Loading...
HomeMy WebLinkAboutCJ181033.0211DAILY SUMMARY REPORT Report Number:CJ181033.0211 Service Date:03/01/19 7770 W New York St Report Date:03/05/19 Indianapolis, IN 46214-2988 317-273-1690 Client Project Gibraltar Construction Corp West Park: The Groves Attn: Douglas Perry 3030 West 116th St. 2932 N Webster Ave Carmel, IN 46032 Indianapolis, IN 46219 Project Number: CJ181033 Services: As requested, a representative of Earth Exploration, Inc. was on project site to perform construction materials testing services. Earth Exploration, Inc. Rep.: Eric Halfhill Reported To:Gibraltar Construction Contractor:Gibraltar Construction Report Distribution: (1) Gibraltar Construction Corp, Douglas Perry (1) City of Carmel IN, Mike Sheeks (1) Johnson Wilbur Adams, Inc., Michael Wilbur (1) Smith Group JJR, Jessie Fink Reviewed By:____________________________________ Jeremy Clem Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 10-16-13, Rev.10 Page 1 of 1 FOUNDATION OBSERVATIONS All tests meet specifications See Foundation Observation Report for details Some tests do not meet specifications See Construction Observation Report All tests do not meet specifications None Performed IN-PLACE DENSITY TESTS All tests meet specifications See In-Place Density Test Report for details Some tests do not meet specifications Passing retests obtained All tests do not meet specifications None performed CONCRETE, GROUT, MORTAR SAMPLING/TESTS Tests performed:Slump Slump Entrained Air Temperature Unit Wt.Yield Number of specimens cast Total Quantity Yd3 Specimen Type:Cylinders Beams Motar Cubes Grout Prisms Other None Performed ASPHALT SAMPLING/TESTS Tests performed:Nuclear Density Temperature Thickness Bulk Sampling Number of Tests Total Quantity Tons Core Sampling Number of Cores Marshall Density Extraction/Gradation None Performed Stability / Flow Weather: Partly Cloudy, Low 30’s to High 30’s See attached Daily Construction Observation Report. DAILY SUMMARY REPORT Report Number:CJ181033.0211 Service Date:03/01/19 7770 W New York St Report Date:03/05/19 Indianapolis, IN 46214-2988 317-273-1690 Client Project Gibraltar Construction Corp West Park: The Groves Attn: Douglas Perry 3030 West 116th St. 2932 N Webster Ave Carmel, IN 46032 Indianapolis, IN 46219 Project Number: CJ181033 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 10-16-13, Rev.10 Page 1 of 2 Weather: Partly Cloudy, Low 30’s – High 30’s 1.Earth Exploration, Inc. (Earth) was on-site today at the request of Gibraltar Construction (Gibraltar) to observe the construction activity being performed today at 116th street Carmel, Indiana. 2.Upon arrival at the project Earth observed Gibraltar placing what appeared to be No.53 crushed limestone over the silty clay subgrade at the entrance of building connecting to 116th street. 3.Earth noted the silty clay subgrade could not fully be reviewed due to placing what appeared to be No.53 crushed limestone over the previously prepared subgrade area at the location noted above, However Earth noted that Gibraltar informed Earth that the City Of Carmel (Inspector) previously performed a proof-roll procedure and recommended approximately 12” under-cut be performed and placed geo grid due to what appeared to be soft soil/subgrade condition and then approved the subgrade condition for that area as noted above. 4.The results from today’s activities were communicated to representatives from Gibraltar. Please see the attached photographs for additional information regarding the activities of the day. DAILY SUMMARY REPORT Report Number:CJ181033.0211 Service Date:03/01/19 7770 W New York St Report Date:03/05/19 Indianapolis, IN 46214-2988 317-273-1690 Client Project Gibraltar Construction Corp West Park: The Groves Attn: Douglas Perry 3030 West 116th St. 2932 N Webster Ave Carmel, IN 46032 Indianapolis, IN 46219 Project Number: CJ181033 Services: As requested, a representative of Earth Exploration, Inc. was on project site to perform construction materials testing services. Earth Exploration, Inc. Rep.: Eric Halfhill Reported To:Gibraltar Construction Contractor:Gibraltar Construction Report Distribution: (1) Gibraltar Construction Corp, Douglas Perry (1) City of Carmel IN, Mike Sheeks (1) Johnson Wilbur Adams, Inc., Michael Wilbur (1) Smith Group JJR, Jessie Fink Reviewed By:____________________________________ Jeremy Clem Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 10-16-13, Rev.10 Page 2 of 2