HomeMy WebLinkAboutEDINBURGH D TRUSS LAYOUTTrim OHA1A1AGA1V1
V2
V3
V4
V5
V6
A ( 3 )AT ( 6 )40-00-0023-10-00
2-06-00 8-10-00 2-06-002-06-00 12-02-00 2-06-001-09-042-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-001-03-048-121-11-04
SHOP DRAWING APPROVAL
THIS LAYOUT IS THE SOLE SOURCE FOR FABRICATION OF TRUSSES AND VOIDS ALL PREVIOUS ARCHITECTURAL OR OTHER TRUSS LAYOUTS.
REVIEW AND APPROVAL OF THIS LAYOUT MUST BE RECEIVED BEFORE ANY TRUSSES WILL BE BUILT. VERIFY ALL CONDITIONS TO INSURE AGAINST
CHANGES THAT WILL RESULT IN EXTRA CHARGES TO YOU.
REVIEWED BY:__________________________ APPROVED BY:______________________________ DATE:___________
THIS IS A TRUSS PLACEMENT DIAGRAM ONLY. Thesetrussesaredesignedasindividualbuildingcomponentstobe incorporated
into the building design at the specification of the building designer.Seeindividualdesignsheetsforeachtrussdesignidentified on the
placement drawing. The building designer is responsible for temporary and permanent bracing of the roof and floor system and for the
overallstructure.Thedesignofthetrusssupportstructureincluding headers, beams, walls, and columns is the responsibility of the
building designer. For general guidance regarding bracing, consult"BracingofWoodTrusses"availablefromtheTrussPlateInstitute,
583D'OnifrioDrive;Madison,WI53179.
Floor Area: 0
Roof Area: 1176.73
Hip Lines: 0
Horizontal OH: 31
Rake OH: 116.81
Valley Lines: 36.21
Ridge Lines: 38.68
2702NorthTibbsAvenue
Indianapolis, Indiana 46222
Sales Rep:
Subdivision:
Order #:
Job Name:
5/29/2018
Designer: Date:
Model:
Client:
Lot #:
EDINBURGH D
03/06/19
Mike Sheeks