Loading...
HomeMy WebLinkAboutBuilding Permit P2RE: DRAINAGE SWALES All required drainage swales must be shown on the plot plan and constructed in all subdivisions prior to the Department of Comnunity Development performing a final inspection of any struCtu CARMEL/CLAY DEPARTMENT OF 0062AMITY DEVELQPtflM per plans on file or per the following: Constructed swales shall be a minimum of 1'6" deep with side slope BUILDING PERMIT of not less than 4 to 1. REQUIRED PIDT PLAN INFORMATION The below listed information must be included on all site or plot, plans which are to be submitted to the Carmel/Clay Department of Conulunity Development as a part of the Building Permit review process. If limited, pertinent information is desired from the Department of Community Development, a five (5) day waiting period MAY be required in order to search files for the desired information. The below REQUIRED information can be secured from the landowner or land developer: Lot drawn to scale All dimensions Scale and North arrow All roads, alleys, etc., right-of-way All other utility and drainage right-of-way and easements Any applicable flood plain area Building pad elevation and lot corner elevations 1 All accessory buildings -- existing or proposed All sidewalks and driveways Sewer and water lines, septic system and well location Drainage flow arrows All drainage swales and facilities (retention/detention areas etc.) Dimensional cross sections of all drainage swales All subsurface drainage facilities I certify that all of the above listed information is shown completely and accurately on the attadhed plot or site plan as submitted with a building permit application to the Cannel/Clay Department of Community Development SIGNATURE: ADDRESS: PHONE: NAME OF PLUMBING CONTRACTOR: (-�o�.. ,_ .1,_,._ IV1��!,�-,,.(� _U VALID STATE LICENSE NUMBER: