Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
S001 - 229JGB
UP BEDROOM #2 BATH #3 OFFICE MEDIA UNFINISHED STORAGE/ MECHANICAL 2 ID1 RETURN AIR CHASE FROM ABOVE ZERO THRESHOLD SHOWER ABOVE LINE OF MAIN FLOOR WALL ABOVE OPEN TO ABOVE 16R-15T @10" R.C.14R-13T @10" R.C.UP UP 2/8‐6/8 3/0‐6/82‐2/8‐6/82/6‐6/8 2/8‐6/8 2/8‐6/8 2‐2/8‐6/84040 GW8'-4"H. BULKHEAD 8'-4"H. BULKHEAD TOILET CENTERLINE 8'-9 1/2"H. ROUGH CLG. 8'-9 1/2"H. ROUGH CLG. 8'-9 1/2"H. ROUGH CLG. 2x6 LOAD-BEARING WALL DBL. 2x4 LOAD-BEARING WALL OPEN BELOW STAIRS 3 1/2" ADJUSTABLE STEEL COLUMN, TYP x 4 LVL HEADER w/ SOLID BEARING EACH END DROPPED WOOD BEAM w/ SOLID BEARING EACH END 8' - 4" 3' - 8" 7" 18' - 1 1/2" 3 1/2" 21' - 0"2' - 4 1/2"4"11' - 8" 4" 6' - 10" 6' - 10"4" 12' - 4" 3 1/2" 2' - 1" 3 1/2" 5' - 0" 3 1/2" 9" 3 1/2" 10' - 4" 4"3 1/2"4' - 0 1/4" 4' - 0 1/4" 1' - 0 1/2"4"4" 20' - 4" 5' - 10" 4' - 10" 4" 25' - 11 1/2" 3 1/2" 2' - 1" 4"3' - 7 1/2" 3 1/2"3' - 8"3 1/2"7' - 11" 5 1/2"3' - 11 1/2" 3' - 11 1/2"15' - 9 1/2"7"12' - 0" 4" 7' - 2"1' - 6" 3' - 4" LVL HEADER w/ SOLID BEARING EACH END 2' - 2"4" 3' - 1" 3 1/2" 25' - 3" 8' - 7"3 1/2"3' - 8" 4"1' - 2"4' - 4"10' - 10" 6' - 10" 2' - 3 1/2"3" 7' - 7" 8"4' - 5"3' - 0" 6"ACCESS 8" 3' - 1" 22' - 10 1/2"3 1/2" 3 1/2"5 ID1 23' - 2"7' - 9 3/4"14' - 2 1/4" 14' - 2 1/2" 13' - 9 1/2" 4' - 1 3/4" 42' - 0 1/2" 3 1/2" 3' - 8" 4" MECHANICAL BULKHEAD 2' - 0"CUSTOMER:PROJECT NAME:LOCATION:DRAWING TITLE: DRAWN BY:WedgewoodBuilding Co., LLC317.669.6300 32 First Street NECarmel, IN 46032www.wedgewoodbc.comCopyright c 2015 Wedgewood Building Co. LLC.02/06/2019 12:58:35 PM A5Colvin Residence229JGB Colvin229 Bridgemont at Jackson's GrantLOWER LEVEL FRAMING SBS1/4" = 1'-0"1 LOWER LEVEL ROUGH FRAME PLAN ROUGH FRAMING NOTES: 1. DOORS ARE TO BE 4.5" OFF OF WALL INTERSECTIONS OR CENTERED IN THE WALL U.N.O. 2. REFER TO COVER PAGE FOR SPANISH TRANSLATIONS = REFERIRSE A LA PORTADA DE LAS TRADUCCIONES AL ESPAÑOL.Rev.No. Date Description02/19/19 Adam Schriner