Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
S002 - 223JGB
11' - 0"5' - 4" 4"16' - 4" 18' - 0" 4" 10' - 4" 14' - 6 1/2" 17' - 4" 18' - 8" 1' - 9" 2' - 4" 7 1/2" 3' - 8" 7' - 3 1/2" 5' - 1 1/2" 16' - 8" 16' - 6" 1' - 6" 15' - 4 1/2" 4"3' - 8" 8' - 4"5' - 4" 3' - 0" 11' - 5" 3' - 1 1/2" 5' - 2 1/2"10' - 0" 8' - 4" 15' - 0" 11' - 4 1/2"7' - 8 1/2" 4' - 3 1/2"MECHANICAL ROOM W.I.C. 2/8‐6/8 2/0‐6/82/6‐6/82/6‐6/8 2/8‐6/8 2/8 x 7/6C/OTOILET CL 1' - 7 1/2" BEDROOM 4 GAME ROOM WET BARMEDIA ROOM BEAM CL16' - 4"SOLID BEARING COLUMN CL 10' - 7 1/2"1' - 8" 16' - 0"16' - 8" 1' - 8" 26' - 0 1/2"3' - 6" DROPPED WOOD BEAM BRG WALL BRG WALLBEAM CL11' - 2 1/2"BEAM CL17' - 5"COLUMN CL 15' - 8" DROPPED STEEL BEAM W12X19 4"W. X 12 1/8" H. X 16'-1" L. UNFINISHED STORAGE DROPPED STEEL BEAM W12X19 4"W. X 12 1/8" H. X 15'-6" L. BEAM DIRECTLY UNDER WALL ABOVE 3 1/2" DIA. ADJUSTABLE STEEL COMUMN 12' - 0 1/2"4' - 3 1/2" 3 1/2"34' - 4 1/2" 4" 2/6‐6/8 BATH 4 MECH BULKHEAD 34 1/2" H. WALL 4" 15' - 4 1/2" BRG WALL BRG WALL 3 1/2" DIA. ADJUSTABLE STEEL COMUMN AREA DRAIN ROCKWELL RETAINING AREA DRAIN 2 1/4" 26" DEEP BULKHEAD UP DROPPED FLOOR FOR ZERO THRESHOLD SHOWER ABOVE16' - 4"4"2/8‐5/0 CO 1' - 4"4" 16' - 6" 1' - 3" 15' - 7 1/2" 3 1/2" 17' - 4" 4' - 0" 3 1/2" 2' - 3 1/2" 5' - 0" 3 1/2" 5' - 1 1/2" 4" 4" 14' - 7" 3 1/2" 3' - 6"3 1/2"10' - 4" 4"3' - 6 1/2"2' - 0" 11' - 10 1/2" 5' - 5 1/2" CXW14 (3/0-4/0) CSW14 (3/0-4/0) CXW14 (3/0-4/0) 7' - 8" 8' - 4" BRICK LINED WINDOW WELL - BOTH SIDES w/ LIMESTONE CAP 4040 GW12' - 0"CUSTOMER: PROJECT NAME:LOCATION:DRAWING TITLE: DRAWN BY:Wedgewood Building Co., LLC 317.669.6300 32 First Street NE Carmel, IN 46032 www.wedgewoodbc.com Copyright c 2015 Wedgewood Building Co. LLC. 2/26/2019 9:48:45 AM A5 The DeFelippis Residence 223JG Defelippis 223 Bridgemont @ Jackson's Grant LOWER LEVEL FRAMING SBS 1/4" = 1'-0"1 1 - LOWER LEVEL ROUGH FRAME PLAN Rev.No. Date DescriptionROUGH FRAMING NOTES: 1. DOORS ARE TO BE 4.5" OFF OF WALL INTERSECTIONS OR CENTERED IN THE WALL U.N.O. 2. REFER TO COVER PAGE FOR SPANISH TRANSLATIONS = REFERIRSE A LA PORTADA DE LAS TRADUCCIONES AL ESPAÑOL. Approved For Construction Owner Signature: ____________________ Date: _________ Owner Signature: ____________________ Date: _________ Architect Signature: ____________________ Date: _________ Wedgewood Building Co. ,LLC 03/04/19 Mike Sheeks