Loading...
HomeMy WebLinkAboutB1990044711-09-08TOP 10-01-02TOP BearingHGUS26-2 HGUS26-2 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 Stick frame Stick frame Stick frame 2x4 ledger 2x4ledger 2x4ledger 2x4ledger 2x4 ledger TG01T01TG02TG03 TG04T03T04T05TG06 T08 T09 T12 T16 GE01TG07CG01 CG02CG03CG03M02 J01 J02 J03 J04 M03 T19 T20 T21 J05 J06 J07 J08 T19 T20 T21 J03J04J07J08J01J02J05J06CG0 4 CG04J09 J11 J12J13 TG08T22CG05CG05J15 J17J17 J15 TG09 T23 T24 T25CG06 CG06J18J19J20J21J20 J21 J19 J18 V05 V06 V07 V14V15V16V17V18V19V20 V21V22V01V02V03V04V08V09V10V11V12PB01 PB02PB05 T02(2)T10(3) T14(3) T15(2) M01(12 ) T18(3)M03(3)J16(3)PB03(16)M04(6)J10(5)J10(4)AT01(3)T12(2)T06(3) PB04(2)T13(3)12-08-0022-04-00 5-08-00 4-08-00 18-04-00 10-04-00 27-00-006-08-00 45-00-00 17-00-00 27-08-00 13-00-00 3-08-00 12-08-0013-00-00 18-00-00 21-08-00 26-00-00 11-00-007-04-00 16-10-12 27-10-08 12-10-12 IRC2003TPI2002 ®¯TLL- °¯TDL- °¯BDLHomesbyMcKenzie Langham/AlexanderResidence 284Westvale 1/4"=1'February14,2019 PH B19900447CUSTOMER:LOCATION:MODEL:JOB#: DATE:DESIGNER: DESIGNINFORMATION: SCALE:9028OldSR67South Mooresville,IN46158 (317)834-5380Truss Placement Guide 1) This layout is intended for the purpose of truss location and placement only. Refer to the building plans for actual building construction. 2) All dimensions shown 00-00-00 are in feet-inches-sixteenths. 3) Trusses are spaced 24" on center unless otherwise noted. 4) Do not cut or modify trusses. 5)Refertotheindividualtrussdesigndrawingsforthelocation of member bracing, uplift and truss end reactions. 6) Installation of all temporary and permanent bracing is essential. See truss drawings, BCSI-B2 Summary Sheet and building designer requirements. 7) Non-bearing walls may not be shown on layout. Left end of truss, as shown on engineering drawing, is indicated by the triangle symbol 03/04/19 Adam Schriner