Loading...
HomeMy WebLinkAboutE502.BA A. e6 B. eC eD eE eF eG eH el eJ eK O ❑ O ❑ O BREAK DOOM 216 BPEAKROOM .b. . O O O 218 EX 5TAR B P. PEW N.OPEN OFFCE OR SHEET GENERAL NOTES: A. REFER TO SHEET E000 FOR ELECTRICAL SYMBOLS, ABBREVIATIONS AND NOTES. B. EXISTING FIRE ALARM SYSTEM LOCATED ON FIRST FLOOR IN ROOM BEHIND MAIN CHECK -IN DESK. EXTEND EXISTING SYSTEM AS REQUIRED FOR INSTALLATION OF NEW FIRE ALARM DEVICES. 9. eL EX STAR 1 S3 R001� ❑ �- — — — T — — — — - MENS EI£C. 6 EX EL CONFFPBIC c ® TELECOM. n E4 255 217 EL LOBBY ®®® HALL E 8 CIE IX. EL. a ° E5 STOP C CALIBRATION21 210 WOMB6 SD STOP 213 . — r�� 'JTI-I - e8 O UPS SATISFY 223 SALES UIP220 �(0 a RI HUDDLE 224 RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Cannel DATE: 03/15/19 " ------------- ---- MOTHERSQM 1i > 22e 1 S.OPENOFHCE ED LourcE a sI rc � 1 COMPUTER zn RI RI ❑ RI MMCEJR 1 !�7 O N. OPEN OFFICE 201 OAMERICAN M■ STRUCTUREPOINT INC 7260 SMammna Suman I IMimapolin, Indiana M256 TEL 317.M7.MM I IRM317.342l www.mumuread im.mn r u 8900 KEYSTONE XING PH: 317.848.5045 SUITE 210 FAX 317.844.2201 INDIANAPOLIS, IN www.imegeorp.com 46240 GEICO CORPORATE SECOND FLOOR RENOVATION 101 W. 103RD ST. INDIANAPOLIS, IN 46290 ORIGINAL DRAWING STAMPEDAND SIGNED BY DARYL R. HUMBLE STATE OF INDIANA REGISTERED No. PE 11300248 ON 11.21.18 CERTIFIED BY ISSUANCEINDEX DATE: 11/21/18 PROJECT PHASE: CONSTRUCTION DOCUMENTS REVISION SCHEDULE NO. I DESCRIPTION I DATE Project Number 18002480.00 SECOND FLOOR SYSTEMS PLAN - AREA B E5020B