HomeMy WebLinkAboutA122.BREFLECTED CEILING PLAN LEGEND
A. ALL CEILINGS TO BE ACT-1 U.N.O.
B. ALL ACT CEILINGS TO BE 94" A.FF USING 15116"WHITE METAL TEE GRID. U.N.O.
C. PROVIDE 3-11TSOIND BATTS OVER CEILING IN ENTIRE ROOM AND 24" BEYOND OUTSIDE WALL AT ALL
TOILETS AND CONFERENCE ROOMS WITH SOUND RATED WALLS.
D. ALL GYPSUM BOARD CEILINGS TO BEB'-TA.F.F. UNLESS NOTED OTHERWISE.
E. GYPSUM BOARD CONTROL JOINTS:
a. PROVIDE AT INTERIOR CBUNGS(WITH PERIMETER RELIEF)OVER 50-0'IN LENGTH IN ANY DIRECTION.
TOTAL AREA BETWEEN CONTROL JOINTS SHALL NOT EXCEED 2500 SOFT.
b. PROVIDE AT INTERIOR CEILINGS (WITHOUT PERIMETER RELIEF)OVER 39-0" IN LENGTH IN ANY DIRECTION.
TOTAL AREA BETWEEN CONTROL JOINTS SHALL NOT EXCEED 900 SOFT.
c PROVIDE AT EXTERIOR CEILINGS AND SOFFITS OVER 30'-TIN LENGTH IN ANY DIRECTION. TOTAL AREA
BETWEEN CONTROL JOINTS SHALL NOT EXCEED 9DD SOFT.
d. COORDINATE LOCATIONS WITH ARCHITECTURAL ELEMENTS ANDIOR AT THE DIRECTION OF THE
ARCHITECT.
F. REFERENCE INTERIOR ELEVATIONS FOR GYPSUM BOARD SOFFITS ABOVE CABINETS.
G. SEE INTERIOR ELEVATION AND/OR SECTIONS FOR MOUNTING HEIGHTS OF ANY WALL MOUNTED LIGHT
FIXTURES.
H. PROVIDE NEW CEILING TILES AS NEEDED IF REUSED TILES ARE NOT IN ENOUGH QUANTITY TO MEET DE SIGN.
® 2k4'SUSPENDED ACOUSTICAL CEILING
® 2k4' SUSPENDED ACOUSTICAL CEILING. HATCH DENOTES
PORTIONS WITH NEW GRID AND SUSPENSION SYSTEM
GYPSUM BOARD CEILING
CEILING TYPE
8'A0"Y 1 CEILING IDENTIFICATION
-
FINISH HEIGHT fAFFI
CEII
ACT-1 -
GYP-1-
eB.7
1 / A122.A
KEYED REF. CEILING PLAN NOTES (NOTED WITH (D)
1 NOTUSED
B 2 GYPSUM BOARD BULKHEAD -SEE SERIES MOO SHEETS
!C 3 AREA OF NEW CEIING GRID INFILL AND REINSTALLED CEILING TILES.
CONTRACTOR TO COORDINATE CONNECTION TO EXISTING CEILING
GRID AS REQUIRED FOR UNIFORM CEILING HEIGHTAND
A D APPEARANCE. PROVIDE 20% CONTINGENCY TO CLEAN, REPAIR AND
PAINT EXISTING GRID WHERE DAMAGED
4 AREA OF NEW CEILING TILES WITH NEW CEILING GRID.
CONTRACTOR TO COORDINATE CONNECTION BETWEEN NEW AND
EXISTING CEILING GRID; SPLICE AND REHANG CEILING AS REQUIRE
FOR A UNIFORM HEIGHT AND APPEARANCE. PROVIDE20%
CONTINGENCY TO CLEAN, REPAIR AND PAINT EXISTING GRID WHERE
DAMAGED
N 5 EXISTING CEILING TO REMAIN, PATCH AND REPAIR AS NEEDED -
KEY PLAN PAINT PER FINISH PLANS IF NEEDED
12"= 1' D" 6 ALIGN FACE OF BULKHEAD TOADJACENT WALL
U N)�
¢)a
Y. 1 eB I I eC 1 eE eG CeH� e1. eJ 1 eK (el- ' I
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Cannel
rkT
SECOND FLOOR REFLECTED CEILING PLAN - AREA B
OAMERICAN
M■ STRUCTUREPOINT
INC
III
7260 smeelane srman I Imlanapore, Indiana M256
TEL 317.M7.MM I RUX317.393.0270
wwaviann mmomaxam
GEICO CORPORATE
SECOND FLOOR
RENOVATION
101 W. 103RD ST.
INDIANAPOLIS, IN 46290
`JPWUI°Igry�
No.
AR10900003
CERTIFIED BY
ISSUANCE INDEX
DATE:
11/21/18
PROJECT PHASE:
CONSTRUCTION DOCUMENTS
REVISION SCHEDULE
NO. I DESCRIPTION I DATE
Project Number 2017.01381
SECOND FLOOR
REFLECTED CEILING
PLAN - AREA B
DATE: 03/15/19
1/8" = V-0"
NOTES:
1. REFERT0I9"SCALESHEETSFORPLANKEYNOTES.
2. AREAS SHOWN IN GRAY ARE EXISTING TO REMAIN.
A122.B