HomeMy WebLinkAboutS203 - 75JGWDN
BEDROOM 2
W.I.C.
BEDROOM 4
MASTER
BEDROOM
BATH 2
BEDROOM 3
MASTER
BATH
BENCHCLOSET CLOSET
BATH 3
LOFTLINEN2/82/82/62/6 2/62/4
2/42/62/4
2/62/6 CO
2/4 CO2/4 2/42/4 2/41/63/0x7/0 BARN
DOOR
2856S200 2856S200
2856S200 2856S200 CXW135CX125 CX125 CX125 2856S2002856S200 18'-7" X 12'-0" +
11'-4" X 12'-0"
13'-2" X 11'-6"
11'-8" X 17'-8"
12'-2" X 10'-1"
13'-4" X 19'-0"
8'-4" CLG HT
LINEN8'-6" CLG HT2/4 POC
CW245
CX163
RIDGE
VALLEY
3/6x8/4
DRYWALL
OPENING
W.I.C.STOR
20R 19T
10" R.C.
DRYWALL
OPENINGSOAP NICHE
10'-1 1/8" H. CLG.
9'-1 1/8" H. CLG.
2856S200
ID1
2
2ND FLOOR FINISH NOTES:
1. ALL DRYWALL TO BE THICKNESS PER CODE.
2. ALL FLOOR DECK AREAS TO HAVE 1/2" DUROCK UNDERLAYMENT WHERE CERAMIC TILE FLOOR FINISH IS SPECIFIED
3. CERAMIC TILE AREAS (EXCLUDING FLOORS) TO HAVE TILE BACKER BOARD UNLESS NOTED OTHERWISE (U.N.O.)CUSTOMER:PROJECT NAME:LOCATION:DRAWING TITLE: DRAWN BY:WedgewoodBuilding Co., LLC317.669.6300
32 First Street NECarmel, IN 46032www.wedgewoodbc.comCopyright c 2015 Wedgewood Building Co. LLC.1/31/2019
2:52:14 PM
A11
Sepc Residence75 Westvale @ Jasckson's Grant2ND FLOOR INTERIOR FINISH CDGPS1/4" = 1'-0"1 2ND FLOOR INTERIOR FINISH PLAN Rev.No. Date DescriptionPERM
I
T
S
E
T
Not for
C
o
n
s
t
r
u
c
ti
o
n
02/20/19
William Hohlt