Residential
SANITARY SEWER PERMIT
999913164
Permit Type
Final
Subdivision
Albany Place
Project WO
ENG332015
Section Number
Project Name
Albany Place Section 1
Lot Number
8
Project Developer
Platinum Properties
Address Number
14303
Lift Station
23 126th Street Station
Address 2
Treatment Plant
MIX
Street
Millner Drive
Parcel Acreage
0.34
City
Carmel
EDU in Gallons
310
Zip Code
46074
County
Local Sewer Charge - District Contribution 0.00 Builder Drees Homes
Plan Review and Inspection 0.00
Phone Number 317-347-7300
Application Fee 150.00
EDU Fee 1908.00 Owner
Interceptor Fee 0.00 Phone Number
Other Fees 0.00
Fees Due 2058.00 Occupant
Invoice Number Phone Number
PLEASE NOTE: Installation of building sewer shall be per the specifications of the TriCo Regional Sewer Utility (see
reverse) and any conditions noted below. All installations shall be inspected by TriCo personnel during "open trench"
phase and before backfilling with stone to twelve inches above the pipe. NO footing or foundation drains, or other
sources of ground or stormwater, shall be permitted to enter TriCo's sanitary sewer system. TriCo will assume no
liability for drains which are below the grade level of the nearest downstream manhole nor for laterals which are
extended beneath driveways or sidewalks. The permit holder (property owner, developer or builder) will be
responsible for damages to TriCo's sewer system. This includes damages to manholes, castings, manhole lids and
the like; caused by construction activity on the building site which is the subject of this permit.
Inspections by TriCo are MANDATORY and shall be arranged by contacting TriCo's office at 844-9200 24 hours in
advance. All new construction will be placed on billing two months after connection has been made or when water is
connected, whichever comes first.
The building has: Main ID: AP709-AP708
Grease Trap Slab Foundation USMH AP -709 AP -708 DSMH
Grease Interceptor Crawl Space Manhole IDs
Grit Interceptor Basement YES Lid Elevation 917.98 917.68
Grinder Station First Floor Elevation 920.90 920'
.90
Water Service City of Carmel Basement Elevation 910.70 ✓/ 910.70%/
Calculation is based on both Manhole Lid Elevations and the elevation of the First Floor _2.921, 11-_ 3.22; Ft.,
Per Ordinance 9-13-99 and the elevations provided: the substructure shall be plumbed by: Ejector Pump Only
TriCo currently requires that an I&I inspection !c performed and a Certificate of Compliance is issued prior to occupancy /
sale of a proper-ty. Please review attached 1/i. Permit.
Manholes shall remain accessible at al! t:me,;_6urind mantio!es will be corrected by the Developer/Owner.
V— The proper class of cleanout must be instal ed evey IOC r.'t of lateral pipe measured from sewer main to structure.
The terms of the conditional permit, if any, are list ±i'aeivw. �G\�NpL SEWERGrr
Plans have been submitted. _
All fees have been paid. Go
No certificate of insurance required. _ ~
Nn arirtitinnal Hermits reouired. r°
No manhole core permit required.
The facility is not classified as a FOG faci
By signing below, I attest that I am
Builder / Owner Signature
Printed Name
Approved By
Ryan
Permit is valid for
(Notes)
with tstri specifia ns and agree to accept responsibility for all work done der this permit.
Phone Number. 517'�/r'i'"
from the date issued. Permit valid only with TnCo seal in red ink.
02/12/2019