HomeMy WebLinkAbout[2] 181121 LOT 17 HVAC-M101LINED RA PLENUM BOX FULL SIZE
OF FAN COIL INLET
REFRIGERATION PIPING.
INSTALL PER
MANUFACTURES
RECOMMENDATIONS
SUPPLY AIR DUCTING
45 DEG
RECTANGULAR
DUCT
BRANCH
OCL CONNECTION J/
TAKE OFF. HAMMER
LOCKED OR FLANGED AND
FULLY SEALED
ROUND SHEET METAL
DUCT TO DIFFUSER V.D.
45 DEG. HIGH EFFICIENCY
TAKE OFF COMPLETELY
SEALED
FILTER RACK
FAN COIL
ELECTRIC HEATER SCHEDULE
MARK
MANUFCTR
MODEL NO.
HEATING KW
VOLTAGE
PHASE
ACCESSORIESIREMARKS
AWH
QMARK
AWH4407F
3.0
240
1
iO
EUH
QMARK
MUH0381
3.0
240
1
iO
O RECESSED WALL HEATER, PROVIDE WI
INSULATED
OUTSIDE AIR DUCT
WITH MOTORIZED
AND MANUAL
DAMPER.ROUTE
TO WALL CAP
RETURN AIR DUCTING
20" MIN
WORK AREA
CAP AND PROVIDE WATER SHUT
OFF SWITCH IN DRAIN PAN.
j PVC DRAIN FROM TRAP W ITH CLEAN OUT.
SLOPE AT MIN'. PER FOOT AND SUPPORT TO
STRUCTURE MINIMUM 5' O.C.
SECONDARY DRAIN PAN, EXTEND
MINIMINUM 6" PAST ENTIRE FAN COIL
SUPPORT AT MINIMUM 16" O.C.
f�HORIZONTAL FAN COIL DETAIL
~ SCALE: NONE
30° MAX
I
O
rc �_
a
30° MAX
ECCENTRIC TRANSITION MAX,
30 DEG.
OFFSET. PROVIDE MINIMUM 2"
STRAIGHT SECTION AT EACH
END. MAX 30 DEG.
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Camel
DATE: 02/28/19
N
NOTE:
IN GENERAL, ELBOWS TO HAVE
FULL TURNING RADIUS (R-A).
WHERE "R" IS EQUAL TO OR
GREATERTHAN"A" MINIMUM
RADIUS (R) = 4 INCHES.
CONCENTRIC
TRANSITION MAX, 45
DEG. DIVERGING AND
60 DEG. CONVERGING
NOTE:
DOUBLE THICKNESS
TURNING VANES TO BE USED
WHERE NORMAL RADIUS
ELBOW IS IMPRACTICAL
8 WHERE ELBOW IS WITHIN 5
FT OF A
BRANCH TAKE -OFF.
DUCT CONSTRUCTION DETAILS
B\itvSCALE: NONE
HP-1 HP-2
5Ton 5Ton
�1 �1
0LEVEL 1 HVAC PLAN
SCALE: 1/4" = 1'-0"
GOODERUM & ASSOCIATES ENGINEERING
MEP Engineer
874Chelenham Way
Avon, IN 46123 AL
P: 31].506.81506.8151
F: 317.]45.5761
E: dave®gnaengineenng.00m
GENERAL NOTES:
1. REFERENCE SHEET M-001 FOR LEGENDS,
ABBREVIATIONS, SPECIFICATIONS AND NOTES.
2. REFENRENCE SHET M-102 FOR SCHEDULES
AND DETAILS.
KEY NOTES:
O INSTALL ELECTRIC UNIT HEATER IN SPRINKLER
RISER ROOM. COORDINATE WITH SPRINKLER
CONTRACTOR.
O SHELL SPACE HVAC SYSTEM. PROVIDE
HORIZONTALLY HUNG FAN COIL AND HEAT PUMP
UNIT. STUB OUT RETURN PLENUM TAP AND
CONNECT FRESH AIR DUCT TO WALL CAP. STUB
OUT SA DUCT AND PROVIDE THERMOSTAT. CHECK
TEST AND START SYSTEM FOR FUTURE TENANT
BUILD OUT. SEE DETAILS ON SHEET M002.
COORDINATE FINAL LOCATION WITH G.C.
O INSTALL ARCHITECTURAL ELECTRIC WALL HEATER
IN STAIR WELL ENTRY.
i
nW-
L
n
O
M
U
z
V
LL
J
m
W
LU
F�
z0
U
p LH
w
w
IiUO
N
LLB
�
d
r
r
O
�
�
W
�
Z
�
O
O
�
z w
~
O
O �
LL
U N r
U
U w z C
� w w
u5=z
u
K O
fO uriQ2
�c�Uw
o U
a4a
a z
a'u
Su
Nia
0
w
SHEET NO
LEVEL
HVAC PLAN
DATE
I2/9/18
M101