HomeMy WebLinkAboutD102.Ai
IL
ADB
KEY PLAN
12' = 1'-0'
KEYED DEMO PLAN NOTES (NOTED WITH0)
1
REMOVE WALL CONSTRUCTION IN ITS ENTIRETY. PRIOR TO
14
EXISTING GYPSUM BOARD COLUMN SURROUND TO BE REMOVED AND
DEMOLITION, CAREFULLY INVESTIGATE CONCEALED CONDITIONS TO
REINSTALLED AS PART OF NEW WORK. ADJACENT CONSTRUCTION
VERIFY THERE IS NOACTIVE INFRASTRUCTURE. WHERE WALL TO BE
THAT IS BEING DEMOLISHED SHOULD BE CAREFULLY REMOVED TO
DEMOLISHED STOPS SHORT OF CEILING, CAREFULLY REMOVE WALL
MINIMIZE REPAIR AND PATCHING. REMOVE AND RETAIN FIRE
CONSTRUCTION TO MINIMIZE CEILING GRID REPAIR UNLESS NOTED
EXTINGUISHER CABINET HOUSINGS WHERE THEY EXIST. RETAIN
OTHERWISE
EXISTING FIRE EXTINGUISHERS FOR RE -USE
2
REMOVE AND SALVAGE ALUMINUM STOREFRONT FOR FUTURE REUSE-
15
WHERE DEMOLISHED WALL CONSTRUCTION INTERSECTS EXTERIOR
TURN OVER TO OWNER
WINDOW MULLION, REFER TO DETAIL 2/D102.A
3
ALL ABANDONED OR UNECESSARY FIXTURES, OUTLETS OR
16
REMOVE AND SALVAGE DOOR, FRAME AND HARDWARE FOR
REMOVE WALL CONSTRUCTION
COVERPLATES TO BE REMOVED. MEP TRADES TO REMOVE/CAP ITEMS
REINSTALLATION
FLUSH WITH EXISTING BULKHEAD
AS REQUIRED SO THEY ARE FULLY CONCEALED BY NEW
,T
REMOVE PORTION OF WALL FOR STOREFRONT INSTALL
CONSTRUCTION/FINISHES. EXPOSED COVERPLATES OR CAPS ARE
18
DEMOLISH ALL CEILING GRIDS AND SALVAGE UNDAMAGED CEILING
NOT ACCEPTABLE UNLESS SPECIFICALLY APPROVED BY PROJECT
TILES FOR REUSE. SEE NEW WORK PLANS FOR NEW LAYOUT
TEAM. THIS NOTE IS TYPICAL, THROUGHOUT ENTIRE SECOND FLOOR
19
NOTUSED
4
REMOVE DOOR AND/OR GLAZING INCLUDING FRAME AND HARDWARE.
CAREFULLY REMOVE WALL
TURN HARDWARE OVER TO OWNER
20
REMOVE AND SALVAGE FIRE EXTINGUISHER IN ENTIRETY FOR REUSE
CONSTRUCTION FLUSHTO
IN NEW CONSTRUCTION
EXISTING MULLION. REPAIR
5
REMOVE CEILING TILE, GRID AND SUSPENSION SYSTEM IN IT
21
REMOVE PORTION OF WALL TO DIMENSION INDICATED
MULLION AS REQUIRED
ENTIRETY. RE -SUPPORT EMAINING ADJACCONSTRNT GRID AS
REQUIRED. COORDINATE WITH NEW CONSTRUCTION
UCTION
22
REMOVE AND SALVAGE ALUMINUM STOREFRONT FOR REUSE IN NEW
6
REMOVE AND SALVAGE ALL UNDAMAGED CARPET AND/OR VCT FOR
HUDDLE ROOM
CAREFULLY REMOVE WALL
REINSTALL. REMOVE ADHESIVE
23
REMOVE AND SALVAGE ALUMINUM STOREFRONT FOR REUSE IN NEW
CONSTRUCTION FLUSHTO EXISTING
T
REMOVE EXISTING GYPSUM BOARD BULKHEAD IN ENTIRETY
ELEVATOR LOBBY
METAL WINDOW SILL AND STUD/GYP
8
EXISTING RESTROOMS TO REMAIN
24
REMOVE CARPET AND/OR VCT. REMOVE ADHESIVE
KNEEWALL REFERTOVA101.CFOR
9
REMOVE EXISTING WALL CONSTRUCTION AS REQUIRED FOR NEW
REPAIR.
DOOR ROUGH OPENING
10
EXISTING CHASE TO REMAIN
11
EXISTING CONFERENCE ROOM TO REMAIN
12
EXISTING MEP ROOMS TO REMAIN
13
EXISTING WINDOWS, METAL SILL, KNEE WALL, BULKHEAD AND BLINDS
TOREMAIN. PROTECT AS REQUIRED
TYPICAL DEMO AT INTERSECTING WALL/WINDOW MULLION
12" = V-0"
I
I
I
I�
Is
1 I D102.8 I
-- —— -----------------------------------------------r-----------r-----------r-----------r-----------r-----------r-----------r-----------r-----7----
f161 1141 i14, f161 1141 1141 1141 11161 �141 ii6I
I
�� p Czo1II�'e II ��% L1 �I l's 1 13'-10114' (21,11 :2l; II
II II II II �� •1 II (16♦�{L� �� II 8I� PER NEW WORK PLANS II II
II Ij i,'1 II LL'� 21' II III
II II II ♦ J_JI 13 1 _ rL------ I II 31 II
II II 31 II 6 I �' 1 1��r -I II A II
lk 3.1 �I 6 1 a II o II ;6 III
II 3 1 II� 6 � � ! / 6 �II�;6;�1� @ i 31 II II I
�____ III—�--_— �.e, II III
II �s' Ir I
l3 II �.��� I16 Ir 3l I III
I�'s� II
L_—IL
Ir- = = =. �=Jr— T 1 ♦ I
4 u II , I u 6 -
II II 1I II i 3 1 II , �I i 31
II II (al II II ��'e II - II s' �161
II II� s� II II �II 1131 II -� 0 ®®®® II III
I II II II II II — — I
rr
I� i j II II II II-'� IP-�zo1 ial III j�is� IIT~�,,' II III
O T nLam—L '----- �ur ♦—�---i-- ` F11I+ - '� t--u -- —La fi_: '; III — TII I
ll
(,l JIILrI -------------------J1IynI
----------- 14
r's
i,41�'s��6 Ia: 14,3L?6
eI 16
(z,�—
e4 — — — — —
IRS
e3.2
e3 `—
Q
%2
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Carried
A\;,YG1
a1
�\8
00
♦ T � I— — II L II — III
— — --_� ,'ir=== ,'ir��=� ♦'ir=� � ♦`Il II _I_=_=�1 p _ — — — — — — I � — II
�'i6� II II II II II 3i II II 211
11��I IL 1��I II lllt'6 11 II i 31 II II
1 (�`, _ II - _ II „1 _ II -' II II 1 1 � •_''� I 1 3 1 _� I II
8
�s� I 16� t161 ) sl II II II II
T I R 1I II II II
�io 32'-9112°���'_�—�II,II II II Vi3 III
i12 REF. NEW WORK PLANE 20Ir------I - II II Y`8�1� III
1231 II I
I \ II
p, 1 31 T I II II
I Ir_- I 11
2 ,a- e1 14rI II vOr
(-
�-� � ------- \�___---T—�j 1
11 (zoo (161 6I (14) ---
Ir--n�-- --1- --- --- I —
u
rsl II isj
\i;6;� L---- --� \\
i31 \\
�9113 6 — _1 ��6 II
24 1/ 2 T
/ zit
141
1 M
1 i31 � I
1 1
[11 12 I
1 31
// ,
t161 11
14 / i5u131 14) I
13 I
I
eD eE eH ! el ! eJ %Ki t, eL o
_ I s
I
N
i11 SECOND FLOOR DEMOLITION PLAN -AREA A NOTES.
1. REFERTO19'SCALESHEETSFORPLANKEYNOTES.
1!2 1/8' = 1'-0' 2. AREAS SHOWN IN GRAY ARE EXISTING TO REMAIN.
OAMERICAN
M■
STRUCTUREPOINT
INC
7260 smeelane Srman I imianamiu, Indiana M236
TEL 317.M7.MM I RX311F.393.0270
www.momamnnim.cum
GEICO CORPORATE
SECOND FLOOR
RENOVATION
101 W. 103RD ST.
INDIANAPOLIS, IN 46290
`J�P�Up�pingnl
AR10900003
CERTIFIED BY
ISSUANCEINDEX
DATE:
11/21/18
PROJECT PHASE:
CONSTRUCTION DOCUMENTS
REVISION SCHEDULE
NO. I DESCRIPTION I DATE
Project Number 2017.01381
SECOND FLOOR
DEMOLITION PLAN -
AREA A
D1020A
DATE: 03/15/19