Loading...
HomeMy WebLinkAbout131STR - Right-of-way Permit ApplicationRIGHT-OF-WAY PERMIT PERMIT NUMBER: 1 9 01 0 0 2 3 TODAY'S DATE: 2-/T/ I q ESTIMATED DATE OF WORK: 2-18-)q APPLICANT (Person doing the work) COMPANY: ll Adele Wb0✓ Bw Id iyy ADDRESS: 3L Ft rF rfi N!: Cg,-eI IN V603-L PHONE: 631,(' EMAIL PERMIT TO: P¢rn;f S - 6c afti rs�J (aC,F*� CUSTOMER: yv ADDRESS: PHONE: ADDRESS OF PROJECT: I G SO tv DESCRIPTION OF WORK (check all that apply) ROAD BORE DRIVEWAY REPLACEMENT 0 CONSTRUCTION ENTRANCE LANE CLOSURE El STREET CUT E] ROAD CLOSURE OTHER 0 DESCRIPTION: Se]5 3acow TYPE OF SURFACE CUT (if applicable): 0.1-- mix 'tat „y as OF RVH�O-L a *NOTE: OPEN CUTS IN PAVEMENT REQUIRE BOARD OF PUBLIC WORKS (BPW) APPROVAL* USE OF HEAVY EQUIPMENT YES NO 's+ -'-+ "t' ­t w: U .t be d.r"' DRAWING ATTACHED YES NO *NOTE: ON REVERSE SIDE OF THIS PERMIT, PROVIDE NAMES AND CONTACTS OF ALL SUB -CONTRACTORS INVOLVED SURETY BOND. Please see Item #1 of the Right -of -Way Conditions. BONDING COMPANY: L.'6t-,IV M -F-+1 /04,4 LgJv.(1:y BONDING NUMBER: 6 0 111614 7 EXPIRATION DATE: 3131 102.0 As applicant for this Right -of -Way Permit, 1 understand and agree to all of the specifications and I �71conditions list eq thettached sheet. 4. CZ.k� (Applicant's Signature) (Print Name) PERMIT GRANTED BY: DATE ISSUED: (City Official) COMMENTS: REPAIR WORK INSPECTED AND APPROVED I have inspected the repair of the above right-of-way and find it to be completely satisfactory. (City inspector) (Date Released) 4J HW -P-