HomeMy WebLinkAboutLENNAR 2 CLAY LAYHTU26HTU26HTU26HTU26HTU26HTU26HTU26GE05T06T06T06GE06M01M01M01M01M01M01M01M02M02M02GE07M03M03M03M03M03M03M03M03M03M04M04M04M04M04M04M04M04M04GE08GE09M05M05M05M08M08M08M08M08M08M08M08M08GE11T06T06T06GE14
TG02GE15T10T10T10T10 T10T10T10T04T04T04T04GE16GE13
T11
T12
T12
T12
T12
T13
T13
GE22
T20
T20
T20
T20
T20
T20
T20
T20
T20
T19
M09M09M09M09M09M10GE12GE17
V15
V16
V17
V18
V19
V20
V21
V31
V32
V33
V34
V35
V36
V30
72-08-0015-04-00 16-00-00 88-00-0022-00-00
30-00-008-00-00 19-04-1213-03-04 18-07-00 27-05-00 6-00-00 3-04-00 88-00-0038-00-00
38-00-00
2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 1-10-08
2-00-002-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 IRC2006
TPI2002 20TLL- 10TDL- 10BDL LENNARPENNINGTONB 2CLAY1/4"=1'2/7/19DJR B19900354CUSTOMER:LOCATION:MODEL:JOB#:
DATE:DESIGNER:DESIGNINFORMATION: SCALE:9028OldSR67South
Mooresville,IN46158
(317)834-5380
Truss Placement Guide
1) This layout is intended for the purpose of truss location
and placement only. Refer to the building plans for actual
building construction.
2) All dimensions shown 00-00-00 are in feet-inches-sixteenths.
3) Trusses are spaced 24" on center unless otherwise noted.
4) Do not cut or modify trusses.
5) Refer to the individual truss design drawings for the location
of member bracing, uplift and truss end reactions.
6) Installation of all temporary and permanent bracing is
essential. See truss drawings, BCSI-B2 Summary Sheet
and building designer requirements.
02/26/19
Mike Sheeks