Loading...
HomeMy WebLinkAboutGN - Morris Sewer Permit10701 N. College Avenue Suite A Indianapolis, Indiana 46280 phone 317-844-9200 fax 317-844-9203 www.trico.eco Residential SANITARY SEWER PERMIT 999912590 Permit Type Final Subdivision Sunrise on the Morton Project WO ENG122015 Section Number Project Name Sunrise on the Monon Section 1 Lot Number 132 Project Developer Old Town Development L.L.0 Address Number 1465 Lift Station 01 Carmel Creek Station Address 2 Treatment Plant Carmel WWTP Street Sundown Circle Parcel Acreage 0.31 City Indianapolis EDU in Gallons 310 Zip Code 46280 County Hamilton Local Sewer Charge - District Contribution 0.00 Builder Old Town Design Group Plan Review and Inspection 0.00 - - - - --- Application Fee 150.00 Phone Number 317-605-8796 EDU Fee 1908.00 Owner Interceptor Fee _ 0.00 Phone Number Other Fees 0.00 Fees Due 2058.00 Occupant Invoice Number Phone Number PLEASE NOTE: Installation of building sewer shall be per the specifications of the TriCo Regional Sewer Utility (see reverse) and any conditions noted below. All installations shall be inspected by TriCo personnel during "open trench" phase and before backfilling with stone to twelve inches above the pipe. NO footing or foundation drains, or other sources of ground or stormwater, shall be permitted to enter TriCo's sanitary sewer system. TriCo will assume no liability for drains which are below the grade level of the nearest downstream manhole nor for laterals which are extended beneath driveways or sidewalks. The permit holder (property owner, developer or builder) will be responsible for damages to TriCo's sewer system. This includes damages to manholes, castings, manhole lids and the like; caused by construction activity on the building site which is the subject of this permit. Inspections by TriCo are MANDATORY and shall be arranged by contacting TdCo's office at 844-9200 24 hours in advance. All new construction will be placed on billing two months after connection has been made or when water is connected, whichever comes first. The building has: Main ID: SOM5SOM6 Grease Trap Slab Foundation Grease Interceptor Crawl Space Manhole IDs USMH SOM-5 SOM-6 DSMH Grit Interceptor Basement YES Lid Elevation 801.89 801.81 ✓ Grinder Station First Floor Elevation 806.10,1 806.10 ✓, Water Service City of Carmel Basement Elevation 796.1041 796.10 Calculation is based on both Manhole Lid Elevations and the elevation of the First Floor 4.211 4.291 Ft., Per Ordinance 9-13-99 and the elevations provided, the substructure shall be plumbed by: Ejector Pump Only WTriCo currently requires that an I&I inspection is performed and a Certificate of Compliance is issued prior to occupancy / sale of a properrty. Please review attached 1/1 Permit. vWManholes shall remain accessible at all times. Buried manholes will be corrected by the Developer/Owner. 1 P he proper class of cleanout must be installed every 100 feet of lateral Dioe measured from sewer main to structure_ The terms of the conditional permit, if any, are listed below. aEGtoNnt-sf we�G Plans have been submitted. r� All fees have been No certificate of insurance No additional permits required. No manhole core permit required. The facilitv is not classified as a FOG (Notes) By signing below, I attest that I at Builder / Owner Signature Printed Name Approved By to accept responsibility for all work done under this permit. Phone Number WU03t0 p Ryan an,- WsmctEnlrw 02/25/2019 ..................... Permit is valid r O E -YEAR from the date issued. Permit valid only with Tr1Co seal in red ink.