EXISTING W S INVERT:
739.18
J
PLUMBING NEW GENERAL NOTES
A. REFER TO SHEET P001 FOR PLUMBING GENERAL NOTES.
PLAN NOTES
500
2'SUPTO PD.
501
2' S UP,
502
3'SUP.
503
4'SUP.
504
2'VUP,
505
CONNECT NEW S PIPING TO EXISTING S PIPING BELOW GRADE.
506
VERIFY LOCATION AND CONDITION OF EXISTING BUILDING SANITARY EXIT. PROVIDE
EXTERIOR CLEANOUT IN THE MAIN IN THE EVENT ONE DOES NOT EXIST.
507
FIELD VERIFY EXISTING LOCATION,ROUTING, CONDITION, AND SIZE OF SANITARY
MAIN SERVING THE BUILDING. NOTIFY PROJECT ENGINEER OF FINDINGS.
508
CONNECT I-114' NO PIPING TO EXISTING DOWNSTREAM OF UTI LITY PROVIDED
METER. ROUTE BELOW GRADE TO SERVE GENERATOR.
509
1-014' NO UP.
510
VERIFY LOCATION OF EXIST NO FLOOR CLEANOIITS IN FLOOR ABOVE. IN THE EVENT
THAT NONE EXIST INSTALL NEW FLOOR CLEANOUTS.
8 101
' S(WC FCO
2-S(PVC)
2" S(PVC)
— 501, - — — — — — — — — — — — — — — —
7 S(PVC) t r
sot
�FOU NDATION LEVEL PLUMBING PLANNDATION LEVEL PLUMBING PLAN
BSA
BSA LifeStructures
9365 Counselors Row Suite 300
Indianapolis, IN 46240-1478
ph 317.819.7878 fx 317.819.7288
www. bsafrfestructures.00m
VISIONFIRST
Indiana Lions Eye Bank
OFFICE AND
LAB
RENOVATION
CLIENT PROJECT NO. - 21160001
CONSTRUCTION
DOCUMENTS
&ME
T KEYPLAN
aIAN NOM
MARK
1 DATE
1 DESCRIPTION
2
1 0112212019
JADDENDUM2
zG No.'
PE10302020
STATE OF
FOUNDATION' LEVEL
PLUMBING PLAN
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Cannel