Loading...
HomeMy WebLinkAboutD102.Di IL RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Carmel 1 / D1n2B e4.2' — CE2 �M> IeN mil SECOND FLOOR DEMOLITION PLAN - AREA D KEYED DEMO PLAN NOTES (NOTED WITH O) 1 REMOVE WALL CONSTRUCTION IN ITS ENTIRETY. PRIOR TO DEMOLITION, CAREFULLY INVESTIGATE CONCEALED CONDITIONS TO VERIFY THERE IS NO ACTIVE INFRASTRUCTURE. WHERE WALL TO BE DEMOLISHED STOPS SHORT OF CEILING, CAREFULLY REMOVE WALL CONSTRUCTION TO MINIMIZE CEILING GRID REPAIR UNLESS NOTED OTHERWISE 2 REMOVE AND SALVAGE ALUMINUM STOREFRONT FOR FUTURE REUSE TURN OVER TO OWNER 3 ALL ABANDONED OR UNECESSARY FIXTURES, OUTLETS OR COVERPLATES TO BE REMOVED. MEP TRADES TO REMOVE/CAP ITEMS AS REQUIRED SO THEY ARE FULLY CONCEALED BY NEW CONSTRUCTIOWFINISHES. EXPOSED COVERPLATES OR CAPS ARE NOT ACCEPTABLE UNLESS SPECIFICALLY APPROVED BY PROJECT TEAM. THIS NOTE IS TYPICAL, THROUGHOUT ENTIRE SECOND FLOOR 4 REMOVE DOOR AND/OR GLAZING INCLUDING FRAME AND HARDWARE. TURN HARDWARE OVER TO OWNER 5 REMOVE CEILING TILE, GRID AND SUSPENSION SYSTEM IN ITS ENTIRETY. RE -SUPPORT REMAINING ADJACENT CEILING GRID AS REQUIRED. COORDINATE WITH NEW CONSTRUCTION 6 REMOVE AND SALVAGE ALL UNDAMAGED CARPET AND/OR VCT FOR REINSTALL. REMOVE ADHESIVE T REMOVE EXISTING GYPSUM BOARD BULKHEAD IN ENTIRETY 8 EXISTING RESTROOMS TO REMAIN 9 REMOVE EXISTING WALL CONSTRUCTION AS REQUIRED FOR NEW DOOR ROUGH OPENING 10 EXISTING CHASE TO REMAIN 11 EXISTING CONFERENCE ROOM TO REMAIN 12 EXISTING MEP ROOMS TO REMAIN 13 EXISTING WINDOWS, METAL SILL, KNEE WALL, BULKHEAD AND BLINDS TO REMAIN. PROTECT AS REQUIRED eS 17 ieT� 1 / D102C 14 EXISTING GYPSUM BOARD COLUMN SURROUND TO BE REMOVED AND REINSTALLED AS PART OF NEW WORK. ADJACENT CONSTRUCTION THAT IS BEING DEMOLISHED SHOULD BE CAREFULLY REMOVED TO MINIMIZE REPAIR AND PATCHING. REMOVE AND RETAIN FIRE EXTINGUISHER CABINET HOUSINGS WHERE THEY EXIST. RETAIN EXISTING FIRE EXTINGUISHERS FOR RE -USE 15 WHERE DEMOLISHED WALL CONSTRUCTION INTERSECTS EXTERIOR WINDOW MULLION, REFER TO DETAIL 2/D102.A 16 REMOVEAND SALVAGE DOOR, FRAMEAND HARDWARE FOR REINSTALLATION 17 REMOVE PORTION OF WALL FOR STOREFRONT INSTALL 18 DEMOLISH ALL CEILING GRIDS AND SALVAGE UNDAMAGED CEILING TILES FOR REUSE. SEE NEW WORK PLANS FOR NEW LAYOUT 19 NOT USED 20 REMOVE AND SALVAGE FIRE EXTINGUISHER IN ENTIRETY FOR REUSE IN NEW CONSTRUCTION 21 REMOVE PORTION OF WALL TO DIMENSION INDICATED 22 REMOVE AND SALVAGE ALUMINUM STOREFRONT FOR REUSE IN NEW HUDDLE ROOM 23 REMOVE AND SALVAGE ALUMINUM STOREFRONT FOR REUSE IN NEW ELEVATOR LOBBY 24 REMOVE CARPET AND/OR VCT. REMOVE ADHESIVE B G' KEY PLAN 2" = V-0" NOTES: 1. REFER T01IT SCALE SHEETS FOR PLAR KEYNOTES. 2. AREAS SHOWN IN GRAY ARE EXISTING TO REMAIN. n OAMERICAN M■ STRUCTUREPOINT INC 72605MpalanE Shtian I IMianapolle, Indiana M256 TEL 317.M7.MM I RUX317.593.0270 www.wmarmmoma.aam GEICO CORPORATE SECOND FLOOR RENOVATION 101 W. 103RD ST. INDIANAPOLIS, IN 46290 `JPUpu n,gllj/ No. AR10900003 CERTIFIED BY ISSUANCE INDEX DATE: 11/21/18 PROJECT PHASE: CONSTRUCTION DOCUMENTS REVISION SCHEDULE ENO. DESCRIPTION I DATE Project Number 2017.01381 SECOND FLOOR DEMOLITION PLAN - AREA D D102.D DATE: 03/15/19