Loading...
HomeMy WebLinkAbout19030052 ApplicationCCIITTYY OOFF CCAARRMMEELL CCOOMMMMEERRCCIIAALL // IINNSSTTIITTUUTTIIOONNAALL // MMUULLTTII--FFAAMMIILLYY PPEERRMMIITT AAPPPPLLIICCAATTIIOONN Please complete form and email to permits@carmel.in.gov as an attachment. If you have any questions, please call Building & Code Services at (317) 571-2444. BUILDER OF RECORD NAME PHONE ADDRESS CITY STATE ZIP E-MAIL ADDRESS BEST METHOD OF CONTACT ࡕࡕ PHONE ࡕࡕ E-MAIL PLUMBING CONTRACTOR NAME STATE OF INDIANA LICENSE NUMBER PROPERTY OWNER NAME PHONE ADDRESS CITY STATE ZIP PROJECT LOCATION PARCEL NUMBER ADDRESS (INCLUDING SUITE NUMBER) CITY STATE ZIP TYPE OF STRUCTURE ࡕ ࡕ COMMERCIAL ࡕࡕ INSTITUTIONAL ࡕࡕ MULTI-FAMILY NUMBER OF UNITS:______________ PROJECT DETAILS NAME OR DESCRIPTION OF PROJECT ࡕࡕ NEW STRUCTURE ࡕࡕ TENANT FINISH ࡕࡕ REMODEL ࡕࡕ ACCESSORY BUILDING ࡕࡕ CELL TOWER ࡕࡕ ADDITION ࡕࡕ Room ࡕࡕ Porch ࡕࡕ Deck ࡕࡕ GARAGE ࡕࡕ Attached ࡕࡕ Detached COST OF CONSTRUCTION (EXCLUDING LAND) $ SQUARE FOOTAGE STATE OF INDIANA CDR PROJECT NUMBER RELEASE DATE CONSTRUCTION TYPE OCCUPANCY CLASSIFICATION SCOPE OF RELEASE ࡕࡕ FDN ࡕࡕ STR ࡕࡕ ARCH ࡕࡕ ELEC ࡕࡕ MECH ࡕࡕ PLUM ࡕࡕ SPKLR ࡕࡕ HOOD ࡕࡕ OTHER ________________________ ADVANCED STRUCTURAL COMPONENTS REPORTING This section is required in order to comply with the requirements of IC 22-11-21 (Public Law 104, 2018) as it relates to the use of Advanced Structural Components (lightweight I-joists or lightweight roof trusses) in Class I and Class II Construction that: 1. Have less mass cross-sectional area than sawn lumber of equivalent proportions used in an equivalent application; and 2. Are assembled from combustible or noncombustible materials, or both *This does not include a structural assembly, joist or truss that provides at least 1 hour of fire resistance under ASTM E119* Does this project include any Advanced Structural Components? ࡕࡕ Yes (Section Below Required) ࡕࡕ No Type of Advanced Structural Component (Select all that apply) Location(s) in Structure ࡕࡕ Lightweight I-Joists ࡕࡕ Lightweight Roof Trusses OFFICE USE ONLY PERMIT #____________ Class I structure permits are subject to the State of Indiana General Administrative Rules (GAR 675 IAC 12) regarding expiration time frames for beginning and completing construction. I, the undersigned, agree that any construction, reconstruction, enlargement, relocation, or alteration of a structure, or any change in the use of land or structures requested by this application will comply with and conform to all applicable laws of the State of Indiana and the Carmel Unified Development Ordinance (Z-625-17) and amendments, adopted under authority of I.C. 36-7 et seq, General Assembly of the State of Indiana, and all Acts amendatory thereto. I further certify that only kitchen, bath, and floor drains are connected to the sanitary sewer. I further certify that the construction will not be used or occupied until a Certificate of Occupancy or of Substantial Completion has been issued by the Department of Community Services, Carmel, Indiana. Signature of Owner or Authorized Agent _______________________________________________________________ Date__________________________________ 19030052 H. Bledsoe Construction, Inc. 31-446-5289 3299 S. Meridian Street Indianapolis IN 46217 m.hickey@bledsoeconstruction.c APS Indy, Inc.PC19600031 Carmel Drive Professional Partners, L 317-844-6284 715 West Carmel Drive, Suite 201 Carmel IN 46032 715 West Carmel Drive, Su Carmel IN 46032 Dr. Carrie Klene Office Build Out 209,572.00 2,190 405799 2/15/19 II-B, SPK B, REM Michael Hickey 3/8/2019 03/22/19 Mike Sheeks