Loading...
HomeMy WebLinkAboutP 300Y EXISTING W S INVERT: 739.18 J PLUMBING NEW GENERAL NOTES A. REFER TO SHEET P001 FOR PLUMBING GENERAL NOTES. PLAN NOTES 500 2'SUPTO PD. 501 2' S UP, 502 3'SUP. 503 4'SUP. 504 2'VUP, 505 CONNECT NEW S PIPING TO EXISTING S PIPING BELOW GRADE. 506 VERIFY LOCATION AND CONDITION OF EXISTING BUILDING SANITARY EXIT. PROVIDE EXTERIOR CLEANOUT IN THE MAIN IN THE EVENT ONE DOES NOT EXIST. 507 FIELD VERIFY EXISTING LOCATION,ROUTING, CONDITION, AND SIZE OF SANITARY MAIN SERVING THE BUILDING. NOTIFY PROJECT ENGINEER OF FINDINGS. 508 CONNECT I-114' NO PIPING TO EXISTING DOWNSTREAM OF UTI LITY PROVIDED METER. ROUTE BELOW GRADE TO SERVE GENERATOR. 509 1-014' NO UP. 510 VERIFY LOCATION OF EXIST NO FLOOR CLEANOIITS IN FLOOR ABOVE. IN THE EVENT THAT NONE EXIST INSTALL NEW FLOOR CLEANOUTS. 8 101 ' S(WC FCO 2-S(PVC) 2" S(PVC) — 501, - — — — — — — — — — — — — — — — 7 S(PVC) t r sot �FOU NDATION LEVEL PLUMBING PLANNDATION LEVEL PLUMBING PLAN BSA BSA LifeStructures 9365 Counselors Row Suite 300 Indianapolis, IN 46240-1478 ph 317.819.7878 fx 317.819.7288 www. bsafrfestructures.00m VISIONFIRST Indiana Lions Eye Bank OFFICE AND LAB RENOVATION CLIENT PROJECT NO. - 21160001 CONSTRUCTION DOCUMENTS &ME T KEYPLAN aIAN NOM MARK 1 DATE 1 DESCRIPTION 2 1 0112212019 JADDENDUM2 zG No.' PE10302020 STATE OF FOUNDATION' LEVEL PLUMBING PLAN RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Cannel 1�01NGICI DATE: 02/20/19 DATE DEC. 19, 2018 BSALS PROJECT NO. 21160001 P300