Loading...
HomeMy WebLinkAbout2363 A1-02_Equipment PlanMAKE-UP AIR UNIT. SEE MECHANICAL DWGS ELEC PANELS FEE FILTERSN 3—DOOR LJ 2—DOOR OVENO F8 I SS TABLE \.0 B1 MC FREEZER COOLER 48"X24' RELOCATED ETR ETR FB SS TABLE F6 RELOCATED VEO SS RACK FRYER 48x18 0 F9 RELOCATED x m x m PREP ' SS w ca u a ETR ETR PREP COOLER w rca rc� w PREP SINK HAND SINK F3 ow O MICRO MW m F! WAVE z 3 m Y� O �` r K GrREAS ca Liu HALF WALL BACKROOM pd w w a z rc B2 m m ~ an ILL! a _ m m 20 HEAD FI / FOUNTAIN a \ 4 HEAD W ICE MACH CHICKEN HEATED rc \ VIPER DISPLAY CASEm Mop / 6j SINK NEW NEW NEW O W/H r w m zlo L_ -- 9 WHS__ I i RDYrcm 0 9' IN LINE CA NEW 4 SIDED FRITO MB L--J NEW r � N r w W 3 6' 2 PEG CANDY F Iw a .1 J wil0 Nz O OO zl2 MEAT �m L—J C) ` LL NUTS SNACK J w Of \ RELOCATED Z _rQ I 2& MERCHANDISING 3 r \ 3I w z COOKIE CRACKER w M3 zl IA MORN. HBC nou FOOD L RELOCATED NEW JTAS Y ywAKE � w z �APP = Jz r— — mm M9 8' x NEW M4 '^ GN MANAGER'S cl Q MT ETR cs c2 C2 M6 OFFICE COFFEE PROGRAM ETR O VEEDER MlatawnW MDIMwrs im ROOT q„` M€ N EQUIPMENT PLAN 1/4• — 1'-0" RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and meal Codes City of Camel DATE: 03/07/19 Doi RTI TANKS / \ F5 14"V \ /1q WOMEN O O\ MEN 10�1 / r7l"I / EQUIPMENT PLAN GENERAL NOTES: / 1. FINAL SELECTION AND LAYOUT OF EQUIPMENT TO BE DETERMINED BY OWNER AND REVIEWED BY ARCHITECT. 2. PROVIDE TOOL FREE ACCESS PANELS TO ASSOCIATED INDIRECT DRAINS IN ALL CABINETS WITH EQUIPMENT RELATED TO INDIRECT DRAINS. 3. CONTROLS AND OPERATING MECHANISMS ALONG ACCESSIBLE ROUTES SHALL COMPLY WITH ACCESSIBILITY REQUIREMENTS. 4. FOOD SERVICE LINES SHALL HAVE A MINIMUM OF 36' CLEAR. SELF SERVICE SHELVES AND DISPENSING DEVICES FOR TABLEWARE, DISHWARE, CONDIMENTS, FOOD AND BEVERAGE SHALL BE INSTALLED TO COMPLY WITH ACCESSIBILITY REQUIREMENTS. FRONTAPPROACH ITEMS SHALL BE NO HIGHER THAN 48' AND NO LOWER THAN 15' FROM FLOOR LEVEL. SIDE APPROACH ITEMS SHALL BE NO HIGHER THAN 48' AND NO LOWER THAN 15' FROM FLOOR LEVEL. 5. BEVERAGE DISPENSER TO HAVE PUSH-BUTTON ACTUATION. 6. EQUIPMENT MOUNTING INSTALLATION REQUIREMENTS: ALL COUNTER MOUNTED EQUIPMENT WEIGHING OVER 30 LBS SHALL BE SEALED TO THE COUNTER OR BE PROVIDED WITH 6' LEGS. ALL FLOOR MOUNTED EQUIPMENT SHALL BE SEALED TO THE FLOOR, BE PROVIDED WITH 6' LEGS OR SHALL HAVE CASTERS. FOOD EQUIPMENT LEGEND NO. DESCRIPTION EXISTING NEW PROVIDED CONNECTIONS BY ELECTRIC PLUMBING OTHER F1 KRISPY KRUNCHY HEATED DISPLAY CASE 0 CIRCLE K 0 F2 NEMCO COUNTERTOP WARMER 0 CIRCLE K 0 F3 AMANA COMMERCIAL MICROWAVE RCS10TS 0 CIRCLE F! STAINLESS STEEL PREP COOLER 0 CIRCLE Fj KRISPY KRUNCHY RICE COOKER 0 CIRCLE K F6 STAINLESS STEEL WORK TABLE 0 CIRCLE ORESFAB VENTLESS FRYER MB-85ATV 0 CIRCLE K FB CADCO LINE CHEF MANUAL COUNTERTOP CONVECTION CIRCLE K OVEN MF-133 F9 TRUE SOLID DOOR REACH -IN REFRIGERATOR T49 0 CIRCLE K F10 MCCALL 3-DOOR FREEZER 0 CIRCLE K F11 RTI OUTDOOR TANKS (FRYER OIL) 0 CIRCLE K BEVERAGE EQUIPMENT LEGEND NO. DESCRIPTION EXISTING NEW PROVIDED CONNECTIONS BY ELECTRIC PLUMBING OTHER B7 EVERPURE HIGH FLOW CSR QUAD MC2 SYSTEM 0 CIRCLE K B2 MANITOWOC BAG -IN -BOX RACK 0 CIRCLE K B3 CORNELIUS VIPER HIGH OUTPUT FROZEN 4-FLAVOR CIRCLE FROZEN DISPENSER Bd MANITOWOC MDH 302402 BEVERAGE DISPENSER BS MANITOWOC QUIET CUBE S-1470C REMOTE ICE CUBE CIRCLE K MACHINE COFFEE BAR EQUIPMENT LEGEND NO. DESCRIPTION EXISTING NEW PROVIDED BY CONNECTIONS ELECTRIC PLUMBING OTHER CI BUNN JDF SERIES ICED COFFEE CIRCLE K C2 CURTIS GEMINI INTELLIFRESH COFFEE BREWER GEMTIF CIRCLE K 11111 ONOT USED C4 CURTIS G3 PRIMO CAPPUCCINO DISPENSING SYSTEM PCGT5 CIRCLE K OINTERNATIONAL DELIGHT CREAMISER MODEL 215 CIRCLEK 0 + MECHANDISING EQUIPMENT LEGEND NO. DESCRIPTION EXISTING NEW PROVIDED CONNECTIONS BY ELECTRIC PLUMBING OTHER M1 BEVERAGE -AIR FEM MM14 BEVERAGE COOLER COKE 0 CIRCLE K M2 ATM 0 CIRCLE K Mi HATCO 38' BAKERY CASE 0 CIRCLE 0 M! UNDERCOUNTER REFRIGERATOR 0 CIRCLE K MS GEHL'S DUAL CHILE/CHEESE DISPENSER 0 CIRCLE K M6 STAR GRILL -MAX ROLLER GRILL 0 CIRCLE M7 AMANA COMMERCIAL MICROWAVE RCS10TS 0 CIRCLE MB RED BULL COOLER 0 CIRCLE K y9 2-DOOR GDM FREEZER 0 CIRCLE K EQUIPMENT VERIFICATION: GENERAL CONTRACTOR TO REQUEST A COPY OF TENANT EQUIPMENT ORDER PRIOR TO START OF ELECTRICAL EQUIPMENT WIRING. EQUIPMENT LIST TO BE REVIEWED BY OWNER, GENERAL CONTRACTOR, ELECTRICIAN, ARCHITECT AND ELECTRICAL ENGINEER FOR FINAL COORDINATION. M M N Nm 0 }' Y (n�, m 3so 0 c) N Z Y�- _4)�� OZ mm V Z — 4% '02 LiF p� w E z ia3 QV�U �UaU U U a$ g �J `o CID � mm $e � DO 90 e� J\G aQuo o LL ru W Y f � iaiunomJn�� W w C N N O O z o � � d IY o w LU D- O ji 7 In m z J M IL C17 Z N � J � W IL 70 Ir U a (% LLIC� 0 DMWN PV SDM SDM S�Z 1141= 11 ENE DALE 13-603 Al =02