Loading...
HomeMy WebLinkAboutA102.BKEYED FLOOR PLAN NOTES (NOTED WITH 1) ) B C A D N KEY PLAN 12' = V.0' EX. EL. Ed EX. EL. E3 1 INSTALL EXISTING STOREFRONT, DOOR AND HARDWARE FROM AREA D - REF. DEMOLITION PLANS 2 AT EXISTING GYPSUM BOARD WALLS, PATCH/INFILL AND REPAIR AS REQUIRED FROM DEMOLITION. FIELD VERIFY FOR DESIGN INTENT. ALL ABANDONED OUTLETS AND FIRE EXTINGUISHER CABINET CAVITIES TO BE REPLACED BY DRYWALL FOR LIKE -NEW FINISH APPEARANCE 3 FIRE EXTINGUISHER. RE -USE SALVAGED FIRE EXTINGUISHERS FROM DEMOLITION PHASE 4 ALIGN NEW CONSTRUCTION CENTERED AND/OR FLUSH WITH EXISTING GEOMETRY. AT FLUSH CONDITIONS W/ DRYWALL, PATCH AND REPAIR AS REQUIRED FOR SEAMLESS TRANSITION 5 AT EXISTING GYPSUM BOARD COLUMN SURROUND, PATCH/INFILL AND REPAIR AS REQUIRED FROM DEMOLITION. FIELD VERIFY FOR DESIGN INTENT. ALL ABANDONED OUTLETS AND FIRE EXTINGUISHER CABINET CAVITIIES TO BE REPLACED BY DRYWALL FOR LIKE -NEW FINISH APPEARANCE 6 WHERE NEW WALL MEETS EXISTING WINDOW MULLION, PROVIDE (2) Z X T CONTINUOUS 16 GA. CLEAR ANODIZED ALUMINUM ANGLES FROM SILL TO CEILING. 7 CASEWORK/COUNTERTOP- REFER TO A400 SHEETS 8 REPAIR EXISTING CONSTRUCTION WHERE INTERSECTING WALL WAS DEMOLISHED AT EXTERIOR WINDOW - PER DETAIL 2/102.A 9 REINSTALL STOREFRONT, DOOR AND HARDWARE FROM ADJACENT LOBBYAREA. HARDWARE TO B ELECTRIFIED AND INSTALLED IN SAME MANNER AS EXISTING 10 REINSTALL EXISTING DOOR AT THIS LOCATION. REINSTALL HARDWARE AS APPLICABLE. IF NEW HARDWARE IS REQUIRED, PER DOOR HARDWARE SPECIFICATION 11 BULKHEAD ABOVE- PER REFLECTED CEILING PLANS 12 NEW DOOR OPENING IN EXISTING WALL, FIELD VERIFYAND COORDINATE WITH DOOR SCHEDULE 13 PROTECT EXISTING WINDOW, METAL WINDOW SILL, BULKHEAD AND WINDOW BLINDS DURING CONSTRUCTION. CAULK EXISTING METAL SILL PER DETAIL 2/A102.A. REPAIR EXISTING WINDOWSILLS AS NEEDED I 1 In Ia I` 0 0 ® ® o BREAK 4 2 212 EX STAIR I S ,011 A3 MENS A3 LL 216 ELF2_111 CONFERENCE 211 255 15 -0 SIB WOMENS 213 m ❑ ELEC. 21fi U� J � w 1\ ALL 215 I 210 4 1 EX. EL. I LEE STOP 22 1 N. OPEN I OFFICE F2_011 CALIBRATION 2 00 I I A3 ff ETOR. 221 I ❑o ❑o I A3 a I „ 72 z m I 0 I UPS 7 MOTHERS' BATTERY 223 ROOM 228B LOUNG 3 I 22 iC A3 I A3 o - 6'-4112" B'-86I8" I 14'-101/2" QCOMPUTER 1 225 I A3 229 10 I SALES DIR. m m _ HUDDLE , 229 I ❑ C ❑❑ C Ell ❑❑ ❑❑ 220 - ❑0 A3 ❑ I 10 A3 220 I COONF. 230 10 I I HUDDLE 1 226 it SERVICE DIR. I 230 I z I I 4 A3 I I 1 I A102A SECOND FLOOR PLAN - AREA B I' RELEASED FOR CONSTRUCTION �� 02B 1/8"=V-0" n OAMERICAN M■ STRUCTUREPOINT INC III 7260 sMpnlana ehtian I IMlanapolle, Indiana M236 TEL 317.M7.MM I MA317.393.0270 www.wnnummoim.nom GEICO CORPORATE SECOND FLOOR RENOVATION 101 W. 103RD ST. INDIANAPOLIS, IN 46290 `JPU111IIIIIIIIA/', No. AR10900003 CERTIFIED BY ISSUANCE INDEX DATE: 11/21/18 PROJECT PHASE: CONSTRUCTION DOCUMENTS REVISION SCHEDULE NO. DESCRIPTION DATE 1 PRO13 01/31/2019 Project Number 2017.01381 SECOND FLOOR PLAN - AREA B Subject to compliance with all regulations of State and Local Codes City of Cannel DATE: 03/15/19 NOTES: 1. REFERT0IB"SCPLESHEETSFORPLPNKEYNOTES. 2. AREAS SHOWN IN GRAY ARE EXISTING TO REMAIN. A102.B