS OF A FAN, REMAINING WORKING FAN TO RAMP UP TO MEET REQUIRED STATIC PRESSURE AT A REDUCED AIRFLOW. BINARY ALARM TO BUILDING NETWORK TO ALARM OWNER. 6. HUMIDIFICATION: AFTER AIRFLOW PROVING SWITCH IS TRIGGERED, HUMIDITY SENSOR LOCATED IN RETURN DUCT CYCLES HUMIDIFIER OFF AND ONTO MAINTAIN RELATIVE HUMIDITY ABOVE45%(ADJ). HIGH LIMIT HUMIDITY ALARM SHUTS OFF HUMIDIFIER AT RELATIVE HUMIDITY OF 80%(AN). 7. ZONE HEATING: THERMOSTATS IN INDIVIDUAL ZONES CONTROL ASSOCIATED ELECTRICAL DUCT HEATING COILS TO MAINTAIN SPACE TEMPERATURE ABOVE 69 DEG(ADJ). 8. SHUTDOWN: ON AHU SHUTDOWN, OUTDOOR DAMPER CLOSES, AND REFRIGERATION IS LOCKED OUT. LOSS OF A SINGLE FAN SHALL NOT SHUTDOWN THE UNIT. 9. SAFETIES: FURNISH SAFETIES AS FOLLOWS TO PROVIDE ALARM AND SHUT DOWN UNIT. A, SUPPLY HIGH LIMIT STATIC PRESSURE SWITCH SET TO 3,25" W.G. (ADJL B. RETURN DUCT LOW LIMIT STATIC SENSOR SWITCH SET TO 1.) 2.0" W.G. (ADJ). C. IN THE EVENT OF SMOKE, AHU DUCT DETECTORS TO SEND SIGNAL TO UNIT TO SHUTOFF AND SEND SIGNAL TO F.A. ANNUNCIATOR. D, IN LOSS OF UTILITY POWER, AHU-1 OPERATES ON EMERGENCY POWER, E. SUPPLY HIGH LIMIT HUMIDITY SWITCH SET TO 758A (ADJ). EXHAUST FAN: NORMAL OPERATION MODE: A. EXHAUST FAN INTERLOCKED WITH AHU. AFTER AHU STARTUP SEQUENCE, AHU DOC PANEL SENDS SIGNAL TO EF-1 EXHAUST FAN TO RUN. EXHAHUST FAN TO NORMALLY RUN CONTINUOUSLY. (FINAL SETPOINT BY TAB) ON AHU SHUTOFF, EXHAUST FAN TO SHUTDOWN. OUTSIDEAIF SEQUENCE OF OPERA OPERA( 1. ALL SETPOINTS TO BE ADJUSTABLE. SETPOINTS TO BE EXPOSED ON GRAPHIC DISPLAY OR HIDDEN BASED ON OWNER REQUEST. OCCUPIED MODE: 1. EXISTING UNIT MODULATES INTEGRAL DX COIL TO MAINTAIN DESIRED TEMPERATURE IN SPACE VIA ASSOCIATED THERMOSTAT FOR COOLING, 2, EXISTING UNIT USES NATURAL GAS FOR HEATING TO MAINTAIN DESIRED TEMPERATURE IN SPACE, 3. EXISTING UNIT TO MAINTAIN DUCT TEMPERATURE OF 60 DEG (ADJ.) 4. DUCT COILS TO MAINTAIN INDIVIDUAL SPACE TEMPERATURE AS REQUIRED BY INDIVIDUAL ROOM THERMOSTATS. PLAN NOTES AvI 1. FURNISHED AND INSTALLE YMC. 2. INTERLOCKED WITH AHU-1. 3. DAMPER TO BE INTEGRAL WITH AHU, ACTUATOR BY AHU MANUFACTURER 4. DEC PANEL TO HAVE WI RELESS AND WEBBASED 5, SPRI NG RETURN CLOSED UPON LOSS OF POWER, 6. FURNISHED TER, FIELD INSTALLED AN D WI RED TO UNIT CONTROLL BV MC. 1 7. THERMOSTATS TO BE SENSI WI-FI, COMPATIBLE WITH MULTIPLE THERMOSTAT MANAGER SYSTEM, WIRED TO CONTROL ELECTRICAL COIL FOR HEATING IN ZONE FURNISHED AND INSTALLED BY MC. 8. MAGNAHELIC PRESSURE GAUGE MOUNTED ON SIDE OF UNIT. 1 EF RT PL NS 0 0 TI15. 10. WIRED BACK TO HUMIDIFIER CONTROLLER BY MC. HUMIDITY SONORYOF THE DEMFCT�70UTTEOT 007SSOTY E.EN"OR PR\IBif. REFRIGERANT PIPING BY AHU MANUFACTURER. 12, EMERGENCY POWER, 13. FURNISHED BY MC. 14. FURNISHED AND INSTALLED BY UNIT SUPPLIER AND FACTORY WIRED TO UNIT CONTROLLER. 15. ADD ALTERNATE: PACKAGED AHU POINTS SHOULD BE VISIBLE TO CLIENT NETWORK SYSTEM. AHU TO HAVE WEB BASED MONITORING CAPABILITY. 16. MFG TO PROVIDE INTERNAL CONTROLS TO DAMPER. 17, FURNISHED BVAHU MANUFACTURER, INSTALLED AND WIRED BY MC. 1 18. MANUFACTURER TO GIVE LISTICOORDINATE WHERE MC TORUN BUILDING SENSORS ON DDC, 19. FURNISHED BY HUMIDIFIER MANUFACTURER, INSTALLED AND WIRED BY MC. 20. INTEGRAL TO AHU. PROVIDED BY AHU MANUFACTURER. AHU-1 CONTROL SCHEMATIC 'Nos CONTROL SCHEMATIC Nos LE 1. SENSI WI-FI THERMOSTAT (NOT TOUCH SCREEN) TO BE MOUNTED TO THE INSIDE OF THE SUPPLY DUCTWORK OF RTU-19 AND WIRED BACK TO RTU-19. SEE PLANS FOR LOCATION. INSTALLED AND FURNISHED BY MC. 2. RTU-19 DUCT COILS NOT REQUIRED TO BE ON EMERGENCY POWER. 3. THERMOSTAT TO BE SENSI THERMOSTATS AND WI-FI COMPATIBLE. FURNISHED 1 AND INSTALLED BY MC. ly�V//1 SUPPLYAIRTO O ANTEROOMAND THERMOSTATIN CLEAN ROOM SPACE O ❑ SUPPLY AIR D 7 SURGEON THERMOSTAT IN TRAINING AND SPACE V SUPPLY AIR TO O IT]JANITOWBIOHAZARD THERMOSTAT IN AND CHANGING SPACE LOCKERS V SUPPLY AIR TO MAIN LAB AND O EVALUATION 7 DTl(j)[ ROOM THERMOSTAT IN SPACE oIRECTOR of 3 T❑ CLINICAL THERMOSTAT IN SERVICES SPACE OFFICE POWER BY E.C. 12011 TYPICAL OF 3 COO OFF( CE 3 THERMOSTAT IN SPACE CEO OFFICE O THERMOSTAT IN SPACE EMERGENCY POWER BY E.C. 2DO13 TYPICAL OF 4 BSA BSA LifeStructures 9365 Counselors Row Suite 300 Indianapolis, IN 46240-1478 ph 317.819.7878 fx 317.819.7288 www. bsal'Ifestructures.00m VISIONFIRST Indiana Lions Eye Bank OFFICE AND LAB RENOVATION CLIENT PROJECT NO. - 21160001 CONSTRUCTION DOCUMENTS MARK DATE DESCRIPTION 7 1 07/4121119 ADDENDUM( 7` No. ' PE10302020 STATE OF CONTROLS RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Canned lN"loI DATE: 02/20/19 RTU-19 CONTROL SCHEMATIC-19 CONTROL SCHEMATIC NOSCALE DATE DEC. 19, 2D18 BSALS PROJECT NO. 21160001 HPE1