Loading...
HomeMy WebLinkAboutA0019'-0" FOUNDATION9'-1" 8'-1"T/ 2nd FLR. DBL. TOP ⅊ T/ 1st FLR. DBL. TOP ⅊ 9'-1" 8'-1"T/ 2nd FLR. DBL. TOP ⅊ T/ 1st FLR. DBL. TOP ⅊ T/ 2nd FLR. SUBFLR. T/ 2nd FLR. SUBFLR. 812" 1x4 WINDOW TRIM - SIDES & TOP 1x6 WINDOW TRIM BRICK SILL - SLOPE 1" - PROJECT BOTTOM 1" - SOLDIER COURSE BELOW - PROJECT 12" & OFF SET BY (1) BRICK BRICK THRESHOLD - DTL. 06/D1.0 1x4 TRIM 8'-5"12" x 9 12" HARDBOARD FRIEZE - w/ BLOCKING - w/ BARGE MOULD 59"h LOUVERED SHUTTER KEYSTONE DETAIL 03/A1.1 - w/ BRICK SOLDIER PULLED 12" (7" ARCH)r=1' -25 8" 1x12 ARCHED TRIM - DTL. 07/D2.1 FYPON DECORATIVE LOUVER # LV18x36 - ATTACH TO SHEATHING - w/ 1x4 TRIM ON EACH SIDE 1x8 RAKE BOARD - EXTEND 12" FROM SHEATHING 1x8 GABLE FRIEZE - w/ BRICK LADDER - w/ BARGE MOULD 12" x 9 12" HARDBOARD FRIEZE - w/ BRICK LADDER - w/ BARGE MOULD 1x8 RAKE BOARD - EXTENDED 12" FROM SHEATHING 1x8 GABLE FRIEZE - w/ BRICK LADDER - w/ BARGE MOULD 1x10 ARCHED TRIM - RIP TO FIT 10 12 10 12 1x4 CORNER TRIM 1 2" x 9 12" HARDBOARD FRIEZE - w/ BLOCKING - w/ BARGE MOULD KEYSTONE DETAIL 03/A1.1 - w/ BRICK SOLDIER PULLED 12" LOUVERED SHUTTER 59"h - SEE DTL. 17/D1.0FYPON WINDOW HEAD WCH36x10BT BOX RETURN - SEE DETAIL 09/D1.0 8" 2'-13 4" 2'-13 4" 2'-13 4" 812" 2'-13 4" 812" 1x6 WINDOW TRIM 6 12 12 D1.0 01 A1.1 812" T/ 1st FLR. SUBFLR. T/ 1st FLR. SUBFLR. ###4'-0"1'-9 7 8" 11 16 FYPON DECORATIVE LOUVER -LV18x16 - W/ 1X4 TRIM SURROUND 17 17 1x4 CORNER TRIM 3 5 10 7 169 12 4 1 2 5 3 1 2 15 10 7 17 4'-2"5 12 8 12 8 24" 6 12 8 12 84'-8"FYPON DECORATIVE LOUVER -LV18x16 - W/ 1X4 TRIM SURROUND Note: All square footage calculations are taken to face of veneer. Gross square footage: Includes square footage that takes into account floor space in a two-story volume. Net square footage: Gross square footage minus the floor space in a two-story volume. Net square footage should be used for determining appraisal value. SQUARE FOOTAGE GROSS AREA NET AREA BASEMENT (UNFINISHED) FIRST FLOOR GARAGE PATIO PORCH SECOND FLOOR 1661 Sq.Ft. 1647 Sq.Ft. 649 Sq.Ft. 24 Sq.Ft. 110 Sq.Ft. 1742 Sq.Ft. 1661 Sq.Ft. 1647 Sq.Ft. 649 Sq.Ft. 24 Sq.Ft. 110 Sq.Ft. 1425 Sq.Ft. ALL SIDES: HORIZONTAL OR SHAKE SIDING TO BE FIBER CEMENT BOARD SIDING MATERIAL: WILLIAM L.KAUF H OL Z ARCHITECTTALLYNS RIDGEREASON FOR PLOT: PLOT DATE: Job No. Sheet No.INHOMESITE NO. OFFICE REVIEW:MASTER BY: DATE: C DATE: 3940 OLYMPIC BLVDERLANGER, KY 41018PH: (859) 341-4709FIELD SPEC HOTLINE: (859) 341-4709COPYRIGHT ALL RIGHTS RESERVED FISCHER HOMES, Inc. JOB INFO:DATE: PERMIT: SIGN-OFF: CONSTRUCTION:REVISION:REVISION:REVISION:REVISION:HOME TYPE:PLAN:1/14/2019 3:30 PM# TLR010100000 NAGENDRA TOMAR3291 TAMERLANE PLACECLAYTON 54-370-CLAYTON AMERICAN CLASSIC WITH BRICK CARMEL, IN10 05/2017MP------------------------------------------------ fieldspecchange@fischerhomes.com REVISED BY:-------- ----SAPPHIRE TRADE SUPPORT sapphiretradepartners@fischerhomes.com Fischer Homes Indianapolis II, LLCA1.0 MATERIAL LEGEND 1 3 1x8 RAKE BOARD 4 1x8 GUTTER BOARD - w/ ALUM. GUTTER & DOWNSPOUTS 12" x 912" HARDBOARD FRIEZE - TRIM TO T/ WINDOWS 5 FIBERGLASS / ASPHALT SHINGLES 6 PREFINISHED CORNER TRIM - TYPICAL w/ VINYL SIDING <OR> 1x4 CORNER TRIM - TYPICAL w/ FIBER CEMENT PLANK SIDING / PANELS 7 1x6 WINDOW JAMB TRIM 8 9 1x8 WINDOW JAMB TRIM 1x10 WINDOW JAMB TRIM 12 1x12 KICK PLATE - TRIM TO FIT 13 (2) 1x8 KICK PLATE - BUTTED TOGETHER 10 2 1 4"h. x 4"d. CAST STONE SILL - PROJECT BOTTOM 1"± HORIZONTAL SIDING - REFER TO BOX NOTE BELOW FOR MATERIAL - SEE DTL SHEETS WS-V OR WS-F SHAKE SIDING - REFER TO BOX NOTE BELOW FOR MATERIAL - SEE DTL SHEETS WS-V OR WS-F FIBER CEMENT BOARD PANEL - STUCCO FINISH - SEE DTL SHEET WS-F ALL MATERIALS ARE 'TYPICAL' UNLESS OTHERWISE NOTED FIBER CEMENT BOARD PANEL - SMOOTH FINISH - SEE DTL SHEET WS-F CULTURED STONE VENEER - REFER TO SELECTIONS - SEE DTL SHEETS WS-C BRICK VENEER - SEE DTL SHEETS WS-B WAVEY-EDGE CEDAR SIDING - SEE DTL SHEETS WS-V OR WS-F 11 BRICK SILL COURSE - SLOPE 1" - PROJECT BOTTOM 1" 2 1x8 GABLE FRIEZE NOTE: REFER TO A7.0 FOR THE ROOF PLAN, RIDGE VENT LOCATIONS, AND GUTTER AND DOWNSPOUT LOCATIONS. 14 2 1 4"h. x 23 4"d. CAST STONE SILL - PROJECT BOTTOM 3 4"± 15 12" x 912" HARDBOARD FRIEZE, LAPPED - TRIM TO T/ WINDOWS 16 1x8 BAND BOARD 17 1x6 CORNER TRIM 18 1x12 TRIM 19 1x8 TRIM 20 3 5 8 "h. x 65 8"d. CAST STONE SILL -PROJECTBOTTOM 1"± FIBER CEMENT BOARD PANEL - VERTICAL SIDING - SEE DTL SHEET WS-F 21 1x4 TRIM 22 1x10 TRIM 23 1x6 TRIM 24 BLOCKING @ TRUSS CANTILEVER NOTE: DASHED LINES BELOW T/ FOUNDATION DEPICT INSTALLED WINDOWS OR DOORS - LOCATED PER A2.0 SCALE = 1'-0" FRONT ELEVATION 1/4"01 SCALE = 1'-0" LEFT SIDE ELEVATION 1/8"02 SCALE = 1'-0" REAR ELEVATION 1/8"03 SCALE = 1'-0" RIGHT SIDE ELEVATION 1/8"04 01/31/19 William Hohlt