HomeMy WebLinkAboutS002 - 651FAUP 1R / 1S2-2/648" VANITY UNFINISHED MECHANICAL MASTER BEDROOM 2 BEDROOM #3 GAME/ MEDIA BATH 3 SUMP EJECTWH80FURNACEWS R.I.15'-9"x10'-0" 15'-4"x27'-4"MECHANICAL BULKHEADREFR 6'-4" BULKHD W D 2/8-6/8 2/8-6/8 2/8-6/8 2-3068 48" VANITY BATH 4 W.I.C. STORAGE 2/8-6/82/8-6/8 2/8-6/82/8-6/82/8-6/8 3068 CO16R 15T @ 16" O.C.4040 GLIDER 4040 GLIDER 4040 GLIDERSEAT12'-0"x17'-8" 2/8-6/8 PKT. BASEMENT FINISH NOTES: 1. ALL DRYWALL TO BE THICKNESS PER CODE. 2. ALL FLOOR DECK AREAS TO HAVE 1/2" DUROCK UNDERLAYMENT WHERE CERAMIC TILE FLOOR FINISH IS SPECIFIED 3. CERAMIC TILE AREAS (EXCLUDING FLOORS) TO HAVE TILE BACKER BOARD UNLESS NOTED OTHERWISE (U.N.O.)CUSTOMER:PROJECT NAME:LOCATION:DRAWING TITLE: DRAWN BY:WedgewoodBuilding Co., LLC317.669.6300 32 First Street NECarmel, IN 46032www.wedgewoodbc.comCopyright c 2015 Wedgewood Building Co. LLC.12/13/2018 12:14:46 PM A9The Murray Residence651AVE651 1ST AVE NE, CARMEL INBASEMENT FLOOR INTERIOR FINISHSS 1/4" = 1'-0"1 BASEMENT INTERIOR FINISH PLAN Rev.No. Date DescriptionCONDENSER UNIT LOCATION TBD W/ OWNER By Jaclyn Hanson at 12:20 pm, Dec 13, 2018 02/28/19 Mike Sheeks