HomeMy WebLinkAboutA010 - 223JGBCUSTOMER:
PROJECT NAME:LOCATION:DRAWING TITLE: DRAWN BY:Wedgewood
Building Co., LLC
317.669.6300
32 First Street NE
Carmel, IN 46032
www.wedgewoodbc.com
Copyright c 2015 Wedgewood Building Co. LLC. 2/26/2019
9:47:45 AM
A0
The DeFelippis Residence
223JG Defelippis
223 Bridgemont @ Jackson's Grant
COVER SHEET SBSThe DeFelippis Residence
223 Bridgemont @ Jackson's Grant
DRAWING INDEX
Sheet
No. Sheet Name
Current
Revision Revision Date Current Revision Description
A0 COVER SHEET
A1 EXTERIOR ELEVATIONS
A2 EXTERIOR ELEVATIONS
A3 EXTERIOR ELEVATIONS
A4 EXTERIOR ELEVATIONS
S1 FOUNDATION PLAN
A5 LOWER LEVEL FRAMING
A6 MAIN LEVEL ROUGH FRAMING
A7 ROOF PLAN
A8 LOWER LEVEL INTERIOR FINISH
A9 MAIN LEVEL INTERIOR FINISH
ID1 INTERIOR ELEVATIONS AND DETAILS
E1 LOWER LEVEL ELEC. PLAN
E2 MAIN LEVEL ELEC. PLAN
SPANISH TRANSLATIONS
COMMON ELEVATION NOTES = LAS NOTAS DE LAS ELEVACIONES COMUNES
SADDLE ROOF TO EXTEND THE MEASUREMENT = EL TECHO A DOS AGUAS
PARA AMPLIAR
RAKE BOARD = EN EL TECHO, ES EL BORDE QUE TIENE EL INCLINACIÓN EN
LA ÚLTIMA PARED DE LA CASA
EXPOSED AREA AT BOTTOM = LA ZONA DESPROTEGIDA EN EL FINAL
METAL FLASHING CAP = UNA PIEZA DE METAL QUE CUBRE EL BORDE MÁS
ALTO DEL BASE
APPLIED TRIM PILASTERS TYPICALLY AT FRONT ELEVATION CORNERS = LA
PILASTRA QUE ESTÁ TÍPICAMENTE EN LA ESQUINA DEL FRENTE DE LA
ELEVACIÓN
PANEL SIDING = PONER PANELES
SLOPED BRICK ROWLOCK SILL = UN LADRILLO EXTENDIDO EN EL BORDE
TOP BEVELED EDGE AT PILASTER BASES = AL BASE DE LA PILASTRA TIEN E
UN TECHO BISELADO
BRICK VENEER = EL REVESTIMIENTO DEL LADRILLO
BOX BEAM = LA VIGA TUBULAR
HORIZONTAL SIDING = EL REVESTIMIENTO HORIZONTAL
CORNER BOARDS = LOS TABLONES EN LAS ESQUINAS
BRICK SILL = LA REPISA DEL LADRILLO
TRIANGULAR LOUVER = EL LISTÓN TRIANGULAR
FIXED WINDOW = LA VENTANA INAMOVIBLE
EXPOSED AREA AT BOTTOM = LA ZONA DESPROTEGIDA EN EL FINAL
FRONT ELEVATION = LA ELEVACIÓN EN EL FRENTE
PANELED SHUTTERS = LOS POSTIGOS CON PANELES
SHINGLED ROOF RETURN = EL TECHO DE VARIAS TEJAS PARA VOLVER
PORCH SWING = EL COLUMPIO EN EL PORCHE
GARAGE DOOR SIDE TRIM = LA PUERTA AL LADO EN EL GARAJE PARA
CORTAR
GARAGE DOOR HEAD = EL FRENTE DE LA PUERTA EN EL GARAJE
TO TOP OF GUTTER = A LA PARTE MÁS ALTA DE LA CANALETA
TO TOP OF HEADER = A LA PARTE MÁS ALTA DE LA VIGA
HEADER HEIGHT = LA ALTURA DE LA VIGA
TO TOP OF LANDING = A LA PARTE MÁS ALTA DEL DESCANSILLO
BEARING HEIGHT = EL APOYO PARA LA VIGA
ALIGN MEASUREMENT FOR TRIM BOARDS = NIVELA LOS TABLONES QUE
FORTALECEN EL BASE
GARAGE CEILING HEIGHT = LA ALTURA DEL TECHO DENTRO DEL GARAJE
FINISH MAIN LEVEL = TERMINA LA NIVEL PRINCIPAL
TO TOP OF FOUNDATION = A LA PARTE MÁS ALTA DE LOS CIMIENTOS
TO TOP OF PLATE (MAIN) = A LA PARTE MÁS ALTA DE LA HOJA PRINCIPAL
FINISHED UPPER LEVEL = LA NIVEL MÁS ALTA TERMINADA
TO TOP OF PLATE (UPPER) = A LA PARTE MÁS ALTA DE LA HOJA MÁS ALTA
FINISHED BASEMENT LEVEL = LA NIVEL TERMINADA DEL SÓTANO
RIGHT, LEFT, FRONT, REAR ELEVATION = LA ELEVACIÓN A LA DERECHA, A LA
IZQUIERDA, A LA FRENTE, Y DE ATRÁS
COMMON FRAMING NOTES = LAS NOTAS COMUNES DE BORDEAR
DROP TO TOP OF WALL = BAJA A LA PARTE MÁS ALTA DE LA PARED
SLOPE (MEASUREMENT) TO DOOR = NECESITA MEDIR LA
INCLINACIÓN A LA PUERTA
(MEASUREMENT) CONCRETE SLAB OVER (MEASUREMENT)
MINIMUM GRANDULAR FILL = NECESITA MEDIR EL BLOQUE DE
CONCRETO POR ENCIMA DE LA MATERIAL DE PIEDRA ROTA
FOUNDATION PLAN (#) CAR GARAGE OPTION = EL PLAN DE LOS
CIMIENTOS DEL GARAJE PARA LOS COCHES
DROPPED WOOD BEAM = LA VIGA BAJADA
FLUSH WOOD BEAM = LA VIGA NIVELADA
POINT LOAD FROM ABOVE = SEÑALA LA CARGA ARRIBA
SOLID BEARING = EL ÁNGULO SÓLIDO
SLOPED CEILING = EL TECHO BAJADO
SOLID BEARING UNDER POINT LOAD ABOVE = EL ÁNGULO SÓLIDO
DEBAJO DE LA CARGA ARRIBA
BULKHEAD = EL MAMPARO
STUD WALL = LA PARTE VERTICAL DE LA PARED QUE BORDEA
WALL WITH WOOD TOP = LA PARED CON LA CIMA DE MADERA
RETURN AIR = VUELVA EL AIRE
TOP OF BOX BEAM = LA PARTE MÁS ALTA DE LA VIGA TUBULAR
BOX BEAM = LA VIGA TUBULAR
DUCT CHASE = EL CONDUCTO
WOOD BEAM = LA VIGA DE MADERA
ACCENT TILE WALL = EL AZULEJO ESPECIAL PARA LA PARED
VERIFY HEIGHT FOR DUCT CHASE ABOVE WALL IN ATTIC =
VERIFICA LA ALTURA PARA EL CONDUCTO ARRIBA DE LA
PARED EN EL ÁTICO
COORDINATE WALL WITH CABINET LAYOUT = COORDINA LA PARED
CON EL GABINETE
EQUAL FRAME = LA ESTRUCTURA IGUAL
EQUAL FRAME TO OTHER WALL RETURN = LA ESTRUCTURA IGUAL
A OTRA PARED
BEAM FOR SWING = LA VIGA PARA APOYAR EL COLUMPIO
PORCH SWING = EL COLUMPIO PARA EL PORCHE
COMMON ROOF PLAN NOTES = EL PLAN DE REVISAR LAS NOTAS
PARA EL TECHO COMÚN
SADDLE ROOF TO EXTEND 3” BEYOND BRICK = A TECHO A DOS
AGUAS PARA EXTENDER HASTA UN PUNTO DEL LADRILLO
COMMON FINISH PLAN NOTES = LAS NOTAS COMUNES PARA
TERMINAR EL PLAN
RECESSED SLAB = EL BLOQUE RECOVECO
COOKTOP = LA VITROCERÁMICA
OPEN SHELVES BELOW TO LOOK LIKE FURNITURE PIECE = ABRE
LOS ESTANTES DEBAJO DEL ARMARIO PARA PARECERSE COMO
LA PIEZA DE LOS MUEBLES
VOID = EL ESPACIO
TEXTURE WALL = LA PARED DE LA TEXTURA
ZERO THRESHOLD = EL UMBRAL
COMMON DETAIL NOTES = LAS NOTAS DE LOS DETALLES
COMUNES
DRYWALL = EL PANEL DE YESO
TV MOUNTING HEIGHT = LA ALTURA PARA MONTAR LA TELEVISIÓN
TILE JOINT TO BE CENTERED ON FIREPLACE = CENTRA LA JUNTA
DEL AZULEJO EN LA CHIMENEA
TV REFERENCE = LA REFERENCIA PARA LA TELEVISIÓN
TAPER SHOWER BASE TO DRAIN ON CENTER = DISMINUE EL BASE
DE LA DUCHA AL DESAGÜE EN EL CENTRO
SLIDING DOORS = LAS PUERTAS QUE PUEDEN DESLIZAR
GUTTER BOARD = EL TABLÓN PARA EL CANALÓN
TRIM BOARD TO COVER BOTTOM OF BOX BEAM = CORTA EL
TABLÓN PARA CUBRIR EL FINAL DE LA VIGA TUBULAR
HORIZONTAL SLIDING = DE DESLIZAR HORIZONTALMENTE
PANELLED SHUTTERS = LOS POSTIGOS CON PANELES
ALIGN FACES OF TRIM TO PLASTER = NIVELA LOS EXTERIORS DEL
ESPACIO AL REVOQUE
CORBEL = LA MÉNSULA
OVER = POR ENCIMA DE
TOP = LO MÁS ALTO/LA PARTE MÁS ALTA
ALIGN = NIVELA
WIDTH = EL ANCHO
SPACED BETWEEN = PARA CREAR EL ESPACIO ENTRE
THICK = ABUNDANTE
TO TOP OF PLATE (WALL) = A LA PARTE MÁS ALTA DE LA PARED
BEARING HEIGHT = DE SOPORTAR LA ALTURA
CEILING = EL TECHO/ EL CIELO RASO Rev.No. Date DescriptionEXTERIOR FINISHES:
BRICK 2222 SF
SIDING - LAP 1996 SF
SIDING - HARDIE 853 SF
NOTE: SQUARE FOOTAGES ARE APPROXIMATE AND SHALL BE FIELD VERIFIED.
Approved For Construction
Owner Signature: ____________________ Date: _________
Owner Signature: ____________________ Date: _________
Architect Signature: ____________________ Date: _________
Wedgewood Building Co. ,LLC
03/04/19
Mike Sheeks